COMPANY RECORD · NEW YORK, NY
Artur Kalaj — permit history in New York, NY
Artur Kalaj appears on 31 New York permit records from 2021 through 2026, most often general construction (87.1% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 27 | 87.1% |
| Mechanical / HVAC | 4 | 12.9% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 5 |
| 2022 | 3 |
| 2023 | 4 |
| 2024 | 5 |
| 2025 | 6 |
| 2026 | 8 |
Busiest year on record: 2026, with 8 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Aqueduct Mechanical Corp | 8 | 2026-03-13 |
| Pegasus P&H Corp | 8 | 2026-05-04 |
| Mej Plumbing LLC | 4 | 2025-10-29 |
| Orbit Plbg & Htg Inc | 1 | 2025-05-29 |
4 companies are named alongside Artur Kalaj on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 340 EAST 9 STREET | 2026-07-23 |
| 491 3 STREET | 2026-06-22 |
| 158 SUMMIT STREET | 2026-05-05 |
| 1199 PARK AVENUE | 2026-04-27 |
| 154 RUSSELL STREET | 2026-04-21 |
| 385 FLATBUSH AVENUE EXTENSION | 2025-10-23 |
| 226 WEST 11 STREET | 2025-10-15 |
| 119 WINDSOR PLACE | 2025-08-04 |
| 53 DOWNING STREET | 2025-07-02 |
| 60 EAST 96 STREET | 2025-03-07 |
| 367 SACKETT STREET | 2024-10-09 |
| 81 BEDFORD STREET | 2024-09-20 |
| 141 BERKELEY PLACE | 2024-07-11 |
| 60 FRONT STREET | 2023-11-08 |
22 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $643,850, median $61,600. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
31 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01404125-I1-GC | 2026-07-23 | General construction | 340 EAST 9 STREET | Legalization filing for violation 39186054R of CMU and brick masonry infill wall. No change to use, egress or occupancy. | $0 |
| B01369934-I1-GC | 2026-06-22 | General construction | 491 3 STREET | Renovation of existing building and conversion to a 2 Family Dwelling. | $396,000 |
| B01318232-I1-GC | 2026-05-05 | General construction | 158 SUMMIT STREET | Renovate existing two story building and receive a new certificate of occupancy. | $285,000 |
| B01318232-S2-MS | 2026-05-05 | Mechanical / HVAC | 158 SUMMIT STREET | Mechanical work in conjunction with building renovation. | $40,000 |
| M01333091-I1-GC | 2026-04-27 | General construction | 1199 PARK AVENUE | RENOVATION OF APT 15A. INTERIOR PARTITION REMOVAL AND CONSTRUCTION RELATED TO RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.V | $123,225 |
| B01339856-I1-GC | 2026-04-21 | General construction | 154 RUSSELL STREET | Combine apartments 2R and 2L to create Apt 3, combine apartments 3R and 3L to create apartment 4 under TPPN 3/97. Building to have total of 4 apartments. No change to use, egress | $43,000 |
| B01285995-I1-GC | 2026-02-04 | General construction | 491 3 STREET | Prop. to correct violation, new flooring at basmt, install 5/8 Plwood and floor tiles. Prop. to cap and remove gas stove andRes sink on the second floor . Prop HVAC at roof ontop o | $254,856 |
| B01285995-S2-MS | 2026-02-04 | Mechanical / HVAC | 491 3 STREET | PROPOSED NEW HVAC SYSTEM AT ROOF AND NEW MECHANICAL VENTILATIONS IN BATHROOMS AND KITCHENS, NO CHANGE OF USE, EGRESS OR OCCUPANCY. | $91,000 |
| B01250523-I1-GC | 2025-10-23 | General construction | 385 FLATBUSH AVENUE EXTENSION | INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. NO CHNAGE TO USE, EGRESS NOR OCCUPANCY. | $60,000 |
| M01173926-S2-MS | 2025-10-15 | Mechanical / HVAC | 226 WEST 11 STREET | MECHANICAL WORK IN CONJUNCTION WITH APARTMENT RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $50,000 |
| B01191494-I1-GC | 2025-08-04 | General construction | 119 WINDSOR PLACE | KITCHEN AND MINOR PARTITION WORK AT 1ST FL. NO CHANGE TO USE EGRESS OR OCCUPANCY. | $85,000 |
| M01247179-I1-GC | 2025-07-02 | General construction | 53 DOWNING STREET | PARTITION WORK IN CONJUNCTION WITH ELEVATOR REPLACEMENT SCOPE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $40,000 |
| M01173926-I1-GC | 2025-03-10 | General construction | 226 WEST 11 STREET | Renovation of Apt 1. No change to use, egress or occupancy. | $100,000 |
| M01155155-I1-GC | 2025-03-07 | General construction | 60 EAST 96 STREET | INTERIOR RENOVATION TO APT. 5B ON THE FIFTH FLOOR. WORK TO INCLUDE GENERAL CONSTRUCTION AS PER PLANS. PL & MS WORK FILED AS SUBSEQUENT FILINGS. NO CHANGE IN USE, EGRESS, OR OCCUPAN | $250,000 |
| B01076690-I1-GC | 2024-10-09 | General construction | 367 SACKETT STREET | COMBINE APARTMENTS TWO AND THREE INTO ONE DUPLEX APARTMRENT. COMBINING APARTMENTS CONVERTS BUILDING FROM 3-FAMILY TO 2-FAMILY DWELLING. | $40,335 |
| M01060156-I1-GC | 2024-09-20 | General construction | 81 BEDFORD STREET | INTERIOR RENOVATION OF APARTMENT 3F AND COMBINATION OFAPARTMENTS 2F AND 3F LOCATED ON THE SECOND AND THIRD FLOOR.ALTERING INTERIOR PARTITIONS WITHIN THE EXISTING RESIDENTIAL UNIT.I | $60,000 |
| B01080378-I1-GC | 2024-08-05 | General construction | 367 SACKETT STREET | INTERIOR, NON-STRUCTURAL DEMOLITION OF 2ND & 3RD FLOORS FILED IN CONJUNCTION WITH ALTCO. NO CHANGE TO ZONING, USE, OR EGRESS. | $7,068 |
| B01009964-I1-GC | 2024-07-11 | General construction | 141 BERKELEY PLACE | CONVERT EXISTING BUILDING FROM 3 TO 2 FAMILY. INTERIOR RENOVATION. DEMO AND CONSTRUCT INTERIOR PARTITIONS, FINISHES, AND CABINETRY. CONSTRUCT NEW REAR DECK. NO CHANGE TO BULK. | $643,850 |
| B01009964-S1-MS | 2024-07-03 | Mechanical / HVAC | 141 BERKELEY PLACE | MECHANICAL WORK IN CONJUNCTION WITH BUILDING RENOVATION FOR 2 FAMILY RESIDENCE. INSTALL SPLIT A/C SYSTEM, INSTALL KITCHEN, TOILET AND LAUNDRY EXHAUST, ASSOCIATED DUCTS AND DIFFUSER | $43,500 |
| B00926612-I1-GC | 2023-11-08 | General construction | 60 FRONT STREET | COMBINATION AND RENOVATION OF APARTMENTS 24A AND 24D. INTERIOR PARTITION REMOVAL, PLUMBING WORK AND CONSTRUCTION RELATED TO RENOVATION. APARTMENT COMBINATION TO COMPLY WITH TPPN3 | $45,000 |
| M00863624-I1-GC | 2023-05-12 | General construction | 419 WEST 13 STREET | Install millwork and display cabinets, polish and seal conrete floor, clean brick walls, install millwork and display cases for retail store at first floor. No change to use egres | $140,002 |
| M08020527-I1-GC | 2023-02-15 | General construction | 60 EAST 96 STREET | NEW OPENING IN EXTERIOR MASONRY WALL FOR NEW AC SLEEVE AND INSTALLATION OF AC UNIT AND REPLACEMENT OF RADIATORS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $68,000 |
| M00800473-I1-GC | 2023-02-04 | General construction | 353 EAST 72 STREET | General construction & plumbing work for legalization of apartment combination & proposed interior partition modification & laundry installation as per plans filed herewith. No cha | $0 |
| M08009655-I1-GC | 2022-10-27 | General construction | 426 WEST 58 STREET | RENOVATION OF APT 4C. INTERIOR PARTITION REMOVAL AND CONSTRUCTION RELATED TO RENOVATION. NO CHANGE TO USE, EGRESS OROCCUPANCY. | $212,175 |
| M00779995-I1-GC | 2022-08-12 | General construction | 528 WEST 111 STREET | BATHROOM AND KITCHEN RENOVATION AT APT 65. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $61,600 |
| M00712031-I1-GC | 2022-04-26 | General construction | 182 WEST 58 STREET | Removal of minor interior non-bearing partitions, removal of floor, wall, and ceiling finishes. No change to use egress of occupancy. | $49,000 |
| M00587045-I1-GC | 2021-11-18 | General construction | 60 EAST 96 STREET | General construction related to the combination of apartments 9A and 9B on the 9th floor in compliance with TPPN #3/97. | $112,500 |
| B00515087-I1-GC | 2021-05-10 | General construction | 420 12 STREET | RENOVATION OF THE UPPER LEVEL OF DUPLEX APARTMENT #E1L, LOCATED ON THE 2ND FLOOR. PARTITION WORK, CABINETRY, AND FINISHES. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $29,500 |
| M00491010-I1-GC-CX | 2021-04-23 | General construction | 3117 BROADWAY | Interior renovation and structural work in apartment 23 | $53,950 |
| M00477082-I1-GC | 2021-04-08 | General construction | 60 EAST 96 STREET | Interior renovation including minor relocation of non-loadbearing partitions, new finishes and fixtures per plans. No change to use occupancy or egress | $178,800 |
| B00455970-I1-GC | 2021-03-15 | General construction | 286 LAFAYETTE AVENUE | INTERIOR BATHROOM RENOVATION AT 2ND AND 3RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY | $65,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
