COMPANY RECORD · NEW YORK, NY
Anva LLC — permit history in New York, NY
Anva LLC appears on 28 New York permit records from 2021 through 2026, most often general construction (64.3% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 18 | 64.3% |
| Mechanical / HVAC | 10 | 35.7% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 1 |
| 2022 | 10 |
| 2023 | 8 |
| 2025 | 8 |
| 2026 | 1 |
Busiest year on record: 2022, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Blaze Plumbing & Heating | 2 | 2023-04-17 |
1 companies are named alongside Anva LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 43 BARROW STREET | 2026-03-03 |
| 73 WASHINGTON PLACE | 2025-08-07 |
| 53-79 63 STREET | 2025-07-02 |
| 71 WASHINGTON PLACE | 2025-05-19 |
| 83-15 98 STREET | 2025-03-31 |
| 923 FIFTH AVENUE | 2025-02-20 |
| 115 CENTRAL PARK WEST | 2023-12-07 |
| 353 WEST 20 STREET | 2023-11-24 |
| 176 WAVERLY PLACE | 2023-06-23 |
| 200 WEST END AVENUE | 2023-06-16 |
| 401 EAST 84 STREET | 2022-11-17 |
| 178 WAVERLY PLACE | 2022-10-31 |
| 417 WEST 21 STREET | 2022-09-22 |
| 57 DRIGGS AVENUE | 2022-08-01 |
15 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $3,000 to $3,000,051, median $121,897. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
28 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M08054251-I1-GC | 2026-03-03 | General construction | 43 BARROW STREET | New penthouse and building renovation, repointing Masonry wall as needed | $1,000,000 |
| M00407175-I1-MS | 2025-08-07 | Mechanical / HVAC | 73 WASHINGTON PLACE | INSTALL ENERGY RECOVERY UNITS, EXHAUST FANS, SPLIT VRF HEAT PUMP SYSTEM AND DUCTWORK THROUGHOUT THE ENTIRE SINGLE-FAMILY HOME. | $249,956 |
| Q01201972-I1-GC | 2025-07-02 | General construction | 53-79 63 STREET | FILING HEREWITH APPLICATION FOR INSTALLATION OF NEW SUNROOM @ REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $7,000 |
| M01218912-I1-GC-CX | 2025-05-19 | General construction | 71 WASHINGTON PLACE | PROPOSED REAR BUILDING MODIFICATIONS AS PER PLANS. INCLUDES INSTALLATION OF NEW STEEL FRAMING FOR NEW EXPANDED WINDOW OPENINGS AND INSTALLATION OF NEW WINDOWS AT 4TH AND 5TH FLOORS | $193,190 |
| Q01185434-I1-GC | 2025-03-31 | General construction | 83-15 98 STREET | REMOVAL OF EXISTING FINISHES IN THE BATH AND KITCHEN. MINOR PARTITION MODIFICATION. MODIFICATION TO LIGHTING FIXTURES.. REPLACING INTERIOR DOORS, WINDOW SILLS, AND RADIATOR COVERS | $25,792 |
| M08053160-I1-MS | 2025-02-20 | Mechanical / HVAC | 923 FIFTH AVENUE | Demolition and replace all PTAC units and radiators for existing Apt#7/8D. No change of use, egress or occupancy under this application. | $30,000 |
| M08049344-I1-GC | 2025-02-20 | General construction | 923 FIFTH AVENUE | Demolition & Construction of partitions, walls and floor finishes work throughout for existing Apts#7/8D. No change of use, egress or occupancy under this application | $143,800 |
| M00904227-I1-MS | 2025-02-19 | Mechanical / HVAC | 43 BARROW STREET | Mechanical work in conjunction with renovation. | $150,000 |
| M00903790-I1-GC-CX | 2025-02-19 | General construction | 43 BARROW STREET | NEW FOUNDATIONS, NEW STEEL FRAME AROUND STAIR OPENING, NEW FLOORS, NEW MOMENT FRAME DUE TO REAR WALL OPENING, NRE PENTHOUSE ADDITION, REPOINTING OF EXISTING MASONRY WALLS AS NEEDED | $500,000 |
| M00877609-I1-MS | 2023-12-07 | Mechanical / HVAC | 115 CENTRAL PARK WEST | mechanical work during renovation in apartment 9B on 9th floor | $99,981 |
| M00877587-I1-GC | 2023-12-05 | General construction | 115 CENTRAL PARK WEST | Renovation on 9th floor for apartment 9B | $999,983 |
| M00823789-I1-GC | 2023-11-24 | General construction | 353 WEST 20 STREET | CONVERT MULTI-FAMILY TOWNHOUSE TO SINGLE-FAMILY TOWNHOUSE | $3,000,051 |
| M00862556-I1-MS | 2023-08-29 | Mechanical / HVAC | 353 WEST 20 STREET | mechanical work during renovation of townhouse | $249,983 |
| M00822203-I1-MS | 2023-06-23 | Mechanical / HVAC | 176 WAVERLY PLACE | mechanical work associated with combining two existing buildings (176/178 Waverly Place) into one building | $249,944 |
| M00846781-I1-GC | 2023-06-16 | General construction | 200 WEST END AVENUE | construction | $499,994 |
| M00846806-I1-MS | 2023-05-17 | Mechanical / HVAC | 200 WEST END AVENUE | mechanical work during renovation of apartment 15F | $99,976 |
| M08036503-I1-GC | 2023-04-17 | General construction | 176 WAVERLY PLACE | Combine two buildings to one. Change use from multiple dwelling to single family residence | $1,999,160 |
| M08032612-I1-GC | 2022-12-20 | General construction | 353 WEST 20 STREET | interior demolition | $24,984 |
| M00728023-I1-MS | 2022-11-17 | Mechanical / HVAC | 401 EAST 84 STREET | mechanical work for apartment renovation | $99,994 |
| M00726609-I1-GC | 2022-11-02 | General construction | 401 EAST 84 STREET | apartment renovation | $1,149,982 |
| M08023655-I1-GC | 2022-10-31 | General construction | 178 WAVERLY PLACE | Interior Demolition | $24,972 |
| M08021400-I1-GC | 2022-10-31 | General construction | 176 WAVERLY PLACE | Interior Demolition | $24,972 |
| M00656510-I1-MS | 2022-09-22 | Mechanical / HVAC | 417 WEST 21 STREET | mechanical work to demolish existing condenser unit in backyard. Relocate 4th Floor condenser unit to Rooftop. Add new unit on Rooftop to replace demolished unit | $90,000 |
| B00763262-I1-MS | 2022-08-01 | Mechanical / HVAC | 57 DRIGGS AVENUE | Installation of new 4 ton heat pump system on 1st floor and associated condenser on the roof as per plans attached herewith. No change to use, egress and occupancy. | $30,000 |
| M00742421-I1-GC | 2022-06-16 | General construction | 43 BARROW STREET | Temporary Structure for LPC mock up | $3,000 |
| M00655963-I1-GC | 2022-02-16 | General construction | 417 WEST 21 STREET | Interior renovations as shown on drawings filed herewith. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997. | $297,996 |
| Q00525182-I1-GC | 2022-01-26 | General construction | 53-79 63 STREET | FILED JOB TO BUILD A NEW SUNROOM ON THE FIRST FLOOR | $7,000 |
| M00588767-I1-GC | 2021-12-13 | General construction | 167 WEST 89 STREET | cellar cut and point brick wall apply thoroseal to walls. roof install new flashing pitch pockets insulation along parapet and rain hood over flues | $75,012 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
