COMPANY RECORD · NEW YORK, NY
Adriatic Plbg & Htg Corp — permit history in New York, NY
Adriatic Plbg & Htg Corp appears on 123 New York permit records from 2019 through 2026, most often plumbing (97.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 123 | 97.6% |
| Fire protection | 3 | 2.4% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 5 |
| 2020 | 13 |
| 2021 | 30 |
| 2022 | 13 |
| 2023 | 14 |
| 2024 | 28 |
| 2025 | 9 |
| 2026 | 14 |
Busiest year on record: 2021, with 30 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Bobby J. Enterprise Inc | 24 | 2026-08-20 |
| Custom Associates Inc | 3 | 2022-09-28 |
| Adriatic Plumbing & Heati | 2 | 2026-06-23 |
| Hoti Group Corp | 2 | 2026-04-24 |
| A & E Construction Of Ny | 1 | 2024-04-08 |
| Aba Home Improvement Inc | 1 | 2025-05-20 |
| All City Renovation LLC | 1 | 2026-01-22 |
| Alti Construction Inc | 1 | 2023-06-29 |
| Creative Structures Inc | 1 | 2024-02-12 |
| Eci Contracting Group Inc | 1 | 2026-08-13 |
| H & D Maintenance Co Inc | 1 | 2024-08-06 |
| Kale Construction Inc | 1 | 2025-11-13 |
16 companies are named alongside Adriatic Plbg & Htg Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1 WEST END AVENUE | 2026-08-20 |
| 172 WEST 79 STREET | 2026-08-20 |
| 250 WEST 103 STREET | 2026-08-13 |
| 490 WEST END AVENUE | 2026-06-23 |
| 49 EAST 96 STREET | 2026-05-27 |
| 11 RIVERSIDE DRIVE | 2026-05-12 |
| 245 EAST 72 STREET | 2026-04-24 |
| 32 BANK STREET | 2026-04-24 |
| 418 CENTRAL PARK WEST | 2026-04-24 |
| 200 EAST 66 STREET | 2026-02-02 |
| 130 WATTS STREET | 2026-01-28 |
| 2 WEST 67 STREET | 2026-01-26 |
| 545 WEST 111 STREET | 2026-01-22 |
| 333 EAST 46 STREET | 2025-11-13 |
79 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $550,000, median $21,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
123 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01436604-S1-PL | 2026-08-20 | Plumbing | 1 WEST END AVENUE | GAS INFRASTRUCTURE RESTORATION AND INSTALLATION OF APPLIANCE AND LOCK-WING VALVES AT ALL STOVES IN APARTMENTS. NO CHANGE IN EGRESS OR OCCUPANCY. | $380,000 |
| M01441342-I1-PL | 2026-08-20 | Plumbing | 172 WEST 79 STREET | Replacement of gas piping serving cooking gas to all residential units and to one commercial unit. No change in use,egress or occupancy. | $227,939 |
| M01434999-S1-PL | 2026-08-13 | Plumbing | 250 WEST 103 STREET | REPLACEMENT OF UNDERGROUND SANITARY LINES LOCATED IN CELLAR. NO CHANGE IN EGRESS OR OCCUPANCY. | $39,000 |
| M01397632-S1-PL | 2026-06-23 | Plumbing | 490 WEST END AVENUE | GAS INFRASTRUCTURE REHABILITATION OF A-LINE APARTMENTS ASSOCIATED WITH LAA NO. M01392070. NO CHANGE IN EGRESS OR OCCUPANCY. | $40,000 |
| M01327639-I1-PL | 2026-05-27 | Plumbing | 49 EAST 96 STREET | INSTALL NEW RESIDENTIAL GAS DRYER AND GAS PIPING FOR APARTMENT 5A. | $5,000 |
| M01368841-S1-PL | 2026-05-12 | Plumbing | 11 RIVERSIDE DRIVE | PL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $10,500 |
| M01195955-S1-PL | 2026-04-24 | Plumbing | 245 EAST 72 STREET | SUBMISSION OF AS-BUILT PLANS. NO CHANGE OF USE, OCCUPANCY OR EGRESS. | $39,000 |
| M01059018-S2-PL | 2026-04-24 | Plumbing | 32 BANK STREET | PLUMBING WORK: Remove existing plumbing fixtures, install new and relocated plumbing fixtures. Install new hot water heater and circulation pump. Reconnect domestic water, sanitar | $144,500 |
| M01321614-S1-PL | 2026-04-24 | Plumbing | 418 CENTRAL PARK WEST | MODIFICATION OF DOMESTIC HOT WATER RETURN SYSTEM. NO CHANGE IN EGRESS OR OCCUPANCY. | $61,600 |
| M01211736-S5-PL | 2026-02-02 | Plumbing | 200 EAST 66 STREET | FIREPLACE PL WORK FILED IN CONJUNCTION WITH DOB NOW GC,PL, MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $10,000 |
| M01331680-I1-PL | 2026-01-29 | Plumbing | 49 EAST 96 STREET | INSTALL NEW RESIDENTIAL GAS DRYER AND GAS PIPING FOR APARTMENT 12A&B. | $5,000 |
| M19528360-S1-PL | 2026-01-28 | Plumbing | 130 WATTS STREET | 5S: Installation of PL fixtures as per plans filed herewith., No change to use, egress or occupancy. | $35,000 |
| M01253250-S1-PL | 2026-01-26 | Plumbing | 2 WEST 67 STREET | GAS WORK IN 12B. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $13,500 |
| M01314147-S1-PL | 2026-01-22 | Plumbing | 545 WEST 111 STREET | RELOCATION OF COLD WATER DOMESTIC DISTRIBUTION FROM ROOF TO CELLAR. INSTALLATION OF PRESSURE BOOSTING SYSTEM. NO CHANGE IN EGRESS OR OCCUPANCY. | $89,000 |
| M01278708-S1-PL | 2025-11-13 | Plumbing | 333 EAST 46 STREET | Plumbing work filed in conjunction with the apartment renovation, no change in use, egress, or occupancy under this application | $15,500 |
| M01288771-S1-PL | 2025-10-24 | Plumbing | 505 WEST END AVENUE | D-LINE GAS RISER REPLACEMENT. INSTALLATION OF NEW APPLIANCE VALVES IN D APARTMENTS. NO CHANGE IN EGRESS OR OCCUPANCY. | $95,000 |
| M01268175-I1-PL | 2025-09-30 | Plumbing | 150 EAST 93 STREET | REPLACE GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $55,000 |
| M01275660-I1-PL | 2025-09-10 | Plumbing | 440 EAST 79 STREET | REPLACEMENT OF FLOOR DRAINS AND ASSOCIATED PIPING AT GARAGE CELLAR LEVEL. FLOOD MITIGATION AND PIPING UPGRADES FOR THE EAST AND WEST SIDE OF THE BUILDING AT CELLAR LEVEL. NO CHANGE | $235,000 |
| M01211736-S1-PL | 2025-07-14 | Plumbing | 200 EAST 66 STREET | PL WORK IN B1803 AND C1805 ON THE 17TH FLOOR FILED UNDER TPPN 3/97 IN CONJUNCTION WITH EDOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $37,500 |
| M01144803-S1-PL | 2025-06-16 | Plumbing | 310 LEXINGTON AVENUE | PL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $17,500 |
| M01188169-I1-PL | 2025-05-21 | Plumbing | 490 WEST END AVENUE | INSTALL NEW RESIDENTIAL GAS DRYER AND WASHER FOR APARTMENT 8E. | $5,000 |
| M01198126-S1-PL | 2025-05-20 | Plumbing | 145 EAST 15 STREET | GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, AND INSTALLATION OF APPLICABLE VALVES AT ALL STOVES IN APARTMENTS. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION W | $420,000 |
| M01033231-S1-PL | 2025-01-13 | Plumbing | 151 WEST 86 STREET | Plumbing fixture work in apartment 1CW. No change to use egress or occupancy. | $27,500 |
| M00874864-S7-PL | 2024-12-12 | Plumbing | 190 EAST 72 STREET | REMOVE EXISTING GAS DRYER IN EXISTING BATHROOM. CAP GAS BRANCH LINE AND REMOVE BRANCH TEE FOR DRYER AT MAIN GAS RISER IN APARTMENT. CAP EXISTING VENT. REPLACE EXISTING WASHER AND D | $5,000 |
| M08048074-I1-PL | 2024-11-18 | Plumbing | 200 EAST 66 STREET | Plumbing work filed in conjunction with the renovation of an existing apartment. Architectural, plumbing and mechanical work filed under separate applications. No change of use, oc | $30,000 |
| M01077098-S1-PL | 2024-11-18 | Plumbing | 200 EAST 66 STREET | PL WORK FILED WITH GC AND MH IN THE COMBINATION OF APTS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $17,500 |
| B01004955-I1-PL | 2024-11-13 | Plumbing | 960 STERLING PLACE | Installation of washers, dryers and sprinklers off domestic over dryers in cellar laundry room. Laundry room for use by tenants of hte building only. No change to occupancy use o | $10,000 |
| M00874864-S4-PL | 2024-10-16 | Plumbing | 190 EAST 72 STREET | REMOVE EXISTING GAS DRYER IN EXISTING BATHROOM. CAP GAS BRANCH LINE AND REMOVE BRANCH TEE FOR DRYER AT MAIN GAS RISER IN APARTMENT. INSTALL ELECTRIC DRYER AND REPLACE EXISTING WASH | $5,000 |
| M01095576-I1-PL | 2024-10-09 | Plumbing | 163 EAST 81 STREET | PROPOSED WORK INCLUDES THE INSTALLATION OF A NEW GAS DRYER AND THE ASSOCIATED NEW GAS DRYER VENT TO CONNECT TO EXISTING EXTERIOR LOUVER. NEW GAS TEE CONNECTION FOR NEW GAS DRYER TO | $5,000 |
| M01101663-S1-PL | 2024-09-17 | Plumbing | 205 EAST 68 STREET | GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, AND INSTALLATION OF APPLICABLE VALVES AT ALL STOVES IN APARTMENTS. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO COMPLETED IN CONJUNCTION WITH | $250,000 |
| M01087573-S1-PL | 2024-09-17 | Plumbing | 200 EAST 69 STREET | GAS INFRASTRUCTURE REPLACEMENT IN CELLAR, GROUND FLOOR, SECOND FLOOR, AND THIRD FLOOR, AND INSTALLATION OF APPLICABLE VALVES AT ALL STOVES IN APARTMENTS. NO CHANGE IN EGRESS OR OCC | $250,000 |
| M01078685-S1-PL | 2024-09-10 | Plumbing | 200 EAST 62 STREET | PLUMBING FIXTURES IN APT 18A FILED IN CONJUNCTION WITH DOB NOW GC . NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $30,000 |
| M00874864-S5-PL | 2024-08-30 | Plumbing | 190 EAST 72 STREET | REMOVE EXISTING GAS DRYER IN EXISTING BATHROOM. CAP GAS BRANCH LINE AND REMOVE BRANCH TEE FOR DRYER AT MAIN GAS RISER IN APARTMENT. INSTALL ELECTRIC DRYER AND REPLACE EXISTING WASH | $5,000 |
| M00874864-S6-PL | 2024-08-09 | Plumbing | 190 EAST 72 STREET | INSTALL NEW GAS DRYER IN APT 3D. NEW GAS BRANCH LINE FOR DRYER AT MAIN GAS RISER IN APARTMENT 3D. INSTALL NEW WASHER. CAP AND REMOVE EXISTING TOILET IN BATHROOM. NO CHANGE IN OCCUP | $7,000 |
| B01041246-S1-PL | 2024-08-09 | Plumbing | 58 TOMPKINS PLACE | Replacement and relocation of plumbing fixtures on Cellar -2nd floor as per plans. No change to use egress or occupancy. | $33,000 |
| M01068378-S1-PL | 2024-08-06 | Plumbing | 253 WEST 73 STREET | GAS INFRASTRUCTURE REHAB, INSTALLATION OF NEW APPLIANCE VALVES IN ALL APARTMENTS, AND REPLACEMENT OF CELLAR GAS DISTRIBUTION PIPING. NO CHANGE IN EGRESS OR OCCUPANCY. WORK DONE IN | $250,000 |
| M00874864-S1-PL | 2024-07-26 | Plumbing | 190 EAST 72 STREET | REMOVE EXISTING GAS DRYER IN EXISTING BATHROOM. CAP GAS BRANCH LINE AND REMOVE BRANCH TEE FOR DRYER AT MAIN GAS RISER IN APARTMENT. INSTALL ELECTRIC DRYER AND REPLACE EXISTING WASH | $5,000 |
| M00874864-S2-PL | 2024-07-25 | Plumbing | 190 EAST 72 STREET | REMOVE EXISTING GAS DRYER IN EXISTING BATHROOM. CAP GAS BRANCH LINE AND REMOVE BRANCH TEE FOR DRYER AT MAIN GAS RISER IN APARTMENT. CAP EXISTING VENT. REPLACE EXISTING WASHER AND D | $5,000 |
| M00874864-S3-PL | 2024-07-25 | Plumbing | 190 EAST 72 STREET | REMOVE EXISTING GAS DRYER IN EXISTING BATHROOM. CAP GAS BRANCH LINE AND REMOVE BRANCH TEE FOR DRYER AT MAIN GAS RISER IN APARTMENT. INSTALL ELECTRIC DRYER AND REPLACE EXISTING WASH | $5,000 |
| M01047659-S1-PL | 2024-07-11 | Plumbing | 200 EAST 66 STREET | PLUMBING FIXTURES FILED IN CONJUNCTION DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $25,000 |
| M01051379-S1-PL | 2024-06-24 | Plumbing | 150 EAST 69 STREET | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APT. 5N ON THE FIFTH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $46,000 |
| M01057677-I1-PL | 2024-06-21 | Plumbing | 415 EAST 54 STREET | Replace or relocate existing fixtures with no change of use, egress, or occupancy under this application. | $8,400 |
| M01020778-S1-PL | 2024-06-12 | Plumbing | 600 WEST 111 STREET | REPLACEMENT OF GAS LINES FOR F-LINE APTS, (2) BOILER PILOTS, LAUNDRY RM DRYERS & APT 16G. REMOVAL OF INDIVIDUAL F-LINE APT METERS. INSTALL (1) NEW METER IN CEL FOR F-LINE RISER & ( | $110,000 |
| M00995138-I1-PL | 2024-05-21 | Plumbing | 190 EAST 72 STREET | PL WORK ASSOCIATED WITH GAS PIPING INSTALLATION FOR APARTMENT 23D. NO CHANGE IN OCCUPANCY, USE OR EGRESS. | $15,000 |
| M00955869-S1-PL | 2024-04-08 | Plumbing | 270 WEST 17 STREET | COMBINATION OF UNIT 19B AND 19C TO CREATE ONE UNIT. | $5,000 |
| M00998434-S1-PL | 2024-03-26 | Plumbing | 200 EAST 66 STREET | PLUMBING FIXTURES IN APT E1902 FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $20,000 |
| M01010662-S1-PL | 2024-03-26 | Plumbing | 200 EAST 66 STREET | PLUMBING WORK IN D1703 FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $32,500 |
| M01013127-S1-PL | 2024-03-21 | Plumbing | 310 WEST 106 STREET | GAS INFRASTRUCTURE RESTORATION AND INSTALLATION OF NEW MASTER METER IN CELLAR AND INSTALLATION OF NEW APPLIANCE VALVES IN ALL APARTMENTS IN ASSOCIATION WITH M00972040-I1 . NO CHANG | $240,000 |
| M00974019-S1-PL | 2024-03-18 | Plumbing | 200 EAST 66 STREET | PLUMBING FIXTURES IN APT E502 FILED IN CONJUNCTION WITH DOB NOW GC . NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $25,000 |
| M00963955-S1-PL | 2024-02-12 | Plumbing | 45 TUDOR CITY PLACE | REPLACE IN PLACE PLUMBING FIXTURES AS PER PLANS SUBMITTED. | $6,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
