COMPANY RECORD · NEW YORK, NY
Anaktora Mechanical LLC — permit history in New York, NY
Anaktora Mechanical LLC appears on 28 New York permit records from 2023 through 2026, most often plumbing (93.3% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 28 | 93.3% |
| Fire protection | 2 | 6.7% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2023 | 3 |
| 2024 | 22 |
| 2025 | 1 |
| 2026 | 4 |
Busiest year on record: 2024, with 22 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Ecd Ny Inc | 2 | 2026-04-02 |
| Mega Contracting Gp LLC | 2 | 2026-08-04 |
| Skycore Builders, Inc | 2 | 2026-04-02 |
| T.L.C. Industries Inc | 1 | 2023-12-01 |
4 companies are named alongside Anaktora Mechanical LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 50-25 BARNETT AVE | 2026-08-04 |
| 163-25 ARCHER AVENUE | 2026-04-02 |
| 1320 INWOOD AVENUE | 2026-01-29 |
| 671 BROOK AVENUE | 2025-07-17 |
| 50-25 BARNETT AVENUE | 2024-07-11 |
| 3 EAST 54 STREET | 2024-06-21 |
| 1441 SOUTH AVENUE | 2023-12-01 |
| 71 SPRING STREET | 2023-10-13 |
8 distinct addresses on record. Declared value on record runs from $0 to $199,200, median $1,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
28 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q01382331-S2-PL | 2026-08-04 | Plumbing | 50-25 BARNETT AVE | Alteration filed for plumbing work for a Daycare fit-out as per plans filed. Subsequent to Alt #Q01382331-I1. | $100,000 |
| Q01118133-S3-PL | 2026-04-02 | Plumbing | 163-25 ARCHER AVENUE | Proposing Plumbing , Standpipe and Sprinklers work for entire Mix Use New Building | $0 |
| Q01118133-S3-PL | 2026-04-02 | Fire protection | 163-25 ARCHER AVENUE | Proposing Plumbing , Standpipe and Sprinklers work for entire Mix Use New Building | $0 |
| X00908433-S5-PL | 2026-01-29 | Plumbing | 1320 INWOOD AVENUE | Plumbing filing as per plans filed | $0 |
| X00298231-I1-PL | 2025-07-17 | Plumbing | 671 BROOK AVENUE | Plumbing work as per plans filed. | $1,000 |
| Q00698149-I1-PL | 2024-07-11 | Plumbing | 50-25 BARNETT AVENUE | Plumbing work as per plans filed. Filed in conjunction with NB #421134132. | $1,000 |
| M08037615-I1-PL | 2024-06-21 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR: 16, MARKETING FLOOR: 17, AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPA | $1,000 |
| M08037625-I1-PL | 2024-06-21 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR: 15, MARKETING FLOOR: 16 AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPAN | $1,000 |
| M00802952-I1-PL | 2024-01-26 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR 8 AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M27040445-I1-PL | 2024-01-25 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR: 19, MARKETING FLOOR: 20, AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPA | $1,000 |
| M08037602-I1-PL | 2024-01-25 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR: 18, MARKETING FLOOR: 19, AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPA | $1,000 |
| M08037612-I1-PL | 2024-01-25 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR: 17, MARKETING FLOOR: 18, AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPA | $1,000 |
| M00803042-I1-PL | 2024-01-25 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR 7 AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M08053909-I1-PL | 2024-01-24 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR: 14 AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M00803305-I1-PL | 2024-01-24 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR 3 AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M08049433-I1-PL | 2024-01-24 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR: 11 AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M08046021-I1-PL | 2024-01-24 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR 002 AS PER PLANS FILED HEREWITH. GENERAL CONSTRUCTION DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M00803075-I1-PL | 2024-01-24 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR 6 AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M08045988-I1-PL | 2024-01-24 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR 10 AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M00802893-I1-PL | 2024-01-24 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR 9 AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M00803339-I1-PL | 2024-01-24 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR 1 AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M08049414-I1-PL | 2024-01-24 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR: 12 AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M08046031-I1-PL | 2024-01-24 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION AT CELLAR AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M00803289-I1-PL | 2024-01-24 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR 4 AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M08032673-I1-PL | 2024-01-24 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR 5 AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,000 |
| M08049396-I1-PL | 2024-01-24 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR: 13, MARKETING FLOOR: 14 AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPAN | $1,000 |
| M08037590-I1-PL | 2024-01-22 | Plumbing | 3 EAST 54 STREET | PLUMBING DEMOLITION ON CONSTRUCTION FLOOR: 19, MARKETING FLOOR: 20, AS PER PLANS FILED HEREWITH. ARCHITECTURAL DEMOLITION TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPA | $1,000 |
| S00947059-S7-PL | 2023-12-01 | Plumbing | 1441 SOUTH AVENUE | Application filed for the plumbing work associated with interior alteration to existing commercial space at 6th floor of an existing 8-story commercial building. All work as per pl | $17,500 |
| M00886770-I1-PL | 2023-10-13 | Plumbing | 71 SPRING STREET | Application for plumbing and sprinkler work in 3rd floor tenant space. No change to use, egress, or occupancy. | $199,200 |
| M00886770-I1-PL | 2023-10-13 | Fire protection | 71 SPRING STREET | Application for plumbing and sprinkler work in 3rd floor tenant space. No change to use, egress, or occupancy. | $199,200 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
