COMPANY RECORD · NEW YORK, NY
Avante Contracting Corp — permit history in New York, NY
Avante Contracting Corp appears on 57 New York permit records from 2021 through 2026, most often mechanical / hvac (52.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 30 | 52.6% |
| General construction | 27 | 47.4% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 5 |
| 2022 | 1 |
| 2023 | 28 |
| 2024 | 9 |
| 2025 | 8 |
| 2026 | 6 |
Busiest year on record: 2023, with 28 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Katan P & H Inc | 5 | 2026-07-20 |
| Mo Contracting Inc | 4 | 2025-07-16 |
2 companies are named alongside Avante Contracting Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 528 WEST 123 STREET | 2026-05-13 |
| 906 EAST 178 STREET | 2026-05-05 |
| 912 EAST 178 STREET | 2026-05-05 |
| 485 FIRST AVENUE | 2025-12-17 |
| 1039 BOSTON ROAD | 2025-07-15 |
| 2185 ADAM CLAYTON POWELL JR BOULEVARD | 2025-02-18 |
| 3103 3 AVENUE | 2025-01-07 |
| 204 WEST 120 STREET | 2024-12-18 |
| 150 WEST 121 STREET | 2024-12-09 |
| 271 WEST 126 STREET | 2024-08-15 |
| 305 WEST 126 STREET | 2024-04-12 |
| 110 HAMILTON PLACE | 2024-01-17 |
| 531 WEST 145 STREET | 2023-12-28 |
| 115 HAMILTON PLACE | 2023-12-13 |
32 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $6,105,000, median $193,860. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
57 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M00583331-I1-GC-CX | 2026-05-13 | General construction | 528 WEST 123 STREET | Building Renovation Program including general construction & structural repair work. No change to use, egress or occupancy. | $871,792 |
| M00546536-I1-MS | 2026-05-08 | Mechanical / HVAC | 528 WEST 123 STREET | Mechanical work limited to replacement of one existing roof exhaust fan and install fire damper as needed. No change to use, egress or occupancy. | $7,400 |
| X01218534-S2-MS | 2026-05-05 | Mechanical / HVAC | 906 EAST 178 STREET | MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT AND REPLACEMENT OF ASSOCIATED DUCTWORK. SEE ADDITIONAL SUBSEQUENT FILINGS FOR BOILER AND PLUMBING SCOPE. NO CHANGE IN USE, EGRE | $376,234 |
| X01218758-S2-MS | 2026-05-05 | Mechanical / HVAC | 912 EAST 178 STREET | MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT AND REPLACEMENT OF ASSOCIATED DUCTWORK. SEE ADDITIONAL SUBSEQUENT FILINGS FOR BOILER AND PLUMBING SCOPE. NO CHANGE IN USE, EGRE | $660,016 |
| X01218534-I1-GC | 2026-04-21 | General construction | 906 EAST 178 STREET | INTERIOR RENOVATION OF EX. BUILDING, NEW FINISHES & REPLACEMENT OF WIND/DOORS. ROOF REPLACEMENT. REPLACEMENT OF KITCHEN/BATH FIXTURES. NEW LED INT/ EXT LIGHTING. MINOR MASONRY & FA | $1,590,155 |
| X01218758-I1-GC | 2026-04-16 | General construction | 912 EAST 178 STREET | INTERIOR RENOVATION OF EX. BUILDING, NEW FINISHES & REPLACEMENT OF WIND/DOORS. ROOF REPLACEMENT. REPLACEMENT OF KITCHEN/BATH FIXTURES. NEW LED INT/ EXT LIGHTING. MINOR MASONRY & FA | $2,299,440 |
| M01319998-S1-MS | 2025-12-17 | Mechanical / HVAC | 485 FIRST AVENUE | REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERM | $35,000 |
| M01319998-I1-GC | 2025-12-12 | General construction | 485 FIRST AVENUE | MINOR INTERIOR RENOVATION OF 5 DWELLING UNITS WITHIN EXISTING BUILDING, INCLUDING NEW FINISHES, APPLIANCES, AND PLUMBING FIXTURES AT BATHROOMS AND KITCHENS. WORK AT RESIDENTIAL LOB | $150,000 |
| X01159041-S2-MS | 2025-07-15 | Mechanical / HVAC | 1039 BOSTON ROAD | REHABILITATION OF EXISTING HVAC SYSTEMS | $250,000 |
| X01159041-I1-GC | 2025-04-21 | General construction | 1039 BOSTON ROAD | Parking lot repairs, new roofing assembly, facade work, window and door repairs, masonry repairs, window replacements, lighting replacements. | $600,000 |
| M01136192-S1-MS | 2025-02-18 | Mechanical / HVAC | 2185 ADAM CLAYTON POWELL JR BOULEVARD | Additions/Modifications to mechanical systems as per plans herewith. No change to use, egress, or occupancy. | $193,860 |
| M01136192-I1-GC | 2025-01-13 | General construction | 2185 ADAM CLAYTON POWELL JR BOULEVARD | Interior and exterior renovations as per plans herewith. No change to use, egress, or occupancy. | $1,382,872 |
| X01078636-I1-GC | 2025-01-07 | General construction | 3103 3 AVENUE | Exterior door, asphalt, sidewalk, curb, brick, repair. Window replacement, parapet repair, lighting replacement, interior renovations throughout. No change to use egress or occupan | $1,800,000 |
| X01078636-S3-MS | 2025-01-07 | Mechanical / HVAC | 3103 3 AVENUE | Mechanical application filed to install VRF split systems | $50,000 |
| M00628833-I1-GC | 2024-12-18 | General construction | 204 WEST 120 STREET | RENOVATION OF A 6-STORY + CELLAR, MULTI-FAMILY, MASONRY BUILDING, BUILT IN 1930S; THE SCOPE INCLUDES NEW NON-STRUCTURAL PARTITIONS FOR NEW APARTMENT LAYOUTS, NEW FINISHES AND MINOR | $6,105,000 |
| M00667761-I1-MS | 2024-12-18 | Mechanical / HVAC | 204 WEST 120 STREET | THE SCOPE OF WORK CONSISTS OF THE INSTALLATION INCLUDING BUT NOT LIMITED TO, UNITIZED AIR-COOLED DX SPLIT VRF-TYPE HEAT PUMPS WITH WALL-MOUNTED UNITS FOR HEATING AND COOLING. MECHA | $966,000 |
| M00628815-I1-GC | 2024-12-09 | General construction | 150 WEST 121 STREET | RENOVATION OF A 4-STORY+CELLAR+BASEMENT, LANDMARK BROWNSTONE BUILDING, BUILT IN 1910; THE SCOPE INCLUDES NEW PARTITIONS FOR NEW APARTMENT LAYOUTS, NEW JOISTS, NEW FINISHES & FACADE | $2,199,050 |
| M00841357-I1-MS | 2024-12-02 | Mechanical / HVAC | 150 WEST 121 STREET | INSTALLATION OF UNITIZED AIR COOLED DX SPLIT VRF TYPE HEAT PUMPS W/ INTERIOR WALL MOUNTED UNITS FOR HEATING & COOLING. TOILET & KITCHEN EXHAUST SYSTEMS,VENTILATION FOR COMMON AREAS | $240,000 |
| M00628864-I1-GC | 2024-08-15 | General construction | 271 WEST 126 STREET | RENOVATION OF A 5-STORY+CELLAR, MULTI-FAMILY, MASONRY BUILDING, BUILT IN 1910; THE SCOPE INCLUDES NEW NON-STRUCTURAL PARTITIONS FOR NEW APARTMENT LAYOUTS, NEW FINISHES AND MINOR FA | $4,397,000 |
| M00628864-S1-MS | 2024-08-15 | Mechanical / HVAC | 271 WEST 126 STREET | INSTALL NEW WALL HIGH EFF. HEAT PUMPS FOR HEATING & COOLING. MECH. TX, KX, MECH. VENTILATION FOR COMMON AREAS VIA COOLING ONLY WITH ERV MODULE ROOF TOP UNIT & DX SPLIT VRF TYPE HEA | $543,000 |
| M00667575-I1-MS | 2024-04-12 | Mechanical / HVAC | 305 WEST 126 STREET | INSTALLATION OF THRU THE WALL HIGH EFFICIENCY HEAT PUMPS FOR HEATING & COOLING. TOILET AND KITCHEN EXHAUST SYSTEMS, MECHANICAL VENTILATION FOR COMMON AREAS VIA COOLING ONLY ROOF TO | $403,000 |
| M00627753-I1-GC | 2024-04-12 | General construction | 305 WEST 126 STREET | INTERIOR RENOVATION OF EXISTING BUILDING, NEW FINISHES, REPLACEMENT OF WINDOWS AND DOORS, AND REPLACEMENT OF KITCHEN AND BATHROOM FIXTURES. MINOR MASONRY REPAIR AND MINOR FACADE WO | $3,078,000 |
| M00869032-I1-MS | 2024-01-17 | Mechanical / HVAC | 110 HAMILTON PLACE | Respectfully filing for mechanical work as per proposed plans submitted. | $1,000 |
| M00749046-I1-GC | 2023-12-28 | General construction | 531 WEST 145 STREET | RENOVATION AND REHABILITATION OF EXISTING DWELLING UNITS AND COMMON SPACES WITHIN A 5 STORY MULTI-DWELLINGAPARTMENT HOUSING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M00869093-I1-MS | 2023-12-28 | Mechanical / HVAC | 531 WEST 145 STREET | Respectfully filing for mechanical work as per proposed plans submitted. | $1,000 |
| M00869018-I1-MS | 2023-12-13 | Mechanical / HVAC | 115 HAMILTON PLACE | Respectfully filing for mechanical work as per proposed plan submitted. | $1,000 |
| M00748880-I1-GC | 2023-12-13 | General construction | 115 HAMILTON PLACE | RENOVATION AND REHABILITATION OF EXISTING DWELLING UNITS AND COMMON SPACES WITHIN A 7 STORY MULTI-DWELLING APARTMENT HOUSING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M00748939-I1-GC | 2023-12-07 | General construction | 110 HAMILTON PLACE | RENOVATION AND REHABILITATION OF EXISTING DWELLING UNITS AND COMMON SPACES WITHIN A 7 STORY MULTI-DWELLINGAPARTMENT HOUSING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M00869060-I1-MS | 2023-11-22 | Mechanical / HVAC | 529 WEST 145 STREET | Respectfully filing for mechanical work as per proposed plans submitted. | $1,000 |
| M00749018-I1-GC | 2023-11-22 | General construction | 529 WEST 145 STREET | RENOVATION AND REHABILITATION OF EXISTING DWELLING UNITS AND COMMON SPACES WITHIN A 5 STORY MULTI-DWELLINGAPARTMENT HOUSING. EXTERIOR WORK TO INCLUDE MINOR REPAIR OF EXISTING EXTER | $1,000 |
| M00748959-I1-GC | 2023-10-17 | General construction | 504 WEST 142 STREET | RENOVATION AND REHABILITATION OF EXISTING DWELLING UNITS AND COMMON SPACES WITHIN A 4 STORY MULTI-DWELLINGAPARTMENT HOUSING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M00869044-I1-MS | 2023-10-17 | Mechanical / HVAC | 504 WEST 142 STREET | Respectfully filing for mechanical work as per proposed plans submitted. | $1,000 |
| M00748988-I1-GC | 2023-10-17 | General construction | 542 WEST 140 STREET | RENOVATION AND REHABILITATION OF EXISTING DWELLING UNITS AND COMMON SPACES WITHIN A 4 STORY MULTI-DWELLINGAPARTMENT HOUSING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M00869050-I1-MS | 2023-10-17 | Mechanical / HVAC | 542 WEST 140 STREET | Respectfully filing for mechanical work as per proposed plans submitted. | $1,000 |
| B00609703-I1-MS | 2023-09-19 | Mechanical / HVAC | 373 DEWITT AVENUE | Filing of an Alt2 mechanical application | $30,000 |
| B00867849-I1-GC | 2023-07-28 | General construction | 110 GROVE STREET | REMOVE EXIST KITCHEN CABINETS, APPLIANCES, BATHROOM FIXTURES, KITCHEN, BATHROOM FINISHES. PROVIDE NEW KITCHEN CABINETS, APPLIANCES, BATHROOM FIXTURES AND BATHROOM FINISHES. REPLACE | $83,980 |
| B00612739-I1-MS | 2023-07-07 | Mechanical / HVAC | 115 LINDEN STREET | NEW ELECTRIC UNIT HEATING AND COOLING UNITS; NEW HOT WATER HEAT EXCHANGE UNIT, NEW ENERGY RECOVERY VENTILATION WITH ALL PIPING AND ACCESSORIES | $114,750 |
| B00481187-I1-GC | 2023-06-28 | General construction | 115 LINDEN STREET | INTERIOR REHABILITATION OF EXISTING (4) STORY & CELLAR MASONRY BUILDING. NEW PARTITION LAYOUT FOR 17 APARTMENTS. EXTERIOR FACADE RENOVATION INCLUDING BRICK REPAIR AND WINDOW REPLAC | $5,001,050 |
| B00612884-I1-MS | 2023-06-09 | Mechanical / HVAC | 160 BLEECKER STREET | NEW ELECTRIC UNIT HEATING AND COOLING UNITS; NEW HOT WATER HEAT EXCHANGE UNIT, NEW ENERGY RECOVERY VENTILATION WITH ALL PIPING AND ACCESSORIES | $122,400 |
| B00478345-I1-GC | 2023-06-02 | General construction | 135 MENAHAN STREET | THE RENOVATION OF THE 3 STORY+CELLAR WOOD STRUCTURE MULTI-UNIT BUILDING INCLUDES A NEW INTERIOR NON-STRUCTURAL PARTITION LAYOUT, NEW INTERIOR FINISHES, NEW INTERIOR STAIR, AND THE | $693,000 |
| B00612764-I1-MS | 2023-05-22 | Mechanical / HVAC | 135 MENAHAN STREET | NEW HVAC UNITS; NEW HOT WATER HEAT EXCHANGE UNIT, NEW ENERGY RECOVERY VENTILATION WITH ALL PIPING AND ACCESSORIES FILED IN CONJUNCTION WITH ALT-CO # B00478345. | $145,000 |
| X00839766-I1-MS | 2023-05-16 | Mechanical / HVAC | 315 EAST 148 STREET | Installation of HVAC equipment in the public basement space. No change to use, egress or occupancy | $6,000 |
| X00848508-I1-GC | 2023-05-16 | General construction | 315 EAST 148 STREET | PROPOSED PARAPET WALL INTERIOR AND EXTERIOR RESURFACING WITH STUCCO, WORK TO INCLUDE STUCCO RESURFACING OF STAIR AND ELEVATOR EXTERIOR BULKHEADS, ADDITIONALLY 275 LINEAR FEET OF A | $19,500 |
| B00801343-I1-GC | 2023-05-12 | General construction | 301 HARMAN STREET | RENOVATION OF 3 STORY BUILDING LIMITED TO NEW FACADE FINISHES, NEW EXTERIOR AND INTERIOR LIGHTING, REPLACEMENT OF WINDOWS AND CELLAR DOORS, ROOF REPLACEMENT, NEW KITCHEN LAYOUTS AN | $435,000 |
| B00481242-I1-GC | 2023-05-11 | General construction | 160 BLEECKER STREET | INTERIOR REHABILITATION OF EXISTING (3) STORY & CELLAR BRICK BUILDING. NEW PARTITION LAYOUT FOR 6 APARTMENTS, NEW STAIR AND EXTERIOR FACADE RENOVATION INCLUDING WINDOW REPLACEMENT. | $623,200 |
| B08032740-I1-MS | 2023-05-09 | Mechanical / HVAC | 301 HARMAN STREET | NEW HVAC UNITS; NEW HOT WATER HEAT EXCHANGE UNIT, NEW ENERGY RECOVERY VENTILATION WITH ALL PIPING AND ACCESSORIES FILED IN CONJUNCTION ALT-GC # B0080134. | $122,389 |
| B00629440-I1-MS | 2023-05-09 | Mechanical / HVAC | 230 MOFFAT STREET | NEW HVAC UNITS; NEW HOT WATER HEAT EXCHANGE UNIT, NEW ENERGY RECOVERY VENTILATION WITH ALL PIPING AND ACCESSORIES FILED IN CONJUNCTION WITH ALT-GC # B00801386. | $122,388 |
| B00574662-I1-MS | 2023-05-04 | Mechanical / HVAC | 111 LINDEN STREET | PROVIDE NEW HVAC UNITS FOR HEATING AND COOLING, AND PROVIDE ELECTRIC RECOVERY HEAT EXCHANGE UNIT FOR DOMESTIC HOT WATER FILED IN CONJUNCTION WITH ALT-CO # B00478442. | $297,500 |
| B00655557-I1-GC-CX | 2023-05-02 | General construction | 230 MOFFAT STREET | Filing for existing rear fire escape replacement at existing rear wall of 2nd & 1st floor. No change in use, egress and occupancy. | $30,000 |
| B00478442-I1-GC | 2023-04-18 | General construction | 111 LINDEN STREET | INTERIOR REHABILITATION OF EXISTING (4) STORY & CELLAR MASONRY BUILDING. NEW PARTITION LAYOUT FOR 16 APARTMENTS, EXTERIOR FACADE RENOVATION INCLUDING BRICK REPAIR AND WINDOW REPLAC | $4,350,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
