COMPANY RECORD · NEW YORK, NY
Al Saeed Construction — permit history in New York, NY
Al Saeed Construction appears on 67 New York permit records from 2020 through 2026, most often general construction (60.9% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 53 | 60.9% |
| Mechanical / HVAC | 34 | 39.1% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 4 |
| 2021 | 29 |
| 2022 | 23 |
| 2023 | 7 |
| 2024 | 13 |
| 2025 | 5 |
| 2026 | 6 |
Busiest year on record: 2021, with 29 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Empire Plumbing Inc | 4 | 2026-06-18 |
| Crossfield Plbg.&Htg | 2 | 2026-06-15 |
| Dirno Corporation | 1 | 2023-03-23 |
| Jmw Plumbing, Inc | 1 | 2024-10-29 |
| M. Int'l Engineering PLLC | 1 | 2022-10-27 |
| Star Plumbing & Htng LLC | 1 | 2022-07-18 |
6 companies are named alongside Al Saeed Construction on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 287 RENSSELAER AVENUE | 2026-06-26 |
| 5823 4 AVENUE | 2026-06-16 |
| 1190 BAY STREET | 2026-04-20 |
| 161-02 ROCKAWAY BOULEVARD | 2026-01-08 |
| 758 WEST 181 STREET | 2025-09-02 |
| 250 WEST 54 STREET | 2025-04-10 |
| 3-13 27 AVENUE | 2025-04-10 |
| 58 BOUNDARY AVENUE | 2024-11-01 |
| 1670 YORK AVENUE | 2024-06-07 |
| 88-34 PARSONS BOULEVARD | 2024-06-04 |
| 1919 SURF AVENUE | 2024-05-28 |
| 1-15 57 AVENUE | 2024-04-26 |
| 60 HENRY STREET | 2024-04-19 |
| 1921 SURF AVENUE | 2024-04-05 |
56 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $4,000 to $540,000, median $50,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
67 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| S01372335-I1-GC | 2026-06-26 | General construction | 287 RENSSELAER AVENUE | MINOR INTERIOR RENOVATION TO THE CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $16,350 |
| B01350821-S2-MS | 2026-06-16 | Mechanical / HVAC | 5823 4 AVENUE | Interior modification of existing exhaust hood, duct & make air. No change in use, egress nor occupancy. | $30,000 |
| B01350821-I1-GC | 2026-06-11 | General construction | 5823 4 AVENUE | RENOVATION OF EXISTING FIRST FLOOR COMMERCIAL SPACE AND CELLAR. WORK TO INCLUDE NON STRUCTURAL DEMOTION, NEW PARTITIONS, CEILINGS, FLOORS FINISHES, COUNTERS AND FINISHES THROUGHOUT | $132,600 |
| S01384620-I1-GC-CX | 2026-04-20 | Mechanical / HVAC | 1190 BAY STREET | FILING FOR INTERIOR RENOVATION OF THE EXISTING FOOD STORE USE GROUP 6, REPLACE COMMERCIAL HOOD FOR THE DELI, NON-BEARING PARTITIONS, CARPENTRY, MILL WORK AND FINISHES | $38,000 |
| S01384620-I1-GC-CX | 2026-04-20 | General construction | 1190 BAY STREET | FILING FOR INTERIOR RENOVATION OF THE EXISTING FOOD STORE USE GROUP 6, REPLACE COMMERCIAL HOOD FOR THE DELI, NON-BEARING PARTITIONS, CARPENTRY, MILL WORK AND FINISHES | $38,000 |
| Q00694428-I1-MS | 2026-01-08 | Mechanical / HVAC | 161-02 ROCKAWAY BOULEVARD | INSTALLATION OF 12 NEW REFRIGERATION EVAPORATORS AND 7 NEW AIR COOLED CONDENSIGN UNITS ON THE GROUND FLOOR PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY. | $540,000 |
| M01242405-I1-MS | 2025-09-02 | Mechanical / HVAC | 758 WEST 181 STREET | PROVIDE NEW MECHANICAL EXHAUST SYSTEM ON FIRST FLOORCOMMERCIAL STORE / EATING / DRINKING ESTABLISHMENT OFEXISTING 6 STORY BUILDING WITH CELLAR IN CONJUNCTION WITHALT 2 JOB#M0124240 | $28,000 |
| M01240063-I1-GC | 2025-07-17 | General construction | 758 WEST 181 STREET | Interior renovation in existing commercial store on the 1st floor and cellar. No change in use, means of egress or occupancy in this application. | $166,320 |
| M01202604-I1-GC-CX | 2025-04-10 | Mechanical / HVAC | 250 WEST 54 STREET | INTERIOR RENOVATION TO THE EXISTING 1ST FL COMMERCIAL SPACE; NEW COMMERCIAL COOKING HOOD; NEW EXHAUST & DUCTWORK; NEW CONDENSER TO BE INSTALLED AT REAR FACADE & HEAT PUMP ON THE RO | $240,000 |
| M01202604-I1-GC-CX | 2025-04-10 | General construction | 250 WEST 54 STREET | INTERIOR RENOVATION TO THE EXISTING 1ST FL COMMERCIAL SPACE; NEW COMMERCIAL COOKING HOOD; NEW EXHAUST & DUCTWORK; NEW CONDENSER TO BE INSTALLED AT REAR FACADE & HEAT PUMP ON THE RO | $240,000 |
| Q01133491-I1-MS | 2025-04-10 | Mechanical / HVAC | 3-13 27 AVENUE | MECHANICAL WORKS INCLUDE NEW MECHANICAL SYSTEM AND COMMERCIAL KITCHEN EXHAUST FOR SUPERMARKET WITH COOKING. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION. | $28,000 |
| Q00563758-I1-MS | 2024-12-30 | Mechanical / HVAC | 161-02 ROCKAWAY BOULEVARD | Installation of mechanical equipment, ducts etc as per plans. This application in conjunction with New Building application # 440606257. (Main Building) | $500,000 |
| S00994905-I1-GC | 2024-11-01 | General construction | 58 BOUNDARY AVENUE | Proposed renovations (decorative dormer) at attic level. Accessory use only ( storage space) new sliding glass door and deck at rear of building. (No change to Use., Occupancy, | $26,440 |
| Q01119215-I1-GC | 2024-10-07 | General construction | 3-13 27 AVENUE | INTERIOR RENOVATION AT EXISTING 1ST FLOOR RETAIL SPACE. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION | $97,560 |
| M00569624-I1-MS | 2024-06-07 | Mechanical / HVAC | 1670 YORK AVENUE | INTERIOR RENOVATION & PLUMBING WORK ON COMMERCIAL SPACE ON 1ST FLOOR. REPLACE EX.COMMERCIAL HOOD. PROPOSED SEATING AREAS.NEW AC COMPRESSOR ON THE ROOF. PLUMBING TO BE FILED UNDER A | $95,000 |
| M00569624-I1-MS | 2024-06-07 | General construction | 1670 YORK AVENUE | INTERIOR RENOVATION & PLUMBING WORK ON COMMERCIAL SPACE ON 1ST FLOOR. REPLACE EX.COMMERCIAL HOOD. PROPOSED SEATING AREAS.NEW AC COMPRESSOR ON THE ROOF. PLUMBING TO BE FILED UNDER A | $95,000 |
| Q01041472-I1-MS | 2024-06-04 | Mechanical / HVAC | 88-34 PARSONS BOULEVARD | Filing for installation of Commercial Kitchen Hood and related ducts for the existing Corner Store Deli Store. | $12,000 |
| B01054326-I1-GC-CX | 2024-05-28 | General construction | 1919 SURF AVENUE | PROPOSE INTERIOR RENOVATION AND MECHANICAL WORK FOR A NEW BEAUTY SUPPLY RETAIL STORE. NEW (2) DUCTLESS COMPRESSORS ON EXISTIING PLATFORM IN BUILDING PARKING GARAGE. PLUMBING FILED | $105,920 |
| B01054326-I1-GC-CX | 2024-05-28 | Mechanical / HVAC | 1919 SURF AVENUE | PROPOSE INTERIOR RENOVATION AND MECHANICAL WORK FOR A NEW BEAUTY SUPPLY RETAIL STORE. NEW (2) DUCTLESS COMPRESSORS ON EXISTIING PLATFORM IN BUILDING PARKING GARAGE. PLUMBING FILED | $105,920 |
| Q01032237-I1-MS | 2024-04-26 | Mechanical / HVAC | 1-15 57 AVENUE | FILING FOR NEW INLINE EXHAUST FAN FOR NEW COMMERCIAL HOOD IN EXISTING 1ST FLOOR COMMERCIAL SPACE. INSTALLING (7) WATER COOLED INDOOR REFRIGERATION CONDENSERS & WATER COOLED HVAC. S | $40,000 |
| B00988252-I1-GC-CX | 2024-04-19 | Mechanical / HVAC | 60 HENRY STREET | INTERIOR RENOVATION WORK ON EX. 1ST FLOOR COMMERCIAL SPACE. PROPOSED NEW EATING AND DRINKING ESTABLISHMENT W/ACCESSORY CEL. STORAGE, NEW COMM. KIT. HOOD,UTILIZING EXHAUST DUCT TO R | $208,060 |
| B00988252-I1-GC-CX | 2024-04-19 | General construction | 60 HENRY STREET | INTERIOR RENOVATION WORK ON EX. 1ST FLOOR COMMERCIAL SPACE. PROPOSED NEW EATING AND DRINKING ESTABLISHMENT W/ACCESSORY CEL. STORAGE, NEW COMM. KIT. HOOD,UTILIZING EXHAUST DUCT TO R | $208,060 |
| B00847352-I1-MS | 2024-04-05 | Mechanical / HVAC | 1921 SURF AVENUE | FILING TO OBTAIN THE EQ CERTIFICATE OF COMPLIANCE FOR THE HVAC & REFRIGERATION COMPRESSORS INSTALLED ON THE EXTERIOR OF THE BUILDING ABOVE THE OUTDOOR PARKING & FOR THE COMMERCIAL | $20,000 |
| B01025415-I1-GC | 2024-04-05 | General construction | 60 HENRY STREET | INTERIOR CLEANUP OF EXISTING 1ST FLOOR COMMERCIAL SPACE. PATCH ALL OPENINGS IN FIRE-RATING & FLOORING; EX. NON-BEARING WALLS AND PARTITIONS TO BE DEMOLISHED AND REMOVED. | $36,960 |
| Q00964034-I1-GC | 2023-12-15 | General construction | 1-15 57 AVENUE | INTERIOR RENOVATION IN EXISTING 1ST FLOOR COMMERCIAL SPACE. NEW STORAGE & WALK IN BOX. WATERPROOFING & FLOOR FINISHING. NEW MECHANICAL EQUIPMENT.NEW COMMERCIAL KITCHEN HOOD & NEW I | $97,704 |
| S00974010-I1-GC | 2023-12-12 | General construction | 1689 RICHMOND ROAD | INTERIOR DEMO OF NON-BEARING WALLS, PATCH AND FINISH CONCRETE FLOORING IN EXISTING 1ST FLOOR COMMERCIAL SPACE. | $70,000 |
| M00931298-I1-GC-CX | 2023-10-25 | Mechanical / HVAC | 159 WEST 50 STREET | INTERIOR RENOVATION & PLUMBING WORK IN EXISTING 1ST FLOOR COMMERCIAL SPACE. PROPOSED NEW COMMERCIAL KITCHEN HOOD. NEW INLINE EXHAUST FAN. INSTALLING (3) INDOOR REFRIGERATION CONDEN | $123,500 |
| M00931298-I1-GC-CX | 2023-10-25 | General construction | 159 WEST 50 STREET | INTERIOR RENOVATION & PLUMBING WORK IN EXISTING 1ST FLOOR COMMERCIAL SPACE. PROPOSED NEW COMMERCIAL KITCHEN HOOD. NEW INLINE EXHAUST FAN. INSTALLING (3) INDOOR REFRIGERATION CONDEN | $123,500 |
| M00919819-I1-GC | 2023-09-12 | General construction | 159 WEST 50 STREET | INTERIOR RENOVATIONS IN 1ST FLOOR COMMERCIAL SPACE. CLEANUP OF DAMAGED GYPSUM BD. REMOVE FLOORING FINISH AND FALSE CEILING. REMOVE MECHANICAL EXHAUST DUCT & EXISTING HOOD. | $30,000 |
| B00847322-I1-GC | 2023-03-24 | General construction | 1921 SURF AVENUE | INTERIOR RENOVATIONS IN FIRST FLOOR COMMERCIAL SPACE FOR PROPOSED FOOD MARKET WITH NEW COMMERCIAL KITCHEN WITH HOOD. INSTALLATION OF EXHUAST & COMPRESSORS TO BE FILED UNDER APP #B | $97,500 |
| B00823624-I1-GC | 2023-02-16 | General construction | 111 FRANKLIN STREET | INTERIOR RENOVATIONS IN EXISTING 1ST FLOOR COMMERCIAL SPACE. NEW EXTERIOR ADA CONCRETE RAMP. PLUMBING WORK FILED UNDER APP #B00823634 | $65,800 |
| B08036763-I1-GC-CX | 2022-12-27 | General construction | 350 CLARKSON AVENUE | INTERIOR RENOVATION IN EXISTING 1ST FLOOR COMMERCIAL SPACE. PROPOSED NEW COMMERCIAL KITCHEN. PROPOSED NEW COMMERCIAL HOOD CONNECTED TO THE EXHAUST FAN ON ROOF. INSTALL (5) REFRIGER | $88,625 |
| B08036763-I1-GC-CX | 2022-12-27 | Mechanical / HVAC | 350 CLARKSON AVENUE | INTERIOR RENOVATION IN EXISTING 1ST FLOOR COMMERCIAL SPACE. PROPOSED NEW COMMERCIAL KITCHEN. PROPOSED NEW COMMERCIAL HOOD CONNECTED TO THE EXHAUST FAN ON ROOF. INSTALL (5) REFRIGER | $88,625 |
| B08048897-I1-GC | 2022-12-20 | General construction | 111 FRANKLIN STREET | INTERIOR CLEANUP OF EXISTING 1ST FLOOR COMMERCIAL SPACE INCLUDING REMOVING SHELVING, REPAIRING THE SUB-FLOORING & MINOR REPAIRS TO SUPSPENDED CEILING AS NEEDED. | $25,200 |
| S08001221-I1-GC | 2022-09-23 | General construction | 1828 FOREST AVENUE | APPLICATION FILED HEREWITH FOR TOTAL INTERIOR RENOVATION THROUGHOUT EXISTING BUILDING. PLUMBING WORK FILED UNDER SEPARATE APPLICATION. S08004522-P1 | $150,000 |
| S00780020-I1-GC-CX | 2022-08-15 | Mechanical / HVAC | 210 PORT RICHMOND AVENUE | INTERIOR RENOVATIONS IN EXISTING 1ST FLOOR COMMERCIAL SPACE WITH NEW COMMERCIAL HOOD, REFRIGERATION COMPRESSORS, AND EXHAUST. PLUMBING WORK FILED UNDER APPLICATION #S00785267 | $100,840 |
| S00780020-I1-GC-CX | 2022-08-15 | General construction | 210 PORT RICHMOND AVENUE | INTERIOR RENOVATIONS IN EXISTING 1ST FLOOR COMMERCIAL SPACE WITH NEW COMMERCIAL HOOD, REFRIGERATION COMPRESSORS, AND EXHAUST. PLUMBING WORK FILED UNDER APPLICATION #S00785267 | $100,840 |
| M00763577-I1-GC | 2022-08-02 | General construction | 1471 2 AVENUE | INTERIOR RENOVATION OF EXISTING RETAIL STORE TO INCLUDE MINOR PARTITION WORK; RELOCATION OF ENTRY DOOR; INSTALLATION OF FOOD SERVICE COUNTER. NO CHANGE OF USE, OCCUPANCY OR EGRESS | $57,000 |
| S00721433-I1-GC | 2022-07-25 | General construction | 104 PLEASANT PLAINS AVENUE | APPLICATION FILED HEREWITH FOR TOTAL INTERIOR RENOVATION TO EXISTING RESIDENCE. | $40,000 |
| S00560053-I1-GC | 2022-07-19 | General construction | 454 CORTELYOU AVENUE | FINISH AND INSULATE EXTERIOR FOUNDATION WALLS. INSTALL PARTITIONS FOR THREE FIXTURE BATHROOM. PLUMBING WORKTYPE FILED UNDER SUBSEQUENT APPLICAITON | $7,200 |
| Q00587449-I1-MS | 2022-07-12 | Mechanical / HVAC | 163-22 ROCKAWAY BOULEVARD | installation of mechanical duct work, ventilation and HVAC system as per plans. This application in conjunction with NB # 440648569 (Maintenance building) | $60,000 |
| M00724511-I1-GC-CX | 2022-05-16 | Mechanical / HVAC | 366 WEST 23 STREET | FILING FOR INTERIOR WORK AT THE EXISTING RETAIL STORE(USE GROUP6) DELI GROCERY, REPLACE EXISTING HOOD , CARPENTRY, FLOOR,CEILING AND FINISHES. NO CHNAGE IN USE EGRESS OR OCCUPANCY | $15,980 |
| M00724511-I1-GC-CX | 2022-05-16 | General construction | 366 WEST 23 STREET | FILING FOR INTERIOR WORK AT THE EXISTING RETAIL STORE(USE GROUP6) DELI GROCERY, REPLACE EXISTING HOOD , CARPENTRY, FLOOR,CEILING AND FINISHES. NO CHNAGE IN USE EGRESS OR OCCUPANCY | $15,980 |
| M00714954-I1-GC | 2022-05-12 | General construction | 1693 BROADWAY | Filing for minor interior cosmetic work inside existing partial 1st FL commercial space. Work will include replacing floor tiles, millwork, and interior finishes throughout. work a | $16,000 |
| B00693134-I1-GC | 2022-04-21 | General construction | 60 BROADWAY | FILING FOR INTERIOR RENOVATION IN THE FIRST FLOOR STORE #5 AND #6 AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION | $58,590 |
| B00702506-I1-GC | 2022-04-21 | General construction | 170 NASSAU AVENUE | REMOVAL OF NON-STRUCTURAL MASONRY FILL IN FORMER WINDOW OPENINGS AND REPLACE WITH NEW STORE FRONT TO MATCH 1940 FACADE TREATMENTS. NO STRUCURAL WORK TO BE PERFORMED, EXISTING STEEL | $12,000 |
| Q00695927-I1-GC-CX | 2022-04-19 | Mechanical / HVAC | 52-03 CENTER BOULEVARD | INTERIOR RENOVATIONS IN EXISTING COMMERCIAL SPACE. PROPOSED NEW COMMERCIAL KITCHEN WITH NEW COMMERCIAL HOOD & NEW EXHAUST FAN. NEW DAIKIN HEAT PUMP AND (4) COPELAND INDOOR CONDENSA | $151,700 |
| Q00695927-I1-GC-CX | 2022-04-19 | General construction | 52-03 CENTER BOULEVARD | INTERIOR RENOVATIONS IN EXISTING COMMERCIAL SPACE. PROPOSED NEW COMMERCIAL KITCHEN WITH NEW COMMERCIAL HOOD & NEW EXHAUST FAN. NEW DAIKIN HEAT PUMP AND (4) COPELAND INDOOR CONDENSA | $151,700 |
| Q00704820-I1-GC | 2022-04-08 | General construction | 28-57 FABER TERRACE | FULL INTERIOR RENOVATION IN EXISTING 2-FAMILY BUILDING. NO CHANGE IN OCCUPANCY, USE, OR EGRESS. PLUMBING FILED UNDER APP #Q00704855 | $104,800 |
| B00686017-I1-GC-CX | 2022-04-02 | Mechanical / HVAC | 459 78 STREET | Interior renovation in the cellar and second floor (Attic) as per plans no change in use, egress or occupancy | $31,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
