COMPANY RECORD · RALEIGH, NC
The Bath Remodeling Center — permit history in Raleigh, NC
The Bath Remodeling Center appears on 95 Raleigh permit records from 2015 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 95 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 6 |
| 2016 | 5 |
| 2017 | 7 |
| 2018 | 7 |
| 2019 | 12 |
| 2020 | 7 |
| 2021 | 13 |
| 2022 | 13 |
| 2023 | 4 |
| 2024 | 10 |
| 2025 | 7 |
| 2026 | 4 |
Busiest year on record: 2021, with 13 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 11825 North Exeter Way | 2026-08-10 |
| 6240 Rushingbrook Dr | 2026-06-03 |
| 12532 Richmond Run Dr | 2026-03-04 |
| 3215 Mid Pines Rd | 2026-02-24 |
| 8219 Stonetown Ave | 2025-12-08 |
| 10728 Round Brook Cir | 2025-10-20 |
| 1524 Rodessa Run | 2025-07-21 |
| 1844 Torrington St | 2025-05-05 |
| 10655 Bedfordtown Dr | 2025-04-29 |
| 10405 Chandler Way | 2025-03-19 |
| 9510 Clubvalley Way | 2025-01-15 |
| 2223 Clayette Ct | 2024-12-11 |
| 2912 Lake Boone Pl | 2024-07-31 |
| 9320 Palm Bay Cir | 2024-07-10 |
86 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $2,234 to $28,725, median $7,387. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
95 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDR-036439-2026 | 2026-08-10 | General construction | 11825 North Exeter Way | 2ND FLOOR BATHROOM REMODEL - REMOVE NON-STRUCTURAL WALLS AT SHOWER, ALL NEW PLUMBING FIXTURES; NEW 4 | $3,467 |
| BLDR-025110-2026 | 2026-06-03 | General construction | 6240 Rushingbrook Dr | 2 phase renovation including hall and master bathrooms. Hall bathroom renovation to include convert | $7,003 |
| BLDR-007369-2026 | 2026-03-04 | General construction | 12532 Richmond Run Dr | Master bathroom alterations to include framing for new shower pan, recessed niche in shower, recesse | $13,646 |
| BLDR-007296-2026 | 2026-02-24 | General construction | 3215 Mid Pines Rd | 1st floor bathroom- Removing jetted tub and framing and installing walk in shower with a bench and n | $13,862 |
| BLDR-054092-2025 | 2025-12-08 | General construction | 8219 Stonetown Ave | Remodel of 2 bathrooms - Phase 1 Second floor Hall bathroom alterations to include replacement of tu | $11,047 |
| BLDR-047336-2025 | 2025-10-20 | General construction | 10728 Round Brook Cir | 2ND FLOOR GUEST BATH - RUN PLUMBING FOR NEW PREFAB SHOWER PAN, INSTALL NEW TOILET AND PEDESTAL SINK. | $6,065 |
| BLDR-030870-2025 | 2025-07-21 | General construction | 1524 Rodessa Run | 1ST FLOOR MASTER BATH ALTERATION TO INCLUDE: REMOVE TUB AND RELOCATE SHOWER TO THIS AREA RELOCATING | $7,220 |
| BLDR-018119-2025 | 2025-05-05 | General construction | 1844 Torrington St | 1ST FLOOR MASTER BATH ALTERATION TO INCLUDE: REMOVE TUB AND CONVERT TO ZERO ENTRY SHOWER AS PER ENGI | $8,801 |
| BLDR-017281-2025 | 2025-04-29 | General construction | 10655 Bedfordtown Dr | REMODEL 2 BATHROOMS IN PHASES: PHASE 1 - 2ND FLOOR HALL BATH - REPLACE TUB, TOILET, CABINET, SINK, F | $13,378 |
| BLDR-011424-2025 | 2025-03-19 | General construction | 10405 Chandler Way | 2ND FLOOR MASTER BATHROOM: REMOVE TUB AND CAP OFF DRAIN; RELOCATE SHOWER AND DRAIN AS NEEDED; NEW 40 | $8,801 |
| BLDR-001351-2025 | 2025-01-15 | General construction | 9510 Clubvalley Way | 2nd floor master bathroom alteration to include: remove tub and convert to freestanding unit relocat | $13,453 |
| BLDR-059179-2024 | 2024-12-11 | General construction | 2223 Clayette Ct | 1st floor master bathroom - remove tub and convert to freestanding unit relocating drain as needed; | $8,449 |
| BLDR-035831-2024 | 2024-07-31 | General construction | 2912 Lake Boone Pl | 2ND FLOOR JACK AND JILL BATHROOM REMODEL TO INDLUDE: REMOVING AND REPLACING ALL TILE, THE TOILET, TH | $9,576 |
| BLDR-032891-2024 | 2024-07-10 | General construction | 9320 Palm Bay Cir | 2ND FLOOR MASTER BATH REMODEL TO INCLUDE: REMOVING AND REPLACING ALL TILE, CABINETS, LIGHT FIXTURES, | $6,337 |
| BLDR-032413-2024 | 2024-07-10 | General construction | 4907 Gann Trl | 2ND FLOOR MASTER BATH REMODEL TO INCLUDE: REMOVING EXISTING TUB AND REPLACING WITH A STAND ALONE. RE | $11,861 |
| BLDR-032352-2024 | 2024-07-09 | General construction | 113 Berry Hill Dr | 1ST FLOOR HALL BATH REMODEL TO INCLUDE: REMOVING AND REPLACING CABINETS, VANITY LIGHTS, PLUMBING FIX | $4,281 |
| BLDR-030353-2024 | 2024-06-28 | General construction | 614 Capital Blvd 229 | 2ND FLOOR, CONDO, MASTER BATHROOM REMODEL TO INCLUDE: REMOVING TUB AND CREATING SHOWER IN ITS PLACE | $7,401 |
| BLDR-025142-2024 | 2024-05-24 | General construction | 8004 Morgans Way | 2ND FLOOR MASTER BATH ALTERATION TO INCLUDE REMOVING AND ADDING ALL NEW TILE, REMOVING AND REPLACING | $4,354 |
| BLDR-022199-2024 | 2024-05-14 | General construction | 2001 Falls Farm Crsg | 2ND FLOOR MASTER BATHROOM ALTERATION TO INCLUDE: REMOVE TUB AND CAP OFF DRAIN; EXPAND SHOWER AND REL | $14,512 |
| BLDR-020995-2024 | 2024-05-14 | General construction | 3936 Bentley Bridge Rd | master bath alteration to include: new cabinets, tops, tile, new tub change orientation and relocate | $18,866 |
| BLDR-011904-2024 | 2024-03-21 | General construction | 5200 Pomfret Pt | MASTER BATH ALTERATION TO INCLUDE: REPLACE TUB, EXPAND SHOWER AND RELOCATE DRAIN AS NEEDED; NEW 40ML | $14,512 |
| BLDR-030524-2023 | 2023-06-27 | General construction | 9141 Meadow Mist Ct | 2nd floor master bath alteration to include: remove tub and convert to freestanding unit relocating | $6,575 |
| BLDR-023702-2023 | 2023-05-25 | General construction | 11736 Stannary Pl | 2ND FLOOR MASTER BATH ALTERATION - REMOVE TUB AND CONVERT TO SHOWER, RELOCATING DRAIN AS NEEDED; CAP | $9,104 |
| BLDR-019466-2023 | 2023-05-08 | General construction | 2412 Goodrich Dr | HALL BATH ALTERATION - REPLACE ALL TILE (FLOORS & WALLS), REPLACE TUB, NEW CBAINETS, TOPS, PLUMBING | $4,552 |
| BLDR-019816-2023 | 2023-05-08 | General construction | 7711 Sutcliffe Dr | 2ND FLOOR HALL BATH ALTERATION TO INCLUDE: REPLACE TUB; ALL NEW TILE - FLOORS & WALLS; NEW CABINET, | $2,529 |
| BLDR-047639-2022 | 2022-09-20 | General construction | 435 Drummond Dr | 1st floor master bath alteration to include: Remove tub and replace with freestanding unit. Relocate | $7,586 |
| BLDR-041818-2022 | 2022-09-16 | General construction | 5304 Tallowtree Dr | 2nd floor master bath alteration to include: Remove tub and replace with freestanding unit. Relocate | $7,586 |
| BLDR-044125-2022 | 2022-08-30 | General construction | 8013 Pony Pasture Ct | 2nd FL Master Bath Alteration to include: remove tub and replace with freestanding unit. Relocate dr | $7,586 |
| BLDR-037872-2022 | 2022-07-27 | General construction | 227 Elm St | 1st floor master bath alteration to include: relocate toilet; relocate shower; new cabinets, tops, t | $7,334 |
| BLDR-035292-2022 | 2022-07-14 | General construction | 8100 Tylerton Dr | 2nd floor Master bathroom alteration to include: remove tub, & convert to freestanding unit relocati | $10,747 |
| BLDR-030591-2022 | 2022-06-16 | General construction | 1805 Bridgeport Dr | 2nd floor Master bath alteration to include: remove tub & convert to linen closet capping off drain; | $6,566 |
| BLDR-030803-2022 | 2022-06-16 | General construction | 1901 Torrington St | 1st floor master bath alteration to include-remove tub & relocate drain for new shower, relocate sho | $6,566 |
| BLDR-030786-2022 | 2022-06-16 | General construction | 8100 Tylerton Dr | 2nd floor hall bath- direct replace tub, new bypass shower door, new tile, cabinets, tops & plumbing | $6,566 |
| BLDR-017349-2022 | 2022-04-04 | General construction | 313 Marlowe Rd | Second floor Master bath alteration to include: Remove Tub and convert to shower stall; Relocate sin | $7,387 |
| BLDR-017610-2022 | 2022-04-04 | General construction | 8613 Wood Lawn Dr | First floor master bath alteration to include: Expand bathroom into unused open space in bedroom; r | $7,442 |
| BLDR-012180-2022 | 2022-03-16 | General construction | 3953 Bentley Bridge Rd | 2nd floor master bathroom remodel | $7,387 |
| BLDR-008272-2022 | 2022-02-22 | General construction | 1516 Wood Spring Ct | 2nd floor master bath remodel | $7,387 |
| BLDR-004306-2022 | 2022-01-31 | General construction | 5009 Clyden Cv | MASTER BATH REMODEL | $7,387 |
| BLDR-058971-2021 | 2021-12-20 | General construction | 5204 Doncaster Ct | Master bath remodel | $6,566 |
| BLDR-058962-2021 | 2021-12-20 | General construction | 3715 Old Post Rd | 1st floor master bath alteration. | $6,566 |
| BLDR-050197-2021 | 2021-10-26 | General construction | 9101 Fawn Hill Ct | 2nd flr master bath, alterations to include remove tub, expand shower, new tile, cabinets & tops, ne | $8,755 |
| BLDR-045515-2021 | 2021-10-01 | General construction | 2608 Trickle Ct | 2ND FL MASTER BATH ALTERATION TO INCLUDE: REMOVE TUB AND REPLACE WITH FREESTANDING UNIT; NEW 40 ML | $9,576 |
| BLDR-046084-2021 | 2021-10-01 | General construction | 8219 Stonetown Ave | FIRST FL MASTER BATH ALTERATION TO INCLUDE - REMOVE TUB 7 CONVERT TO SHOWER STALL - RELOCATE DRAIN A | $9,576 |
| BLDR-045238-2021 | 2021-09-28 | General construction | 3600 Turnbridge Dr | 2nd Floor Master Bathroom Remodel - Remove tub & convert to shower relocating drain, new plumbing, e | $7,114 |
| BLDR-039394-2021 | 2021-08-20 | General construction | 3600 Turnbridge Dr | HALL BATH ALTERATION-REPLACE TUB, NEW TILE, CABINETS, TOPS. RELOCATE ELECTRICAL BOXES AS NEEDED; NEW | $2,736 |
| BLDR-033187-2021 | 2021-07-26 | General construction | 8628 Churchdown Ct | 1st floor bathroom remodel | $6,293 |
| BLDR-033175-2021 | 2021-07-16 | General construction | 8601 Stanton Pl | 2ND FLOOR BATHROOM REMODEL | $5,472 |
| BLDR-019589-2021 | 2021-05-04 | General construction | 9411 Harvest Acres Ct | SECOND FLOOR BATHROOM REMODEL - REMOVE TUB & CONVERT TO SHOWER RELOCATING DRAIN AS NEEDED- CAP OFF D | $6,415 |
| BLDR-019583-2021 | 2021-05-04 | General construction | 2210 Hopeton Ave | SECOND FLOOR MASTER BATHROOM ALTERATION- REMOVE TUB & CONVERT TO SHOWER RELOCATING DRAIN AS NEEDED- | $6,672 |
| BLDR-012290-2021 | 2021-04-12 | General construction | 10707 Longholme Way | MASTER BATH ALTERATION TO INCLUDE REMOVING TUB AND CONVERT TO FREESHANDING UNIT. ENLARGE SHOWER AND | $5,389 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Raleigh permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
