COMPANY RECORD · NEW YORK, NY
Brick By Brick Builders — permit history in New York, NY
Brick By Brick Builders appears on 33 New York permit records from 2022 through 2026, most often general construction (57.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 19 | 57.6% |
| Mechanical / HVAC | 14 | 42.4% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2022 | 2 |
| 2023 | 7 |
| 2024 | 10 |
| 2025 | 4 |
| 2026 | 10 |
Busiest year on record: 2024, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Firequest Corp | 9 | 2026-06-22 |
| Dependable Mech Corp | 4 | 2026-06-17 |
| Impact Plumbing Inc | 4 | 2024-10-16 |
| Starlite Plumbing Corp | 3 | 2026-08-04 |
| M&D Fire Sprinkler Inc | 2 | 2026-08-04 |
| Bent Mechanical Corp | 1 | 2024-04-03 |
| Dependable Mechanical Cor | 1 | 2026-06-16 |
7 companies are named alongside Brick By Brick Builders on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 55 BROADWAY | 2026-08-05 |
| 184 THOMPSON STREET | 2025-11-21 |
| 215 BAY STREET | 2025-10-30 |
| 780 3 AVENUE | 2024-10-14 |
| 24 WEST 40 STREET | 2024-07-05 |
| 600 HYLAN BOULEVARD | 2023-07-05 |
6 distinct addresses on record. Declared value on record runs from $5,000 to $643,943, median $50,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
33 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01412941-S1-MS | 2026-08-05 | Mechanical / HVAC | 55 BROADWAY | MECHANICAL DUCTWORK AND ASSOCIATED PIPING ON 6TH FLOOR IN COMMON AREA AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $13,200 |
| M01412941-I1-GC | 2026-08-05 | General construction | 55 BROADWAY | 6TH FLOOR COMMON AREA RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $213,000 |
| M01394634-S1-MS | 2026-07-21 | Mechanical / HVAC | 55 BROADWAY | SUITE 601. MECHANICAL DUCTWORK AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $43,626 |
| M01394634-I1-GC | 2026-07-21 | General construction | 55 BROADWAY | SUITE 601. OFFICE RENOVATION ON 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $249,555 |
| M01393238-S1-MS | 2026-06-22 | Mechanical / HVAC | 55 BROADWAY | SUITE 602. MECHANICAL DUCTWORK AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $88,000 |
| M01393238-I1-GC | 2026-06-16 | General construction | 55 BROADWAY | SUITE 602. OFFICE RENOVATION ON 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $294,994 |
| M01392099-I1-GC | 2026-06-16 | General construction | 55 BROADWAY | COMMERCIAL SPACE RENOVATION ON 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $175,540 |
| M01392099-S1-MS | 2026-06-16 | Mechanical / HVAC | 55 BROADWAY | MECHANICAL DUCTWORK AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $33,800 |
| M01319021-I1-GC | 2026-03-05 | General construction | 55 BROADWAY | GENERAL CONSTRUCTION FOR THE INTERIOR FIT-OUT FOR A COMMERICAL OFFICE USE.NO CHANGE IN OCCUPANCY OR EGRESS | $220,232 |
| M01319021-S1-MS | 2026-03-05 | Mechanical / HVAC | 55 BROADWAY | MECHANICAL RELATED WORK FOR THE INTERIOR FIT-OUT OF A COMMERICAL OFFICE. NO CHANGE IN OCCUPANCY OR EGRESS | $12,000 |
| M01288857-I1-GC | 2025-11-21 | General construction | 184 THOMPSON STREET | Herewith requesting to file a new storefront on the cellar level with a demising wall as per the plans. No change in use, egress or occupancy, | $40,000 |
| S01262164-I1-GC | 2025-10-30 | General construction | 215 BAY STREET | APPLICATION IS FILED FOR EXTERIOR WALL TO BE REPAIRED TO PREVIOUSLY EXISTING CONDITIONS DUE TO VEHICLE DAMAGE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS O | $5,000 |
| M01115795-I1-GC | 2025-01-06 | General construction | 55 BROADWAY | INTERIOR RENOVATION OF 15TH FL OFFICE SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS | $250,000 |
| M01115795-S1-MS | 2025-01-06 | Mechanical / HVAC | 55 BROADWAY | MODIFICATION TO HVAC EQUIPMENT IN 15TH FLOOR OFFICE SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS | $36,000 |
| M01120096-S1-MS | 2024-10-14 | Mechanical / HVAC | 780 3 AVENUE | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS ON 8TH FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS | $40,000 |
| M01120106-I1-GC | 2024-10-11 | General construction | 780 3 AVENUE | INTERIOR ALTERATIONS TO EXISTING 20TH FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS | $80,000 |
| M01120106-S1-MS | 2024-10-09 | Mechanical / HVAC | 780 3 AVENUE | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS IN 20TH FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS | $40,000 |
| M01120096-I1-GC | 2024-10-09 | General construction | 780 3 AVENUE | INTERIOR ALTERATIONS TO EXISTING 8TH FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS | $80,000 |
| M01081502-S1-MS | 2024-07-25 | Mechanical / HVAC | 780 3 AVENUE | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS | $30,000 |
| M01081502-I1-GC | 2024-07-25 | General construction | 780 3 AVENUE | INTERIOR ALTERATIONS TO EXISTING COMMERCIAL OFFICE SPACE ON 30TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS | $50,000 |
| M01062727-I1-GC | 2024-07-05 | General construction | 24 WEST 40 STREET | ADDITION OF A NEW GLASS DOOR AND SIDELITE AT THE ELEVATOR LOBBY OF THE SPACE. THE NEW GLASS DOOR SHALL RECEIVE NEW MAGLOCK HARDWARE AS WELL AS A NEW CARD READER AND DOOR RELEASE BU | $25,000 |
| M00977555-I1-GC | 2024-06-12 | General construction | 24 WEST 40 STREET | THIS APPLICATION IS A MINOR RENOVATION TO AN EXISTING SPACE AND CHANGE OCCUPANCY GROUP ON 6TH FLR FROM OFFICES & SHOWROOM USE GROUP VII TO PRODUCTION STUDIO USE GROUP VIII. THIS FI | $643,943 |
| M00999893-S1-MS | 2024-04-03 | Mechanical / HVAC | 55 BROADWAY | MODIFICATION TO HVAC EQUIPMENT IN 10TH FLOOR OFFICE SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS | $120,000 |
| M00999893-I1-GC | 2024-03-11 | General construction | 55 BROADWAY | INTERIOR RENOVATION OF 10TH FL OFFICE SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS | $468,000 |
| M00732719-I1-MS | 2023-09-14 | Mechanical / HVAC | 55 BROADWAY | Modification of the mechanical system on the 21st FL office space. No change of use, egress or occupancy. | $26,000 |
| S00874888-I1-GC | 2023-07-05 | General construction | 600 HYLAN BOULEVARD | Interior apartment renovation in unit #2A and #3A as per plan submitted herewith. No change in use, egress, or occupancy under this application. | $120,600 |
| M00829366-I1-GC | 2023-06-21 | General construction | 55 BROADWAY | FILING FOR THE INTERIOR RENOVATION OF THE RETAIL SPACE, ASPER PLANS FILED HEREWITH. NO CHANGE TO USE,EGRESS OR OCCUPANCY | $161,000 |
| S00840259-I1-GC | 2023-06-08 | General construction | 600 HYLAN BOULEVARD | Interior apartment renovation in unit #6A and #7A as per plan submitted herewith. No change in use, egress, or occupancy under this application. | $120,600 |
| S00853152-I1-GC | 2023-06-08 | General construction | 600 HYLAN BOULEVARD | Interior apartment renovation in unit #4A and #5A as per plan submitted herewith. No change in use, egress, or occupancy under this application. | $120,600 |
| S00821414-I1-GC | 2023-05-03 | General construction | 600 HYLAN BOULEVARD | Interior apartment renovation in unit #2G to address open ECB Violation#39077230Y. No change in use, egress, or occupancy under this application. | $45,500 |
| M00826975-I1-MS | 2023-04-25 | Mechanical / HVAC | 55 BROADWAY | MODIFICATION OF DUCTWORK AND RELATED AIR DISTRIBUTION SYSTEM, ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $25,000 |
| M00732658-I1-MS | 2022-09-05 | Mechanical / HVAC | 55 BROADWAY | Modification to the Mechanical system on the 11th FL office space. No change of use, egress or occupancy. | $28,000 |
| M00732985-I1-MS | 2022-09-05 | Mechanical / HVAC | 55 BROADWAY | Modification to the existing MH system on the 16th FL office space. No change in use, egress or occupancy. | $23,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
