COMPANY RECORD · NEW YORK, NY
Black Bull Bulders LLC — permit history in New York, NY
Black Bull Bulders LLC appears on 120 New York permit records from 2020 through 2026, most often general construction (54.1% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 66 | 54.1% |
| Mechanical / HVAC | 56 | 45.9% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 6 |
| 2021 | 23 |
| 2022 | 19 |
| 2023 | 15 |
| 2024 | 18 |
| 2025 | 33 |
| 2026 | 8 |
Busiest year on record: 2025, with 33 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Commerical Plbg Svces LLC | 2 | 2024-08-15 |
| 2M Mechanical LLC | 1 | 2023-07-20 |
| A&A Plumbing Corp | 1 | 2023-05-25 |
| Complete Plbg Safety LLC | 1 | 2026-08-20 |
| Go Pro Fire Protection C | 1 | 2026-08-24 |
| Zone Mechanical LLC | 1 | 2024-06-25 |
6 companies are named alongside Black Bull Bulders LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 25 KENT AVENUE | 2026-08-05 |
| 59-17 JUNCTION BOULEVARD | 2026-05-26 |
| 261 11 AVENUE | 2026-04-23 |
| 420 EAST 54 STREET | 2026-01-23 |
| 600 THIRD AVENUE | 2025-12-01 |
| 600 LEXINGTON AVENUE | 2025-11-24 |
| 96-05 HORACE HARDING EXPRESSWAY | 2025-10-16 |
| 255 GREENWICH STREET | 2025-09-08 |
| 71 GANSEVOORT STREET | 2025-05-29 |
| 685 THIRD AVENUE | 2024-12-10 |
| 95-15 HORACE HARDING EXPRESSWAY | 2024-10-21 |
| 28 WEST 22 STREET | 2024-05-24 |
| 399 PARK AVENUE | 2024-02-20 |
| 45 ROCKEFELLER PLAZA | 2023-11-08 |
34 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,234 to $3,599,914, median $99,999. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
120 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B01427252-I1-GC | 2026-08-05 | General construction | 25 KENT AVENUE | Hereby filing to construct interior partitions, ceilings, and doors for new office suites as shown on plans filed herewith. No change to use, occupancy or egress. | $225,000 |
| B01427252-S1-MS | 2026-08-03 | Mechanical / HVAC | 25 KENT AVENUE | Hereby filing to modify and install mechanical units with associated ductwork and piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress. | $100,002 |
| Q01356141-I1-GC | 2026-05-26 | General construction | 59-17 JUNCTION BOULEVARD | General construction work as per plans filed herewith. No change to use egress or occupancy. | $100,000 |
| Q01287674-I1-MS | 2026-05-15 | Mechanical / HVAC | 59-17 JUNCTION BOULEVARD | DEP BATHROOM - MECHANICAL VENTILATION WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $50,000 |
| Q01287581-I1-GC | 2026-05-14 | General construction | 59-17 JUNCTION BOULEVARD | DEP Core Bathroom - 11TH FLOOR CORE BATHROOM RENOVATION AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $100,000 |
| M01338911-I1-GC | 2026-04-23 | General construction | 261 11 AVENUE | General construction on floors Cel and 1st as per plans filed herewith. No changes in use, egress or occupancy. | $762,957 |
| M01338914-I1-MS | 2026-04-23 | Mechanical / HVAC | 261 11 AVENUE | Mechanical modifications on floors Cel and 1st as per plans filed herewith. No changes in use, egress or occupancy. | $371,467 |
| M01325086-I1-GC | 2026-01-23 | General construction | 420 EAST 54 STREET | GENERAL CONSTRUCTION WORK IN APT. 2901 TO CREATE A NEW BEDROOM AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $20,000 |
| M01322179-I1-GC | 2025-12-01 | General construction | 600 THIRD AVENUE | General construction modifications as per plans filed herewith. No change in use, egress or occupancy. | $169,220 |
| M01322179-S1-MS | 2025-12-01 | Mechanical / HVAC | 600 THIRD AVENUE | Mechanical Modifications as per plans filed herewith no change in use, egress or occupancy. | $194,700 |
| M01311756-I1-GC | 2025-11-24 | General construction | 600 LEXINGTON AVENUE | Filing herewith drawings indicating interior non-structural demolition on the 33rd floor construction (marketing as the 34th floor). No change in use, egress, or occupancy under th | $15,970 |
| M01311476-I1-MS | 2025-11-24 | Mechanical / HVAC | 600 LEXINGTON AVENUE | Filing herewith drawings indicating modification of the mechanical system on the 32nd floor construction (marketing as the 33rd floor). No change in use, egress, or occupancy under | $14,955 |
| M01311773-I1-MS | 2025-11-24 | Mechanical / HVAC | 600 LEXINGTON AVENUE | Filing herewith drawings indicating modification of the mechanical system on the 33rd floor construction (marketing as the 34th floor). No change in use, egress, or occupancy under | $14,955 |
| M01311247-I1-GC | 2025-11-20 | General construction | 600 LEXINGTON AVENUE | Filing herewith drawings indicating interior non-structural demolition on the 32nd floor construction (marketing as the 33rd floor). No change in use, egress, or occupancy under th | $15,970 |
| Q00798406-I1-GC | 2025-10-22 | General construction | 59-17 JUNCTION BOULEVARD | Removal of existing wall base, flooring, lights and ceilings. Installation of new wall base, light fixtures, ceiling, painting and flooring (DEP Elevator Lobby) as per the plans f | $100,000 |
| Q01286750-I1-MS | 2025-10-16 | Mechanical / HVAC | 96-05 HORACE HARDING EXPRESSWAY | Mechanical system renovations (B1) as per plans filed herewith. No change to use, egress or occupancy. | $50,000 |
| Q01286552-I1-MS | 2025-10-16 | Mechanical / HVAC | 96-05 HORACE HARDING EXPRESSWAY | Mechanical system renovations (A4) as per plans filed herewith. No change to use, egress or occupancy. | $50,000 |
| Q00919605-I1-MS | 2025-10-10 | Mechanical / HVAC | 96-05 HORACE HARDING EXPRESSWAY | Mechanical system renovations as per plans filed herewith. No change to use, egress or occupancy. | $50,000 |
| Q01225051-I1-GC | 2025-10-09 | General construction | 96-05 HORACE HARDING EXPRESSWAY | General construction of interior office space (B1) as per plans filed herewith. No change to use, egress or occupancy. | $100,000 |
| Q01286541-I1-GC | 2025-10-09 | General construction | 96-05 HORACE HARDING EXPRESSWAY | General construction of interior office space (A4) as per plans filed herewith. No change to use, egress or occupancy. | $100,000 |
| Q00940285-I1-MS | 2025-09-30 | Mechanical / HVAC | 96-05 HORACE HARDING EXPRESSWAY | Mechanical application to renovate existing mechanical systems including demo of fans, ductwork and associated piping. No change use, egress, or occupancy as per plans filed herewi | $150,000 |
| Q00940195-I1-GC | 2025-09-15 | General construction | 96-05 HORACE HARDING EXPRESSWAY | General construction of interior office space including demo of non-load bearing partitions. No change to use, egress or occupancy. | $350,000 |
| Q00919587-I1-GC | 2025-09-09 | General construction | 96-05 HORACE HARDING EXPRESSWAY | General construction of interior office space as per plans filed herewith. No change to use, egress or occupancy. | $250,000 |
| M01232357-I1-MS | 2025-09-08 | Mechanical / HVAC | 255 GREENWICH STREET | Modifications to mechanical systems as per plans filed herewith. No change of use, occupancy, or egress | $199,972 |
| M01232315-I1-GC | 2025-09-08 | General construction | 255 GREENWICH STREET | INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY | $622,000 |
| M01246744-I1-GC | 2025-08-25 | General construction | 600 THIRD AVENUE | General Construction modifications on the ground floor as per plans filed herewith. No change in use, egress or occupancy. | $28,800 |
| M01246693-I1-GC | 2025-07-23 | General construction | 600 THIRD AVENUE | General Construction modifications to include demo work and interior renovations on the 20th floor as per plans filed herewith. No change in use, egress or occupancy. | $30,001 |
| M01237007-I1-MS | 2025-06-27 | Mechanical / HVAC | 600 LEXINGTON AVENUE | Filing herewith drawings indicating modification of the Mechanical system on the 25th floor construction (marketing as the 26th floor). No change in use, egress, or occupancy under | $284,692 |
| M01236746-I1-GC | 2025-06-25 | General construction | 600 LEXINGTON AVENUE | Filing herewith drawings indicating interior renovations on the 25th floor construction (marketing as the 26th floor). No change in use, egress, or occupancy under this application | $106,853 |
| M01234498-I1-MS | 2025-06-25 | Mechanical / HVAC | 600 LEXINGTON AVENUE | Filing herewith drawings indicating modification of the Mechanical system on the 16th floor construction (marketing as the 17th floor). No change in use, egress, or occupancy under | $360,234 |
| M01232295-I1-GC | 2025-06-16 | General construction | 600 LEXINGTON AVENUE | Filing herewith drawings indicating interior renovations on the 16th floor construction (marketing as the 17th floor). No change in use, egress, or occupancy under this application | $135,088 |
| M01074362-I1-MS | 2025-05-29 | General construction | 71 GANSEVOORT STREET | ALTERATION AND CONVERSION OF AN EXISTING 'EATING AND DRINKING PLACE' TO RETAIL SPACE. CHANGE OF BUILDING CODE OCCUPANCY. NO CHANGE TO ZONING USE GROUP OR EGRESS. | $40,000 |
| M01074362-I1-MS | 2025-05-29 | Mechanical / HVAC | 71 GANSEVOORT STREET | ALTERATION AND CONVERSION OF AN EXISTING 'EATING AND DRINKING PLACE' TO RETAIL SPACE. CHANGE OF BUILDING CODE OCCUPANCY. NO CHANGE TO ZONING USE GROUP OR EGRESS. | $40,000 |
| M01188525-I1-GC | 2025-05-08 | General construction | 600 THIRD AVENUE | General Construction modifications to include demo work and interior renovations on the ground floor as per plans filed herewith. No change in use, egress or occupancy. | $48,500 |
| Q01096473-I1-GC | 2025-03-11 | General construction | 96-05 HORACE HARDING EXPRESSWAY | GC filing consisting of Interior Demo as per the plans filed herewith. No change to use, egress, or occupancy.. | $175,000 |
| M01074362-I1-GC | 2025-02-27 | General construction | 71 GANSEVOORT STREET | ALTERATION AND CONVERSION OF AN EXISTING 'EATING AND DRINKING PLACE' TO RETAIL SPACE. CHANGE OF BUILDING CODE OCCUPANCY. NO CHANGE TO ZONING USE GROUP OR EGRESS. | $40,000 |
| M01074362-I1-GC | 2025-02-27 | Mechanical / HVAC | 71 GANSEVOORT STREET | ALTERATION AND CONVERSION OF AN EXISTING 'EATING AND DRINKING PLACE' TO RETAIL SPACE. CHANGE OF BUILDING CODE OCCUPANCY. NO CHANGE TO ZONING USE GROUP OR EGRESS. | $40,000 |
| Q00919195-I1-MS | 2025-02-14 | Mechanical / HVAC | 96-05 HORACE HARDING EXPRESSWAY | Mechanical application to remove existing mechanical systems including fans and ductwork. No change use, egress, or occupancy as per plans filed herewith. | $50,000 |
| Q00919106-I1-GC | 2025-02-10 | General construction | 96-05 HORACE HARDING EXPRESSWAY | Architectural work type for interior renovations to office space as per plans filed herewith. No change to use, egress, or occupancy.. | $175,000 |
| Q01028911-I1-MS | 2025-02-07 | Mechanical / HVAC | 59-17 JUNCTION BOULEVARD | Mechanical plans filed herewith to install new balancing dampers on supply and exhaust branches. No change to use, egress, or occupancy. | $4,000 |
| Q01028907-I1-GC | 2025-01-10 | General construction | 59-17 JUNCTION BOULEVARD | General Construction filing to show bathroom renovation of approximately 65 SF total on the 16h floor. No change to use, egress, or occupancy. | $15,000 |
| M01133241-I1-MS | 2024-12-10 | Mechanical / HVAC | 685 THIRD AVENUE | MECHANICAL MODIFICATIONS TAKING PLACE ON THE 27TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $89,280 |
| M01133238-I1-GC | 2024-11-25 | General construction | 685 THIRD AVENUE | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 27TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANCE IN USE, EGRESS OR OCCUPANCY. | $302,560 |
| Q01083739-I1-MS | 2024-10-21 | Mechanical / HVAC | 95-15 HORACE HARDING EXPRESSWAY | HVAC Work as per plans filed herewith. No change to use egress or occupancy. | $20,000 |
| Q01083707-I1-GC | 2024-10-09 | General construction | 95-15 HORACE HARDING EXPRESSWAY | GC filing for Interior Demo as per the plans filed herewith. No change to use egress or occupancy. | $22,000 |
| M01100303-I1-GC | 2024-09-10 | General construction | 685 THIRD AVENUE | General Construction to take place on the 17th floor as per plans filed herewith. No change in use, egress, or occupancy. | $200,000 |
| M01100318-I1-MS | 2024-09-09 | Mechanical / HVAC | 685 THIRD AVENUE | Mechanical modifications to take place on the 17th floor as per drawings filed herewith. No change in use, egress, or occupancy. | $15,000 |
| M01019599-S1-MS | 2024-05-24 | Mechanical / HVAC | 28 WEST 22 STREET | Relocate and reconnect existing Mechanical System elements per submitted plans to accommodate new drop ceiling. | $48,000 |
| Q00959122-I1-GC | 2024-04-18 | General construction | 59-17 JUNCTION BOULEVARD | General construction for renovation of office space as per plans filed herewith. No change to use, egress or occupancy. | $425,000 |
| Q00959167-I1-MS | 2024-04-18 | Mechanical / HVAC | 59-17 JUNCTION BOULEVARD | Mechanical systems renovation of office space as per plans filed herewith. No change to use, egress or occupancy. | $175,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
