COMPANY RECORD · NEW YORK, NY
Arista Plbg & Htg Corp — permit history in New York, NY
Arista Plbg & Htg Corp appears on 136 New York permit records from 2019 through 2026, most often plumbing (63.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 105 | 63.6% |
| Fire protection | 60 | 36.4% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 4 |
| 2020 | 32 |
| 2021 | 37 |
| 2022 | 26 |
| 2023 | 25 |
| 2024 | 17 |
| 2025 | 16 |
| 2026 | 8 |
Busiest year on record: 2021, with 37 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Aspen Truss Inc | 7 | 2026-03-17 |
| Rimani Group Inc | 6 | 2025-05-23 |
| New Wave Design & Contrac | 5 | 2025-09-12 |
| Fk Construction Inc | 4 | 2026-07-02 |
| Frank Marando Landscape | 4 | 2026-06-23 |
| Senter Management LLC | 3 | 2022-07-12 |
| Crescent Street Construct | 2 | 2025-01-24 |
| Mcr Construction Mgmt LLC | 2 | 2024-08-06 |
| Optimus Construction&Dev | 2 | 2025-12-19 |
| Page Construction Corp | 2 | 2025-12-17 |
| Garden State Of Nj Data | 1 | 2024-05-30 |
| Marchese Builders Inc | 1 | 2024-11-27 |
15 companies are named alongside Arista Plbg & Htg Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 149-57 17 ROAD | 2026-07-02 |
| 18-20 128 STREET | 2026-06-23 |
| 18-18 128 STREET | 2026-06-18 |
| 147-30 5 AVENUE | 2026-04-03 |
| 25 EAST 17 STREET | 2026-03-17 |
| 57 WEST 57 STREET | 2025-12-19 |
| 32-41 STEINWAY STREET | 2025-12-17 |
| 266 WEST 91 STREET | 2025-09-12 |
| 336 CANAL STREET | 2025-09-11 |
| 20-24 36 STREET | 2025-08-20 |
| 689 8 AVENUE | 2025-07-23 |
| 857 BROADWAY | 2025-06-11 |
| 50 COMMERCIAL STREET | 2025-05-23 |
| 223 EAST 117 STREET | 2025-01-24 |
101 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $797,000, median $22,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
136 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q00785452-S2-PL | 2026-07-02 | Plumbing | 149-57 17 ROAD | INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH THE NB #Q00785452-I1 AS PER THE DRAWINGS FILED HEREIN. | $0 |
| Q01037235-S4-PL | 2026-06-23 | Plumbing | 18-20 128 STREET | INSTALLATION OF PLUMBING FIXTURES AND PIPING THROUGHOUT FOR NEW 2-STORY WAREHOUSE BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # Q01037235 | $0 |
| Q01037235-S3-EW-SP | 2026-06-23 | Fire protection | 18-20 128 STREET | HEREWITH FILING FOR PIPE SCHEDULE SPRINKLER SYSTEM THROUGH-OUT NEW 2-STORY WAREHOUSE BUILDING. ENTIRE BUILDING IS LESS THAN 5,000 SQ FT. FILED IN CONJUNCTION WITH NEW BUILDING # | $0 |
| Q01025589-S5-EW-SP | 2026-06-18 | Fire protection | 18-18 128 STREET | HEREWITH FILING FOR PIPE SCHEDULE SPRINKLER SYSTEM THROUGH-OUT NEW 2-STORY WAREHOUSE BUILDING. ENTIRE BUILDING IS LESS THAN 5,000 SQ FT. FILED IN CONJUNCTION WITH NEW BUILDING #Q | $0 |
| Q01025589-S4-PL | 2026-06-17 | Plumbing | 18-18 128 STREET | INSTALLATION OF PLUMBING FIXTURES AND PIPING THROUGHOUT FOR NEW 2-STORY WAREHOUSE BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS #Q01025589. | $0 |
| Q01341215-S1-PL | 2026-04-03 | Plumbing | 147-30 5 AVENUE | INSTALL NEW FIXTURES THROUGHOUT ON NEW ROUGHING AS PER PLANS. FILED IN CONJUNCTION WITH GC #Q01341215 | $56,000 |
| M01292294-S1-PL | 2026-03-17 | Plumbing | 25 EAST 17 STREET | INSTALLATION OF NEW PLUMBING FIXTURES ON SECOND FLOOR AS PER PLAN | $10,000 |
| M01225639-I1-EW-SP | 2026-03-16 | Fire protection | 25 EAST 17 STREET | SPRINKLER MODIFICATION ON 2ND, 3RD AND 4TH FLOORS AS PER PLANS. | $85,000 |
| M01313023-S3-EW-SP | 2025-12-19 | Fire protection | 57 WEST 57 STREET | SUBSEQUENT APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS ON THE 8TH FL (SUITE 809) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $13,500 |
| Q01176541-S1-EW-SP | 2025-12-17 | Plumbing | 32-41 STEINWAY STREET | PLUMBING FILED IN CONJUNCTION WITH OT APPLICATION Q01176541-I1 | $138,006 |
| Q01176541-S1-EW-SP | 2025-12-17 | Fire protection | 32-41 STEINWAY STREET | PLUMBING FILED IN CONJUNCTION WITH OT APPLICATION Q01176541-I1 | $138,006 |
| M01274788-S2-EW-SP | 2025-10-29 | Fire protection | 57 WEST 57 STREET | SUBSEQUENT APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS ON THE 17TH FLOOR (SUITE 1702) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $9,000 |
| M01211829-S2-PL | 2025-09-12 | Plumbing | 266 WEST 91 STREET | CAP & REMOVE 1 BOILER, 1 HWHREPLACE 1 STOVE, 1 SINK, 2 LAVSRELOCATE 1 YD, 1 S SINK, 1 DRYER, 1 WASHER, 1 SINK, 1 DW, 3 TOILETS, 2 LAVS, 2 TUBS, 1 SHOWERINSTALL NEW 1 OUTDOOR GRIL | $76,000 |
| M01117363-S1-PL | 2025-09-11 | Plumbing | 336 CANAL STREET | INSTALLATION OF NEW PLUMBING FIXTURES ON SECOND FLOOR AS PER PLAN | $14,000 |
| Q01064786-S1-PL | 2025-08-20 | Plumbing | 20-24 36 STREET | plumbing work as per plans. | $40,000 |
| M01249039-S2-PL | 2025-07-23 | Plumbing | 689 8 AVENUE | plumbing fixtures in 3rd and 4th floor as per plan | $10,000 |
| M00803838-S1-PL | 2025-06-11 | Plumbing | 857 BROADWAY | Removal of all existing plumbing fixtures and cap all existing lines. Installation of new plumbing fixtures as shown in the plans filed herewith. | $8,000 |
| B00596151-S9-EW-SP | 2025-05-23 | Plumbing | 50 COMMERCIAL STREET | PL/SP/SD work in conjunction with NB B00596151 | $0 |
| B00596151-S9-EW-SP | 2025-05-23 | Fire protection | 50 COMMERCIAL STREET | PL/SP/SD work in conjunction with NB B00596151 | $0 |
| B00596151-S9-EW-SD | 2025-05-23 | Fire protection | 50 COMMERCIAL STREET | PL/SP/SD work in conjunction with NB B00596151 | $0 |
| B00596151-S9-EW-SD | 2025-05-23 | Plumbing | 50 COMMERCIAL STREET | PL/SP/SD work in conjunction with NB B00596151 | $0 |
| M01051604-S2-EW-SP | 2025-01-24 | Fire protection | 223 EAST 117 STREET | MODIFICATIONS TO EXISTING PLUMBING AND SPRINKLER SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS | $797,000 |
| M01051604-S2-EW-SP | 2025-01-24 | Plumbing | 223 EAST 117 STREET | MODIFICATIONS TO EXISTING PLUMBING AND SPRINKLER SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS | $797,000 |
| B01098534-S3-PL | 2025-01-06 | Plumbing | 88 REMSEN STREET | FILING HEREWITH PLUMBING WORK IN CONJUNCTION WITH APARTMENT RENOVATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $28,000 |
| M00892071-S1-PL | 2024-12-17 | Plumbing | 503 WEST 57 STREET | NEW WATER SERVICE AND ADDITION OF RELATED PLUMBING FIXTURES ON 1ST, 2ND AND 3RD FLOOR AS PER PLANS | $25,000 |
| M01133458-S3-EW-SP | 2024-11-27 | Fire protection | 885 2 AVENUE | MODIFICATION OF EXISTING SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $23,000 |
| M00335708-S1-PL | 2024-09-04 | Plumbing | 501 WEST 57 STREET | REMOVE EXISTING, GAS BOILER #40299, GAS HOT WATER HEATER, AND ASSOCIATED GAS PIPING AS PER PLANS. | $5,000 |
| Q00817939-S1-PL | 2024-08-19 | Plumbing | 14-06 CLINTONVILLE STREET | Minor plumbing work no change to use egress or occupancy | $5,000 |
| B01022057-S1-PL | 2024-08-06 | Plumbing | 149 FRANKLIN STREET | INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH ALTCO #B01022057-I1 | $9,000 |
| Q00572968-I1-EW-SP | 2024-06-17 | Fire protection | 31-09 NEWTOWN AVENUE | Removal of existing wet sprinkler system. Installation of new wet sprinkler system in conjunction with Q00492713. No change in use, egress, or occupancy. | $388,953 |
| M00973132-I1-PL | 2024-06-13 | Plumbing | 17 WEST 8 STREET | REMOVE EXISTING GAS SERVICE, GAS BOILER #12073, GAS HOT WATER HEATER, AND RELEVANT GAS PIPING AS PER PLANS. | $10,000 |
| B00596151-S9-PL | 2024-06-12 | Fire protection | 50 COMMERCIAL STREET | PL/SP/SD work in conjunction with NB B00596151 | $0 |
| B00596151-S9-PL | 2024-06-12 | Plumbing | 50 COMMERCIAL STREET | PL/SP/SD work in conjunction with NB B00596151 | $0 |
| M00608522-S1-PL | 2024-05-30 | Plumbing | 234 EAST 74 STREET | PL IN CONJUNCTION W APPLICATION #M00608522-I1 | $23,000 |
| M01019820-I1-PL | 2024-05-30 | Plumbing | 710 PARK AVENUE | COHN & EHRLICH RESIDENCE APT#17B. PLUMBING WORK RELATED TO INTERIOR APARTMENT RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $60,000 |
| Q00967167-S2-PL | 2024-04-12 | Plumbing | 39-30 46 STREET | Plumbing work filed in conjunction with the renovation of two family dwelling. | $16,000 |
| M00859115-S2-PL | 2024-04-11 | Plumbing | 11 WEST 17 STREET | INSTALLATION OF PLUMBING FIXTURES AS PER PLAN | $32,500 |
| M00859115-S3-EW-SP | 2024-04-11 | Fire protection | 11 WEST 17 STREET | INSTALLATION OF NEW SPRINKLER SYSTEM ON 5TH FLOOR AS PER PLAN. | $20,000 |
| Q00302250-I1-PL | 2024-02-16 | Plumbing | 10-23 47 ROAD | INSTALLATION OF PLUMBING FIXTURES. ALL AS PER PLANS AND APPLICATIONS | $40,000 |
| B00969530-I1-PL | 2024-02-07 | Plumbing | 53 TOMPKINS PLACE | Plumbing work proposed for an existing single-family home. No change to use, occupancy or egress. | $69,000 |
| Q00302541-I1-EW-SP | 2024-01-16 | Fire protection | 10-23 47 ROAD | installation of sprinklers through out building,all as per plans and applications, no change in use,egress or occupancy | $21,600 |
| M00977871-I1-PL | 2023-12-28 | Plumbing | 88 READE STREET | REPAIR GAS PIPING AS PER PLANS. | $10,000 |
| Q00893697-I1-PL | 2023-12-21 | Plumbing | 20-15 46 STREET | HEREWITH FILED PLUMBING AND SPRINKLERS WORK APPLICATION AND PLANS IN CONJUNCTION WITH Q08003994. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $57,000 |
| M00657589-S3-EW-SP | 2023-12-14 | Fire protection | 51 WEST 70 STREET | INSTALLATION OF NEW SPRINKLER AND ASSOCIATED PIPING IN CONJUNCTION WITH GC APPLICATION. | $60,000 |
| M00841065-I1-EW-SP | 2023-10-25 | Fire protection | 503 WEST 57 STREET | INSTALLATION OF SPRINKLER SYSTEM AS PER PLAN | $78,000 |
| M00896733-S1-PL | 2023-10-05 | Plumbing | 541 8 AVENUE | INSTALLATION/REPLACEMENT/RELOCATION OF PLUMBING FIXTURES IN CONJUCTION WITH GC APPLICATION #M00896733-I1 | $7,500 |
| B00919889-I1-PL | 2023-10-02 | Plumbing | 475 WASHINGTON AVENUE | APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 6TH FLOOR (APT 6D) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $23,000 |
| M00657589-S1-PL | 2023-09-21 | Plumbing | 51 WEST 70 STREET | PLUMBING WORK TYPE FILED IN CONJUCTION WITH GC APPLICATION. WORK TO INCLUDE INSTALLATION OF NEW PLUMBING FIXTURES AND ASSOCIATED PIPING. | $85,000 |
| M00275101-I1-EW-SP | 2023-07-19 | Fire protection | 13 EAST 17 STREET | MODIFICATION OF EXISTING SPRINKLER SYSTEM IN 7TH FLOOR AS PER PLANS | $28,000 |
| M00869444-I1-EW-SP | 2023-06-13 | Fire protection | 6 WEST 95 STREET | INSTALLATION OF SPRINKLER HEADS AND ASSOCIATED PIPING AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE. | $60,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
