COMPANY RECORD · MINNEAPOLIS, MN
Wolf River Electric — permit history in Minneapolis, MN
Wolf River Electric appears on 231 Minneapolis permit records from 2020 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 231 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 8 |
| 2021 | 30 |
| 2022 | 36 |
| 2023 | 44 |
| 2024 | 40 |
| 2025 | 50 |
| 2026 | 23 |
Busiest year on record: 2025, with 50 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every Minneapolis permit, not only this company's
This page is a snapshot of Wolf River Electric. The search behind it holds more than 344,348 Minneapolis permits naming a contractor, since 2016: 135,724 plumbing permits, 129,438 building permits, 78,172 mechanical (HVAC) permits, 1,014 demolition permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit Wolf River Electric files, or any new building permit in Minneapolis. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Where they worked
| Address in source | Most recent permit |
|---|---|
| 4115 BRYANT AVE S | 2026-09-23 |
| 3443 GRAND AVE S | 2026-09-10 |
| 3712 16TH AVE S | 2026-08-19 |
| 5405 DUPONT AVE S | 2026-08-05 |
| 1704 TAYLOR ST NE | 2026-07-16 |
| 3521 LAKE ST E | 2026-06-23 |
| 2614 WASHINGTON ST NE | 2026-06-09 |
| 4429 45TH AVE S | 2026-06-08 |
| 3322 LOGAN AVE N | 2026-05-28 |
| 3529 18TH AVE S | 2026-05-20 |
| 205 33RD ST W | 2026-05-13 |
| 3840 ELLIOT AVE | 2026-05-08 |
| 3159 31ST AVE S | 2026-04-17 |
| 2324 LYNDALE AVE S | 2026-04-01 |
214 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Centerpoint Energy Resource Corp | 72 | 2018–2026 |
| Centerpoint Energy | 23 | 2017–2026 |
| Standard Heating And Air Conditioning Inc | 18 | 2017–2026 |
| Warners Stellian Co Inc | 15 | 2017–2026 |
| Urban Pine Plumbing And Mechanical Inc | 13 | 2017–2026 |
| Renewal By Andersen Corp | 12 | 2018–2026 |
| Home Energy Center Inc | 12 | 2017–2026 |
| Champion Plumbing LLC | 11 | 2018–2025 |
Companies that also appear in Minneapolis permit records at addresses where Wolf River Electric filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
231 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDG1199987 | 2026-09-23 | General construction | 4115 BRYANT AVE S | SOLAR. (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _11.400___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT | |
| BLDG1198558 | 2026-09-10 | General construction | 3443 GRAND AVE S | INSTALL NEW FRANKLIN WH ENERGY STORAGE SYSTEM AT SFD - INCLUDING ONE FRANKLIN "aPOWER 2" (15.0 KWH) BATTERY AT BASEMENT (INTERIOR OF SOUTH SIDE FOUNDATION WALL ADJACENT TO MAIN ELE | |
| BLDG1196230 | 2026-08-19 | General construction | 3712 16TH AVE S | SOLAR. (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __7.930__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT P | |
| BLDG1192459 | 2026-08-05 | General construction | 5405 DUPONT AVE S | Addition of 19 Modules to the Existed Roof Mounted PV System (MAA) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _8.075___ KW S | |
| BLDG1182709 | 2026-07-16 | General construction | 1704 TAYLOR ST NE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY __8.925__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1 | |
| BLDG1182183 | 2026-06-23 | General construction | 3521 LAKE ST E | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __40.8__ KW ADDITIONAL PERMITS: PV SYSTEMS ALSO REQUIRE AN ELECTRICAL PERMIT (STATE | |
| BLDG1180646 | 2026-06-09 | General construction | 2614 WASHINGTON ST NE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING -ACW COLLECTOR CAPACITY _9.350___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1 | |
| BLDG1182760 | 2026-06-08 | General construction | 4429 45TH AVE S | INSTALL 5.1 kW (DC) FLUSH SOLAR PV SYSTEM (12 MODULES) AT SOUTH SIDE ROOF SLOPE OF SFD. Does the system include battery backup or an uninterrupted power supply (UPS)? NO If Yes | |
| BLDG1181473 | 2026-05-28 | General construction | 3322 LOGAN AVE N | Roof Mounted PV Solar INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 8.075 KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT | |
| BLDG1179481 | 2026-05-20 | General construction | 3529 18TH AVE S | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. - 2020 IRC COLLECTOR CAPACITY 6.80KW. SOLAR CHECKLIST COMPLETED. A 36" wide pathway complying wit | |
| BLDG1175587 | 2026-05-13 | General construction | 205 33RD ST W | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.-ACW COLLECTOR CAPACITY __7.2__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325 | |
| BLDG1178383 | 2026-05-08 | General construction | 3840 ELLIOT AVE | INSTALLATION OF ADDITIONAL MODULES TO AN EXISTING ROOF MOUNTED PV SOLAR COLLECTOR CAPACITY __additional 3.2__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EX | |
| BLDG1172219 | 2026-04-17 | General construction | 3159 31ST AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.-ACW COLLECTOR CAPACITY _7.650___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 13 | |
| BLDG1167977 | 2026-04-01 | General construction | 2324 LYNDALE AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __18.000__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325. | |
| BLDG1169977 | 2026-03-31 | General construction | 4409 15TH AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _7.65___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.11 | |
| BLDG1170530 | 2026-03-30 | General construction | 3154 JOHNSON ST NE | Partial reroof of the home, front of the home. | |
| BLDG1166657 | 2026-03-03 | General construction | 1215 PIERCE ST NE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _8.5___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.110 | |
| BLDG1157753 | 2026-02-27 | General construction | 3117 DUPONT AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __11.205__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325. | |
| BLDG1165490 | 2026-02-24 | General construction | 5405 DUPONT AVE S | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF EXISTING DETACHED GARAGE . AAJ (PROJECT DOX PLANS AND DOCUMENTS). COLLECTOR CAPACITY _5.10___KW. AP | |
| BLDG1152742 | 2026-01-27 | General construction | 3758 RUSSELL AVE N | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. - 2020 IRC COLLECTOR CAPACITY 6.225 KW. SOLAR CHECKLIST COMPLETED. A 36" wide pathway complying w | |
| BLDG1148232 | 2026-01-26 | General construction | 1551 EAST RIVER TERR | INSTALL 6.375 kW (DC) FLUSH SOLAR PV SYSTEM (15 MODULES/1 ARRAY) AT SE SLOPE OF SFD GABLE ROOF. Does the system include battery backup or an uninterrupted power supply (UPS)? | |
| BLDG1147798 | 2026-01-13 | General construction | 4015 36TH AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __6.225__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1 | |
| BLDG1153759 | 2026-01-13 | General construction | 2410 UPTON AVE N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 6.225 KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 | |
| BLDG1153564 | 2025-12-11 | General construction | 4317 COLUMBUS AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY __9.545__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1 | |
| BLDG1154642 | 2025-12-09 | General construction | 4401 RUSSELL AVE N | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. - 2020 IRC COLLECTOR CAPACITY 8.075KW. SOLAR CHECKLIST COMPLETED. A 36" wide pathway complying wi | |
| BLDG1152206 | 2025-12-09 | General construction | 1000 51ST ST E | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. - 2020 IRC COLLECTOR CAPACITY 11.90 KW. SOLAR CHECKLIST COMPLETED. A 36" wide pathway complying w | |
| BLDG1153723 | 2025-12-05 | General construction | 2705 FREMONT AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __3.6__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.110 | |
| BLDG1153757 | 2025-11-26 | General construction | 1837 QUINCY ST NE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __15.3__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.11 | |
| BLDG1153752 | 2025-11-26 | General construction | 4120 32ND AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 6.225 KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 | |
| BLDG1150447 | 2025-11-17 | General construction | 2300 32ND AVE S | SOLAR. (JJL) ENGINEER: EUGENE MUNYANZIZA #61220 INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY ___9.775_ KW SOLAR CHECKLIST A | |
| BLDG1149976 | 2025-10-31 | General construction | 4723 NOKOMIS AVE S | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD AND ITS DET GARAGE. - 2020 IRC COLLECTOR CAPACITY 11.90 KW. SOLAR CHECKLIST COMPLETED. A 36" wide | |
| BLDG1145615 | 2025-10-31 | General construction | 4516 44TH AVE S | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. - 2020 IRC COLLECTOR CAPACITY_ 8.10 KW. SOLAR CHECKLIST COMPLETED. A 36" wide pathway complying w | |
| BLDG1149010 | 2025-10-24 | General construction | 5140 NEWTON AVE N | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD AND DET. GARAGE. - 2020 IRC COLLECTOR CAPACITY 15.20 KW. SOLAR CHECKLIST COMPLETED. A 36" wide pat | |
| BLDG1148520 | 2025-10-24 | General construction | 2534 TAYLOR ST NE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __7.28__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.11 | |
| BLDG1148227 | 2025-10-24 | General construction | 4450 LONGFELLOW AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __9.775__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1 | |
| BLDG1146016 | 2025-10-17 | General construction | 2007 DREW AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __8.8__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.110 | |
| BLDG1145873 | 2025-10-08 | General construction | 3427 QUEEN AVE N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 10.4 KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 S | |
| BLDG1122653 | 2025-10-02 | General construction | 1826 DUPONT AVE N | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF SINGLE FAMILY HOUSE AND DETACHED GARAGE. AAJ (PROJECT DOX PLANS AND DOCUMENTS). ***PROVIDE MIN. 18" ROO | |
| BLDG1144363 | 2025-09-29 | General construction | 4004 22ND AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __10.2__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.11 | |
| BLDG1145566 | 2025-09-29 | General construction | 2625 BRYANT AVE S | Tear off rotten pieces of wood siding and replace. Not a full replacement. | |
| BLDG1138010 | 2025-09-25 | General construction | 919 SHERIDAN AVE N | SOLAR ON HOUSE AND GARAGE. (JJL) EXISTING ROOF EVALUATED BY: EUGENE MUNYANZIZA #61220 INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACIT | |
| BLDG1143610 | 2025-09-23 | General construction | 4202 UPTON AVE S | SOLAR. (JJL) ENGINEER: EUGENE MUNYANZIZA #61220 INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __8.0__ KW SOLAR CHECKLIST ATT | |
| BLDG1139605 | 2025-09-17 | General construction | 4524 35TH AVE S | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS AND DOCUMENTS). ***PROVIDE MIN. 18" ROOF ACCESS | |
| BLDG1139624 | 2025-09-12 | General construction | 3000 JAMES AVE N | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. - 2020 IRC COLLECTOR CAPACITY 6.225KW. SOLAR CHECKLIST COMPLETED. A 36" wide pathway complying w | |
| BLDG1140992 | 2025-09-04 | General construction | 1826 DUPONT AVE N | Reroof home and detached garage. | |
| BLDG1132800 | 2025-09-02 | General construction | 2449 GIRARD AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. (MAA) COLLECTOR CAPACITY __19.92__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 132 | |
| BLDG1136514 | 2025-08-28 | General construction | 2449 GIRARD AVE S | Reroof -ACW Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITI | |
| BLDG1138614 | 2025-08-25 | General construction | 2227 2ND ST NE | Reroof of home | |
| BLDG1135773 | 2025-08-15 | General construction | 4251 NICOLLET AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __19.35__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1 | |
| BLDG1125577 | 2025-08-12 | General construction | 2515 ARTHUR ST NE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __7.2__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.110 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
