COMPANY RECORD · NEW YORK, NY

Airtemp Mechanical Servic — permit history in New York, NY

Airtemp Mechanical Servic appears on 27 New York permit records from 2021 through 2026, most often mechanical / hvac (81.8% of the record).

Permit categories

CategoryPermitsShare
Mechanical / HVAC2781.8%
General construction618.2%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20215
20226
20232
20243
20252
202615

Busiest year on record: 2026, with 15 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
337 EAST 74 STREET2026-08-04
1322 CLINTON AVENUE2026-06-12
1328 CLINTON AVENUE2026-06-12
1326 CLINTON AVENUE2026-06-12
3165 BROADWAY2026-04-13
4001 BROADWAY2026-01-23
3503 JOHNSON AVENUE2025-11-12
1631 1 AVENUE2025-03-03
46-09 QUEENS BOULEVARD2024-11-12
78-25 37 AVENUE2024-10-29
31-01 BROADWAY2024-05-29
51-06 NORTHERN BOULEVARD2023-12-13
2929 BROADWAY2023-08-09
69-32 AUSTIN STREET2022-10-31

24 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $10,000 to $800,000, median $63,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

27 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
M01427021-I1-MS2026-08-04Mechanical / HVAC337 EAST 74 STREETREMOVE & REPLACE EXISTING AC SYSTEM W/DAIKIN VRV AIR COOLED CONDENSER & CASSETTE INDOOR UNITS. EXISTING EXHAUST SYSTEM TO REMAIN AS IS.$800,000
X01400257-I1-MS2026-06-12Mechanical / HVAC1322 CLINTON AVENUEREPLACE EXISTING THRU WALL AC UNITS AND SLEEVES WITH NEW PACKAGE TERMINAL AIR CONDITIONING THRU WALL UNITS AND ENLARGED SLEEVES. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.$79,000
X01400257-I1-GC2026-06-12General construction1322 CLINTON AVENUEREPLACE EXISTING THRU WALL AC UNITS AND SLEEVES WITH NEW PACKAGE TERMINAL AIR CONDITIONING THRU WALL UNITS AND ENLARGED SLEEVES. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.$79,000
X01400257-I1-GC2026-06-12Mechanical / HVAC1322 CLINTON AVENUEREPLACE EXISTING THRU WALL AC UNITS AND SLEEVES WITH NEW PACKAGE TERMINAL AIR CONDITIONING THRU WALL UNITS AND ENLARGED SLEEVES. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.$79,000
X01400338-I1-GC2026-06-12General construction1328 CLINTON AVENUEREPLACE EXISTING THRU WALL AC UNITS AND SLEEVES WITH NEW PACKAGE TERMINAL AIR CONDITIONING THRU WALL UNITS AND ENLARGED SLEEVES. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.$119,500
X01400257-I1-MS2026-06-12General construction1322 CLINTON AVENUEREPLACE EXISTING THRU WALL AC UNITS AND SLEEVES WITH NEW PACKAGE TERMINAL AIR CONDITIONING THRU WALL UNITS AND ENLARGED SLEEVES. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.$79,000
X01400312-I1-MS2026-06-12Mechanical / HVAC1326 CLINTON AVENUEREPLACE EXISTING THRU WALL AC UNITS AND SLEEVES WITH NEW PACKAGE TERMINAL AIR CONDITIONING THRU WALL UNITS AND ENLARGED SLEEVES. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.$119,000
X01400312-I1-GC2026-06-12Mechanical / HVAC1326 CLINTON AVENUEREPLACE EXISTING THRU WALL AC UNITS AND SLEEVES WITH NEW PACKAGE TERMINAL AIR CONDITIONING THRU WALL UNITS AND ENLARGED SLEEVES. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.$119,000
X01400312-I1-GC2026-06-12General construction1326 CLINTON AVENUEREPLACE EXISTING THRU WALL AC UNITS AND SLEEVES WITH NEW PACKAGE TERMINAL AIR CONDITIONING THRU WALL UNITS AND ENLARGED SLEEVES. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.$119,000
X01400312-I1-MS2026-06-12General construction1326 CLINTON AVENUEREPLACE EXISTING THRU WALL AC UNITS AND SLEEVES WITH NEW PACKAGE TERMINAL AIR CONDITIONING THRU WALL UNITS AND ENLARGED SLEEVES. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.$119,000
X01400338-I1-MS2026-06-12General construction1328 CLINTON AVENUEREPLACE EXISTING THRU WALL AC UNITS AND SLEEVES WITH NEW PACKAGE TERMINAL AIR CONDITIONING THRU WALL UNITS AND ENLARGED SLEEVES. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.$119,500
X01400338-I1-MS2026-06-12Mechanical / HVAC1328 CLINTON AVENUEREPLACE EXISTING THRU WALL AC UNITS AND SLEEVES WITH NEW PACKAGE TERMINAL AIR CONDITIONING THRU WALL UNITS AND ENLARGED SLEEVES. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.$119,500
X01400338-I1-GC2026-06-12Mechanical / HVAC1328 CLINTON AVENUEREPLACE EXISTING THRU WALL AC UNITS AND SLEEVES WITH NEW PACKAGE TERMINAL AIR CONDITIONING THRU WALL UNITS AND ENLARGED SLEEVES. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.$119,500
M01346058-I1-MS2026-04-13Mechanical / HVAC3165 BROADWAYMechanical Unit(s) replacement along with associated duct work and fans.$30,000
M01329946-I1-MS2026-01-23Mechanical / HVAC4001 BROADWAYAir-cooled Condensing unit replacement along with new Interior Air Handling units and associated piping and ductwork to be installed.$40,000
X01264216-I1-MS2025-11-12Mechanical / HVAC3503 JOHNSON AVENUEReplacement of Existing roof top unit with a new Heat Pump Unit. Associated ducts piping and wiring.$20,000
M01136094-I1-MS2025-03-03Mechanical / HVAC1631 1 AVENUEREPLACEMENT OF 1 EXIST. CONDENSING UNIT ALONG WITH 1 INDOOR AIR HANDLER UNIT TO SERVE THE 001 FLOOR AND INSTALL 1 NEW SPLIT HEAT PUMP CONDENSING UNIT ON ROOF WITH CEILING RECESSED $68,000
Q01137460-I1-MS2024-11-12Mechanical / HVAC46-09 QUEENS BOULEVARDREPLACE EXISTING (2) HVAC ROOFTOP PACKAGE UNITS. INSTALL (1) SPLIT HEAT PUMP OUTDOOR CONDENSING UNIT ON ROOF WITH CEILING RECESSED AIR HANDLING UNIT ON 001 FLOOR. EXISTING DUCTWORK$64,800
Q01129171-I1-MS2024-10-29Mechanical / HVAC78-25 37 AVENUEREPLACEMENT OF 3 MECHANICAL ROOFTOP UNITS WITH 2 UNITS TO SERVE THE FIRST FLOOR. PROPOSED HVAC WORK AT 1ST FLOOR. NO CHANGE, IN USE, EGRESS, OR OCCUPANCY.$33,000
Q00933085-I1-MS2024-05-29Mechanical / HVAC31-01 BROADWAYDIRECT REPLACEMENT OF (1) 7.5 TON OUTDOOR CONDENSER, (1) 7.5-TON INDOOR AIR HANDLER, (1) 5 TON OUTDOOR SPLIT HEAT PUMP CONDENSER, (1) 5-TON INDOOR AIR HANDLER AND (1) BATHROOM EX$44,000
Q00941816-I1-MS2023-12-13Mechanical / HVAC51-06 NORTHERN BOULEVARDDIRECT REPLACEMENT OF ONE (1) 12.5 TON TRANE ROOFTOP COOLING AND HEATING UNIT AND ONE (1) BATHROOM EXHAUST FAN. AT ROOF, CONNECT REPLACEMENT UNIT TO EXIST. GAS PIPING. NO EXISTING$21,000
M00884436-I1-MS2023-08-09Mechanical / HVAC2929 BROADWAYDIRECT REPLACEMENT OF ONE (1) HVAC OUTDOOR CONDENSER AND ONE (1) INDOOR AIR HANDLER. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDER THIS APPLICATION. NO CHANGE IN USE, EGRESS$20,000
Q08014730-I1-MS2022-10-31Mechanical / HVAC69-32 AUSTIN STREETDIRECT REPLACEMENT OF ONE (1) HVAC CEILING UNIT AND TWO (2) BATHROOM EXHAUST FANS. REPLACE HANGER SUPPORTS, BOLTING, DRAIN PAN, AND ASSOCIATED HARDWARE. NO EXISTING BUILDING MATERI$14,000
Q07993540-I1-MS2022-09-15Mechanical / HVAC329 WYCKOFF AVENUEDIRECT REPLACEMENT OF ONE (1) ROOF TOP CONDENSER, ONE (1) INDOOR AIR HANDLER, AND ONE (1) BATHROOM EXHAUST FAN. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDER THIS APPLICATIO$16,000
Q00754174-I1-MS2022-08-05Mechanical / HVAC254-21 HORACE HARDING EXPRESSWAYDIRECT REPLACEMENT OF TWO HVAC ROOFTOP UNITS WITH ONE TRANE 5 TON UNIT AND ONE TRANE 7.5 TON UNIT. REPLACE BATHROOMS EXHAUST FANS. NO EXISTING BUILDING MATERIALS TO BE DISTURBED U$25,000
B00285194-I1-MS2022-04-26Mechanical / HVAC15 TOMPKINS PLACEMECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION TWO FAMILY HOME. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. RELATED APPLICATIONS FILED UNDER BIS # 322021110 AND DOBNOW# B00284944$62,620
M00707954-I1-MS2022-04-20Mechanical / HVAC219 EAST 121 STREETREPLACE FOUR (4) HVAC ROOFTOP CONDENSERS AND ONE (1) REAR CONDENSER AT OSP. ALSO, REPLACE (1) ROOF HEAT EXCHANGER AS PER PLANS. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDE$63,000
Q00373879-I1-MS2022-01-12Mechanical / HVAC61-51 188 STREETReplacement of existing mechanical unit. No change to use, egress or occupancy.$99,999
B00605514-I1-MS2021-11-22Mechanical / HVAC55 STRONG PLACEINSTALLATION OF HVAC UNITS AND ASSOCIATED DUCT AND PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
M00582995-I1-MS2021-11-17Mechanical / HVAC563 PARK AVENUEINSTALLATION OF THRU-WALL CONDENSING UNIT ON 12TH FLOOR FOR APARTMENT #12E, AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$60,000
Q00470578-I1-MS2021-06-25Mechanical / HVAC101-02 QUEENS BOULEVARDINSTALLATION OFMECHANICAL SYSTEMS AND ASSOCIATED DUCTING AND PIPING$50,000
Q00473922-I1-MS2021-05-24Mechanical / HVAC40-28 COLLEGE POINT BOULEVARDINSTALLATION OF NEW DUCTLESS, HVAC, SPLIT SYSTEM HEAT PUMP FOR EXISITING REMOTE STORAGE AREA, AT FIRST FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$17,000
M00313625-I1-MS2021-02-05Mechanical / HVAC183 BLEEKER STREETInstall mechanical heating and hot water equipment for this 2 family and store building. Install 2 sprinklers in utility closets in each apartment.$10,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →