COMPANY RECORD · NEW YORK, NY

Bethel Building Corp — permit history in New York, NY

Bethel Building Corp appears on 43 New York permit records from 2024 through 2026, most often general construction (67.3% of the record).

Permit categories

CategoryPermitsShare
General construction3567.3%
Mechanical / HVAC1732.7%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
202423
202511
202618

Busiest year on record: 2024, with 23 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Premier Pl,Htg & Mech Inc132026-06-16
K.M.D Mechanical 1443 LLC52026-07-28
Quality Plumbing, Inc12025-09-15

3 companies are named alongside Bethel Building Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
79B SOUTH GOFF AVENUE2026-07-08
14 BAYARD STREET2026-07-08
492 DOANE AVENUE2026-06-17
490 DOANE AVENUE2026-06-16
1018 IONIA AVENUE2026-05-12
1024 IONIA AVENUE2026-05-12
79C SOUTH GOFF AVENUE2026-04-08
79A SOUTH GOFF AVENUE2026-01-15
489 COLON AVENUE2025-09-17
493 COLON AVENUE2025-09-16
347 BEACH AVENUE2025-09-05
497 COLON AVENUE2025-06-03
486 DOANE AVENUE2025-04-16
484 DOANE AVENUE2025-04-16

19 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $0, median $0. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

43 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
S00910696-I1-MS2026-07-08Mechanical / HVAC79B SOUTH GOFF AVENUEPLANS REVISED TO COMPLY WITH AMENDED ZONING CHANGE DATE 12/5/2024. CONSTRUCT 3-STORY, DETACHED TWO FAMILY DWELLING.$0
S01254881-I1-GC-CX2026-07-08General construction14 BAYARD STREETConstruct a two-family residence with accessory off-street parking for one car.$0
S01254881-S3-MS2026-07-08Mechanical / HVAC14 BAYARD STREETINSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING$0
S00910696-I1-MS2026-07-08General construction79B SOUTH GOFF AVENUEPLANS REVISED TO COMPLY WITH AMENDED ZONING CHANGE DATE 12/5/2024. CONSTRUCT 3-STORY, DETACHED TWO FAMILY DWELLING.$0
S00951454-S1-MS2026-06-17Mechanical / HVAC492 DOANE AVENUEINSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITHNB APPLICATION FILED UNDER INITIAL FILING$0
S00951446-I1-ST2026-06-16General construction490 DOANE AVENUECONSTRUCT A ONE FAMILY DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS$0
S00951446-I1-FO2026-06-16General construction490 DOANE AVENUECONSTRUCT A ONE FAMILY DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS$0
S00951454-I1-ST2026-06-16General construction492 DOANE AVENUECONSTRUCT A TWO-FAMILY DWELLING WITH BUILT-IN TWO CAR GARAGE$0
S00951454-I1-FO2026-06-16General construction492 DOANE AVENUECONSTRUCT A TWO-FAMILY DWELLING WITH BUILT-IN TWO CAR GARAGE$0
S01338820-I1-GC2026-05-12General construction1018 IONIA AVENUECONSTRUCT 3-STORY, DETACHED TWO FAMILY DWELLING.$0
S01338823-I1-GC2026-05-12Mechanical / HVAC1024 IONIA AVENUECONSTRUCT 3-STORY, DETACHED TWO FAMILY DWELLING.$0
S01338820-I1-GC2026-05-12Mechanical / HVAC1018 IONIA AVENUECONSTRUCT 3-STORY, DETACHED TWO FAMILY DWELLING.$0
S01338823-I1-GC2026-05-12General construction1024 IONIA AVENUECONSTRUCT 3-STORY, DETACHED TWO FAMILY DWELLING.$0
S01231060-S2-MS2026-04-08Mechanical / HVAC79C SOUTH GOFF AVENUEINSTALLATION OF NEW HVAC & ERV SYSTEMS ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING$0
S01231060-I1-GC2026-01-21General construction79C SOUTH GOFF AVENUECONSTRUCT 3-STORY, DETACHED TWO FAMILY DWELLING.$0
S01231060-I1-GC2026-01-21Mechanical / HVAC79C SOUTH GOFF AVENUECONSTRUCT 3-STORY, DETACHED TWO FAMILY DWELLING.$0
S00910692-I1-MS2026-01-15Mechanical / HVAC79A SOUTH GOFF AVENUEPLANS REVISED TO COMPLY WITH AMENDED ZONING CHANGE DATE 12/5/2024. CONSTRUCT THREE STORY, DETACHED TWO FAMILY DWELLING.$0
S00910692-I1-MS2026-01-15General construction79A SOUTH GOFF AVENUEPLANS REVISED TO COMPLY WITH AMENDED ZONING CHANGE DATE 12/5/2024. CONSTRUCT THREE STORY, DETACHED TWO FAMILY DWELLING.$0
S00951446-S1-MS2025-10-30Mechanical / HVAC490 DOANE AVENUE1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.$0
S00975478-S2-MS2025-09-17Mechanical / HVAC489 COLON AVENUE1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.$0
S00975476-S3-MS2025-09-16Mechanical / HVAC493 COLON AVENUE1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.$0
S01263180-I1-GC-CX2025-09-05General construction347 BEACH AVENUECONSTRUCT DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS.$0
S00982569-I1-GC2025-06-03General construction497 COLON AVENUECONSTRUCT AN ACCESSORY ANCILLARY DWELLING UNIT (ADU) ATTACHED TO A TWO-FAMILY DWELLING. THE MAIN FRONT ENTRANCE OF THE ADU DIRECTLY OPENS TO THE STREET FRONTAGE YARD.$0
S00951454-I1-GC2025-05-19General construction492 DOANE AVENUECONSTRUCT A TWO-FAMILY DWELLING WITH BUILT-IN TWO CAR GARAGE$0
S00951446-I1-GC2025-05-15General construction490 DOANE AVENUECONSTRUCT A ONE FAMILY DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS$0
S00975476-I1-ST2025-05-12General construction493 COLON AVENUECONSTRUCT A ONE FAMILY DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS$0
S00975478-I1-ST2025-05-12General construction489 COLON AVENUEConstruct a two family residence with accessory off-street parking for two cars.$0
S00899276-S2-MS2025-04-16Mechanical / HVAC486 DOANE AVENUE1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.$0
S00899277-S2-MS2025-04-16Mechanical / HVAC484 DOANE AVENUE1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.$0
S00957879-I1-GC-CX2024-11-18General construction63GAR BAYVIEW TERRACECONSTRUCT ONE STORY DETACHED GARAGE$0
S00957992-I1-GC-CX2024-11-18General construction69GAR BAYVIEW TERRACECONSTRUCT ONE STORY DETACHED GARAGE$0
S00957997-I1-GC2024-11-14General construction69 BAYVIEW TERRACECONSTRUCT THREE STORY DETACHED, TWO FAMILY DWELLING.$0
S00957997-I1-GC2024-11-14Mechanical / HVAC69 BAYVIEW TERRACECONSTRUCT THREE STORY DETACHED, TWO FAMILY DWELLING.$0
S00957876-I1-GC-CX2024-11-14Mechanical / HVAC63 BAYVIEW TERRACECONSTRUCT THREE STORY DETACHED, TWO FAMILY DWELLING.$0
S00957876-I1-GC-CX2024-11-14General construction63 BAYVIEW TERRACECONSTRUCT THREE STORY DETACHED, TWO FAMILY DWELLING.$0
S00975476-I1-FO2024-10-11General construction493 COLON AVENUECONSTRUCT A ONE FAMILY DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS$0
S00975478-I1-FO2024-10-11General construction489 COLON AVENUEConstruct a two family residence with accessory off-street parking for two cars.$0
S00975476-I1-GC2024-09-24General construction493 COLON AVENUECONSTRUCT A ONE FAMILY DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS$0
S00975478-I1-GC2024-09-24General construction489 COLON AVENUEConstruct a two family residence with accessory off-street parking for two cars.$0
S00910692-I1-GC-CX2024-09-16Mechanical / HVAC79A SOUTH GOFF AVENUEPLANS REVISED TO COMPLY WITH AMENDED ZONING CHANGE DATE 12/5/2024. CONSTRUCT THREE STORY, DETACHED TWO FAMILY DWELLING.$0
S00910692-I1-GC-CX2024-09-16General construction79A SOUTH GOFF AVENUEPLANS REVISED TO COMPLY WITH AMENDED ZONING CHANGE DATE 12/5/2024. CONSTRUCT THREE STORY, DETACHED TWO FAMILY DWELLING.$0
S00910696-I1-GC-CX2024-09-16Mechanical / HVAC79B SOUTH GOFF AVENUEPLANS REVISED TO COMPLY WITH AMENDED ZONING CHANGE DATE 12/5/2024. CONSTRUCT 3-STORY, DETACHED TWO FAMILY DWELLING.$0
S00910696-I1-GC-CX2024-09-16General construction79B SOUTH GOFF AVENUEPLANS REVISED TO COMPLY WITH AMENDED ZONING CHANGE DATE 12/5/2024. CONSTRUCT 3-STORY, DETACHED TWO FAMILY DWELLING.$0
S00975480-I1-ST2024-08-06General construction489GAR COLON AVENUEConstruct an accessory detached one car garage.$0
S00975480-I1-FO2024-08-05General construction489GAR COLON AVENUEConstruct an accessory detached one car garage.$0
S00975480-I1-GC2024-07-31General construction489GAR COLON AVENUEConstruct an accessory detached one car garage.$0
S00899276-I1-FO2024-07-31General construction486 DOANE AVENUECONSTRUCT A ONE FAMILY DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS$0
S00899276-I1-ST2024-07-31General construction486 DOANE AVENUECONSTRUCT A ONE FAMILY DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS$0
S00899277-I1-FO2024-07-31General construction484 DOANE AVENUECONSTRUCT A ONE FAMILY DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS.$0
S00899277-I1-ST2024-07-31General construction484 DOANE AVENUECONSTRUCT A ONE FAMILY DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS.$0

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →