COMPANY RECORD · BISMARCK, ND

Abc Electric — permit history in Bismarck, ND

Abc Electric appears on 28 Bismarck permit records from 2022 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical28100%

Activity by year

YearPermits issued
20224
20239
20247
20255
20263

Busiest year on record: 2023, with 9 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
615 CALVERT DR2026-05-26
1416 E F AVE2026-03-17
3332 NORTHROP DR2026-02-12
602 SHALE DR2025-12-05
302 W DIVIDE AVE2025-09-08
4117 KITES LN2025-07-16
1700 PIPER ST2025-06-24
3907 LONE PEAK DR2025-05-19
407 FLINT DR2024-12-09
1109 SOCORRO PL2024-11-13
5413 ONYX DR2024-10-29
1132 PIONEER DR2024-09-24
2012 TULE LN2024-06-25
4205 BUGLE BND2024-04-11

26 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $0, median $0. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

28 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BELC2026-03442026-05-26Electrical615 CALVERT DRTEMPORARY SERVICE, NEW HOME CONSTRUCTION 200 AMP SERVICE$0
BELC2026-01342026-03-17Electrical1416 E F AVESERVICE UPGRADE AND REMODEL HOUSE$0
BELC2026-00692026-02-12Electrical3332 NORTHROP DRFINISH 2 BEDROOMS IN LOWER LEVEL$0
BELC2025-09452025-12-05Electrical602 SHALE DRTEMPORARY SERVICE, NEW HOME CONSTRUCTION. 200 AMP SERVICE$0
BELC2025-06452025-09-08Electrical302 W DIVIDE AVECHANGE ELECTRIC SERVICE FROM OVERHEAD TO UNDERGROUND 200AMP$0
BELC2025-04872025-07-16Electrical4117 KITES LNTEMP POWER, NEW HOME CONSTRUCTION 200AMP SERVICE$0
BELC2025-04162025-06-24Electrical1700 PIPER STTEMPORARY SERVICE, NEW BUILDING CONSTRUCTION 600AMP 3 PHASE$0
BELC2025-02992025-05-19Electrical3907 LONE PEAK DRADD RECEPTACLES, LIGHTS AND PTAC UNIT TO SUNROOM$0
BELC2024-09812024-12-09Electrical407 FLINT DRTEMP POWER, NEW HOME HOME CONSTRUCTION 200 AMP SERVICE$0
BELC2024-09102024-11-13Electrical1109 SOCORRO PLHOOK UP HOT TUB$0
BELC2024-08712024-10-29Electrical5413 ONYX DRBASEMENT FINISH, 3 BEDROOMS, BATHROOM AND FAMILY ROOM$0
BELC2024-07572024-09-24Electrical1132 PIONEER DRSERVICE PANEL UPGRADE 200AMP$0
BELC2024-04462024-06-25Electrical2012 TULE LNINSTALL NEW RECEPTACLE ABOVE FIRE PLACE, REPLACE BAD NOTES$0
BELC2024-02072024-04-11Electrical4205 BUGLE BNDTEMPORARY SERVICE, NEW HOME CONSTRUCTION$0
BELC2024-01592024-03-19Electrical926 N 35TH STCOMPLETE GARAGE WIRING$0
BELC2023-08002023-10-24Electrical403 MARBLE DRTEMP SERVICE,NEW HOME CONSTRUCTION,200 AMP SERVICE$0
BELC2023-07192023-09-19Electrical1313 SORRENTO CIRKITCHEN REMODEL/ ADDITION$0
BELC2023-06922023-09-11Electrical1100 YEGEN RDADD 200AMP 3 PHASE PANEL$0
BELC2023-05922023-08-10Electrical5126 DRIFTWOOD LNADD CT METERING FOR EXISTING ELECTRIC CAR CHARGER$0
BELC2023-04022023-06-26Electrical4618 FELDSPAR DRELECTRIC CAR CHARGER INSTALL WITH RATE METER$0
BELC2023-02162023-04-24Electrical5500 NIAGARA DRWIRE 2 BEDROOMS AND BATHROOM IN UNFINISHED BASEMENT$0
BELC2023-02172023-04-24Electrical775 MUNICH DRHOOK UP HOT TUB$0
BELC2023-01512023-03-22Electrical2518 E DIVIDE AVENEW DUPLEX HOME 200 AMP SERVICE$0
BELC2023-01522023-03-22Electrical2520 E DIVIDE AVENEW DUPLEX HOME 200 AMP SERVICE$0
BELC2022-09972022-11-17Electrical1100 YEGEN RDRECONNECT POWER FROM RELOCATED METER TO EXISTING SERVICE.$0
BELC2022-09552022-11-03Electrical4917 WEYBURN DRTEMPORARY SERVICE, NEW HOME CONSTRUCTION. 200 AMP SERVICE$0
BELC2022-09492022-11-02Electrical1100 YEGEN RDNEW 1PH 200 AMP SERVICE FOR TRUCK PEDESTAL POWER, NOTES...$0
BELC2022-08772022-10-06Electrical800 N 10TH STINSTALL 200 AMP SERVICE, OVERHEAD$0

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Bismarck permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →