COMPANY RECORD · MINNEAPOLIS, MN

Yale Mechanical — permit history in Minneapolis, MN

Yale Mechanical appears on 119 Minneapolis permit records from 2016 through 2026, most often mechanical / hvac (67.2% of the record).

Permit categories

CategoryPermitsShare
Mechanical / HVAC8067.2%
Plumbing3529.4%
General construction43.4%

3 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20162
201712
20184
201924
202020
202110
202211
202320
202410
20254
20262

Busiest year on record: 2019, with 24 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
1800 BROADWAY ST NE2026-05-13
760 MILITARY HWY2026-02-20
2015 CENTRAL AVE NE2025-09-29
115 4TH ST S2025-04-29
1 TWINS WAY2024-12-17
3745 HIAWATHA AVE2024-10-18
331 2ND AVE S2024-09-12
35 7TH ST S2024-08-15
800 1ST ST N2024-05-30
2504 25TH AVE S2024-05-03
1121 JACKSON ST NE2024-04-01
740 LAKE ST E2024-02-20
2425 MINNEHAHA AVE2023-12-21
1001 2ND AVE N2023-12-13

84 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

119 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BLDG11717832026-05-13General construction1800 BROADWAY ST NEREMOVE EXISTING PAD, REPLACE WITH NEW PAD. (JJL) ENGINEER: MARK A FRANZ #48158
BLDG11654702026-02-20Plumbing760 MILITARY HWYMaintenance garage Plumbing fit-out #860
BLDG11449122025-09-29Mechanical / HVAC2015 CENTRAL AVE NEReplace MUA unit
BLDG11153822025-04-29Mechanical / HVAC115 4TH ST Sheat pump and cooling tower replacement
BLDG11153802025-04-29Mechanical / HVAC115 4TH ST Sreplace boiler
BLDG11031832025-01-16Mechanical / HVAC115 4TH ST Sreplace boiler
BLDG10943762024-12-17General construction1 TWINS WAYEQUIPMENT CLOSURE AT TARGET FIELD. ENCLOSURE IF MADE OF STEEL PANELS. LOCATED ON THE SERVICE LEVEL BEHIND LEFT FIELD NEAR THE BATTING CAGE. (JJL) ENGINEER: SANTHOSHA SHANBHOGUE
BLDG10945842024-12-12Mechanical / HVAC1 TWINS WAYInstalling VRF mini split system for communications room per approved plan.
BLDG10652012024-10-18Mechanical / HVAC3745 HIAWATHA AVEreconfiguration of dust collection system
BLDG10824462024-09-12Mechanical / HVAC331 2ND AVE S2 boiler replacements
BLDG10794282024-08-15Mechanical / HVAC35 7TH ST S5 TON REPLACEMENT ROOFTOP UNIT Review Note: Unless technically unfeasible, new and replacement rooftop equipment shall be provided with insulated curbs as described in the
BLDG10625152024-05-30Mechanical / HVAC800 1ST ST NReplacement Makeup Air Unit emailed applicant for BTUH of equipment - 2024-05-28 - lea
BLDG10553782024-05-03Mechanical / HVAC2504 25TH AVE SRTU Replacement Review Note: Unless technically unfeasible, new and replacement rooftop equipment shall be provided with new insulated curbs as described in the 2024
BLDG10515932024-04-12General construction1800 BROADWAY ST NEconstruct concrete pads for air compressor and relates tanks and equipment. engineer: franz #48158
BLDG10518232024-04-01Mechanical / HVAC1121 JACKSON ST NEMinor duct alteration for modified floor plan. Plan available in projectdox.
BLDG10455562024-02-20Plumbing740 LAKE ST Eteen challenge 3rd floor bathroom
BLDG10117582023-12-21Mechanical / HVAC2425 MINNEHAHA AVE1. As specified the airside economizer shall equipped with economizer fault detection and diagnostics (FDD) to meet MEC 2020 section C403.5.5 or Ashrae 90.1 section 6.4.3.12 . 2.
BLDG10322562023-12-13General construction1001 2ND AVE NREPLACE EXISTING BI-FOLD DOORS WITH NEW ONES. PER DOOR MANUFACTUER, DOOR IS SUPPORTED BY THE FLOOR AND A SELF SUPPORTING FRAME. DOOR SIZE IS NOT CHANGING FROM PREVIOUS SIZE. (JJL
BLDG10335912023-11-21Mechanical / HVAC2001 BLAISDELL AVEreplace RTU
BLDG10248872023-11-20Mechanical / HVAC1025 CURRIE AVE W #K04Food/Kitchen 4-Install Revent 726 Rack Oven. If protein cooking, the exhaust system will need to comply with type 1 exhaust systems listed in NFPA 96 and ASHRAE 54. I was lead t
BLDG10273742023-10-20Plumbing12 FRANKLIN AVE EGas connections to two (2) ranges and one (1) deep fryer. Gas piping is existing with range connections.
BLDG10143612023-08-25Mechanical / HVAC4426 CHOWEN AVE Sreplace boiler
BLDG10144192023-08-25Mechanical / HVAC3401 DUPONT AVE Sreplace boiler
BLDG10064892023-08-21Mechanical / HVAC1113 FRANKLIN AVE EFurnish and install one Bryant 5-ton packaged roof top unit including roof curb adapter, economizer and hail guard.
BLDG10065772023-08-03Mechanical / HVAC431 1ST AVE Nfan coil and condenser replacement
BLDG10065812023-08-03Mechanical / HVAC431 1ST AVE N15-ton condenser replacement
BLDG10028512023-06-27Plumbing3500 28TH ST EFOR HIAWATHA HIGH SCHOOL SCIENCE ROOMS - Install five (5) owner furnish science room sinks.
BLDG10028632023-06-23Mechanical / HVAC3500 28TH ST E1 new VAV and associated ducts. Also rework of exiting duct layout to accommodate floor plan modifications. Drawing has been uploaded.
BLDG9970712023-05-25Mechanical / HVAC3205 EXCELSIOR BLVD #MINIKAHDA
BLDG9939482023-05-03Mechanical / HVAC4640 17TH AVE SHVAC alteration for new layout installing GRDs and all associated ductwork. Refer to attached drawings.
BLDG9933402023-04-28Mechanical / HVAC331 2ND AVE SRepair and/or replacement of two cooling units and condenser
BLDG9898902023-04-24Plumbing4640 17TH AVE SDemolish existing shower. Provide waste, water, and vent piping. Provide one (1) floor set toilet with manual flush valve. Provide one (1) wall mounted lavatory with manual faucet.
BLDG9887472023-04-03Mechanical / HVAC1928 UNIVERSITY AVE NE1300.0130 CONSTRUCTION DOCUMENTS. § Subpart 1. Submittal documents. Construction documents, special inspection and structural observation programs, and other data s
BLDG9884802023-03-28Mechanical / HVAC3118 SNELLING AVEreplace 2 RTU
BLDG9787502023-02-14Mechanical / HVAC2425 MINNEHAHA AVEHVAC alteration, adding two new rooftop units, two make up air units, two type 1 hoods, exhaust fans, electric unit heaters, three VAV boxes, GRDs and all associated ductworks. Ref
BLDG9822942023-02-03Mechanical / HVAC5701 NICOLLET AVEReplacement boiler.
BLDG9696412022-11-17Mechanical / HVAC3515 HENNEPIN AVEREPLACE STEAM BOILER FOR NG BOILER
BLDG9662002022-10-11Mechanical / HVAC2309 HAYES ST NEReplace (2) RTU, (2) condensing units, (1) MUA and (13) PRV exhaust fans
BLDG9591152022-08-23Mechanical / HVAC115 4TH ST SReplacing two existing rooftop units 7.5 & 12 tons.
BLDG9573932022-08-11Mechanical / HVAC360 HOOVER ST NEReplacing two 5 & 10 tons existing rooftop units. This permit is companion of BLDG852255.
BLDG9561902022-08-03Mechanical / HVAC1928 UNIVERSITY AVE NEReplacing existing 4 ton split system.
BLDG9570112022-08-02Plumbing3249 3RD AVE SReplace 40 gallon gas water heater
BLDG9431302022-05-05Mechanical / HVAC920 28TH ST EReplace Condensing Unit (Like for Like)
BLDG9394262022-04-22Plumbing2825 LAKE ST EWater fountain replacement.
BLDG9320682022-03-22Mechanical / HVAC360 HOOVER ST NEHVAC system, installing one gas heat rooftop unit GRDs and all associated ductwork. Refer to attached drawings.
BLDG9282132022-02-22Plumbing5701 NICOLLET AVEReplacing water storage tanks with two (2) BWH119ST storage tanks, insulated and jacketed.
BLDG9268662022-02-08Plumbing1500 FRANKLIN AVE SEREPLACE SEWAGE EJECTOR
BLDG9161712021-11-16Mechanical / HVAC2843 26TH AVE SGas piping per attached plan.
BLDG9128892021-11-15Mechanical / HVAC50 LOWRY AVE NHVAC system installing two rooftop units, exhaust fan, GRD's and all associated ductwork. Refer to attached drawings
BLDG9048002021-08-26Mechanical / HVAC1350 LAGOON AVEImprovement of HVAC system adding two VAV boxes, GRDs and all associated ductwork. Refer to attached drawings.

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →