COMPANY RECORD · MINNEAPOLIS, MN
Shanecon Inc — permit history in Minneapolis, MN
Shanecon Inc appears on 43 Minneapolis permit records from 2017 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 43 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2017 | 4 |
| 2018 | 7 |
| 2019 | 3 |
| 2020 | 3 |
| 2021 | 5 |
| 2022 | 9 |
| 2023 | 1 |
| 2024 | 2 |
| 2025 | 6 |
| 2026 | 3 |
Busiest year on record: 2022, with 9 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 241 FREMONT AVE N | 2026-05-13 |
| 2116 LYNDALE AVE S | 2026-05-01 |
| 1501 WASHINGTON AVE S | 2026-04-14 |
| 2426 INGLEWOOD AVE | 2025-05-23 |
| 920 LAKE ST E | 2025-02-06 |
| 200 6TH ST S #296 | 2025-01-22 |
| 2901 38TH AVE S | 2025-01-03 |
| 1380 WEST MINNEHAHA PKWY | 2024-09-10 |
| 410 OAK GROVE ST | 2023-05-19 |
| 3225 EAST MINNEHAHA PKWY | 2022-12-02 |
| 3215 EAST MINNEHAHA PKWY | 2022-11-07 |
| 801 9TH ST SE | 2022-10-21 |
| 1519 COMO AVE SE | 2022-08-18 |
| 2422 CENTRAL AVE NE | 2022-08-15 |
36 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
43 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDG1170125 | 2026-05-13 | General construction | 241 FREMONT AVE N | New pergola -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC architect: Dean, Christian Daniel engineer: Milkert, Crai | |
| BLDG1156650 | 2026-05-01 | General construction | 2116 LYNDALE AVE S | remodel store front including accessible entry, doors, windows, and wall finishes. encroachment permit issued for sloped walk and steps/railings certificate of occupancy required | |
| BLDG1159184 | 2026-04-14 | General construction | 1501 WASHINGTON AVE S | Remodel restaurant into new restaurant/coffee shop -ACW certificate of occupancy required: no special inspections required: no const type: III-B occupancy: | |
| BLDG1138212 | 2025-09-23 | General construction | 241 FREMONT AVE N | New retaining walls, ramps and fencing. Work in addition to BLDG1138212 SAC: _52.17_CHARGES _43.36_CREDITS = _8.81 or 9_NET MET COUNCIL LETTER DATED _8/20/25_ | |
| BLDG1052879 | 2025-05-23 | General construction | 2426 INGLEWOOD AVE | construct 9 unit apartment building. certificate of occupancy required: yes Note: R2 Apartment with S2 enclosed parking garage. CONST TYPE: 5b NUMBER OF STORIES: 3 OCCUPA | |
| BLDG1099614 | 2025-03-24 | General construction | 241 FREMONT AVE N | certificate of occupancy required: NO mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections requir | |
| BLDG1095319 | 2025-02-06 | General construction | 920 LAKE ST E | (DMH-ProjectDox) LOWER LEVEL REMODEL TO CONVERT STORAGE AREA TO COMMERCIAL KITCHEN FACILITY (1,900SF) WITH OFFICE, DRY STORAGE, WALK-IN FREEZER AND COOLER. Const type: 1-A | |
| BLDG1098241 | 2025-01-22 | General construction | 200 6TH ST S #296 | Green & Grain - Kitchen Expansion certificate of occupancy required: no special inspections required: no const type: 1B occupancy: A-2 2020 MSBC occupant | |
| BLDG1094469 | 2025-01-03 | General construction | 2901 38TH AVE S | interior remodeling and bathroom alterations. certificate of occupancy required: no const type: 5b occupancy: A3 2020 MSBC occupant load: 296 s | |
| BLDG1070140 | 2024-09-10 | General construction | 1380 WEST MINNEHAHA PKWY | (DMH-ProjectDox) STATE LICENSED RESIDENTIAL DWELLING (SFD). SELECT DEMO AT BASMENT, 1ST & 2ND FLOORS FOR 4 SLEEPING ROOMS. NEW RESIDENTIAL ELEVATOR INSTALL, KITCHEN AND | |
| BLDG1045922 | 2024-03-05 | General construction | 1380 WEST MINNEHAHA PKWY | NON STRUCTURAL DEMO ONLY (MAA) | |
| BLDG991941 | 2023-05-19 | General construction | 410 OAK GROVE ST | FOOD 6TH FLOOR CATERING AREA RENOVATIONS certificate of occupancy required: no const type: noncombust occupancy: mixed 2020 MSBC sac: _1.02_ charges | |
| BLDG960488 | 2022-12-02 | General construction | 3225 EAST MINNEHAHA PKWY | Convert Church To 21 Res Units certificate of occupancy required: yes CONST TYPE: 5-B NUMBER OF STORIES: 3 OCCUPANCY: R-2 2020 MSBC SPRINKLERED: YES SPRI | |
| BLDG960513 | 2022-11-07 | General construction | 3215 EAST MINNEHAHA PKWY | New 6 Residential Unit Bldg 3/29/23 approved post-issue revision from 7 Units to 6 Units (gross area not changed just unit count) certificate of occupancy required: yes CONST | |
| BLDG965532 | 2022-10-21 | General construction | 801 9TH ST SE | (DMH-ProjectDox) CONSTRUCT NEW CONCRETE ENTRANCE AND STAIRS AT SOUTH END OF BUILDING, WITH MECHANICAL IMPROVEMENTS FOR NEW GYMNASTICS TENANT. NEW TENANT IS CHANGE IN OCCUPANCY. | |
| BLDG964041 | 2022-09-20 | General construction | 3225 EAST MINNEHAHA PKWY | InteriorChurchDemoONLY(PLAN14290) No drawings | |
| BLDG948114 | 2022-08-18 | General construction | 1519 COMO AVE SE | New restaurant tenant - Boludo CERTIFICATE OF OCCUPANCY REQUIRED - AN AUTHORIZED REPRESENTATIVE OF THE PERMIT APPLICANT MUST CALL 612-673-2327 TO SCHEDULE A CERTIFICATE OF OCCU | |
| BLDG952029 | 2022-08-15 | General construction | 2422 CENTRAL AVE NE | REMODEL OF DINING ROOM AND BAR certificate of occupancy required: no special inspections required: no const type: 5-B occupancy: A-2, S-2 2020 MSBC occupan | |
| BLDG945810 | 2022-06-07 | General construction | 1121 HENNEPIN AVE | **THIS PERMIT IS ISSUED FOR COLLECTION OF MISSING FIVE (5) SAC CHARGES FROM PERMIT #BLDG935305 ISSUED IN 04/22/2022 - AAJ*** | |
| BLDG930946 | 2022-05-20 | General construction | 1917 LOGAN AVE S | CHURCH INTERIOR REMODEL, DEMO FEW WALLS, MEP AND PLUMBING UPGRADES (MAA) certificate of occupancy required: NO const type: III B (ASSUMED) occupancy: A-3 2020 | |
| BLDG935305 | 2022-04-22 | General construction | 1121 HENNEPIN AVE | STRUCTURAL REPAIR OF EXISTING BUTCHER'S TALE PATIO ENCLOSURE PER STRUCTURAL ENGINEER'S DESIGN. AAJ (PROJECT DOX PLANS). certificate of occupancy required: NO mechanical plans r | |
| BLDG920423 | 2021-12-23 | General construction | 8 38TH ST W | TENANT FIT OUT: EXISTING BAR TO NEW RESTAURANT. CHANGED LAYOUT, NEW FINISHES, BRICKWORK. ANY STRUCTURAL WORK WILL REQUIRE A NEW PERMIT. (JJL) certificate of occupancy requir | |
| BLDG903456 | 2021-10-18 | General construction | 3943 1ST AVE S | MINOR BASEMENT REMODEL AT LOWER LEVEL OF LOWER UNIT (3943) TO CREATE NEW 83 SF OFFICE WITH STORAGE CLOSET WITHIN EXISTING UNFINISHED STORAGE/UTILITY ROOM AND ALTER WALL AT LAUNDRY | |
| BLDG893395 | 2021-09-13 | General construction | 1410 NICOLLET AVE | BUILDOUT FOR NEW GYM/FITNESS CENTER certificate of occupancy required: yes special inspections required: no const type: I-A occupancy: B (small A-3) 2020 M | |
| BLDG858172 | 2021-04-06 | General construction | 1400 NICOLLET AVE | (DMH - ProjectDox) INTERIOR BUILD-OUT TO 1,306 SQ.FT. GROUND FLOOR TENANT SPACE FOR RESTAURANT/ CAFE WITH NEW KITCHEN FACILITIES AND 2 SINGLE USER ADA RESTROOMS. Certificat | |
| BLDG853478 | 2021-04-06 | General construction | 1414 NICOLLET AVE | New Sonora Grill On Sale Liquor Restaurant Certificate of Occupancy is required CONST TYPE: I-A NUMBER OF STORIES: OCCUPANCY: A-2 2020 MSBC OCCUPANT LOAD: 1 | |
| BLDG819177 | 2020-11-10 | General construction | 4046 LYNDALE AVE N | (DMH#2) INTERIOR REHABILITATION TO EXISTING 11 UNIT APT BUILDING. SEE DRAWING DETAILS FOR WORK TO BE DONE IN EACH UNIT AND COMMON AREAS. WORK GENERALLY INCLUDES REMODELING ALL | |
| BLDG817661 | 2020-08-25 | General construction | 1040 COMO AVE SE | 29 UNITS. TYPE VA CONSTRUCTION. NO COMMERCIAL SPACE. ACCESSIBLE ENTRANCES LOCATED AT STAIR A, STAIR B, AND VESTIBULE. BIKE STORAGE AT LEVEL 1. SMOKE ENCLOSURES LOCATED AT ELEV | |
| BLDG828244 | 2020-05-19 | General construction | 837 GLENWOOD AVE | alterations to 1st and 2nd floor for beauty salon. sck encroachment permit required from public works for sloped accessible route to main entry. certificate of occupancy requ | |
| BLDG788127 | 2019-10-11 | General construction | 1500 LAKE ST W | Remodel restaurant tenant space certificate of occupancy required: NO special inspections required: NO const type: V-B occupancy: A-2 2015 MSBC occupant load: 7 | |
| BLDG781025 | 2019-07-01 | General construction | 3833 EWING AVE S | Structural remodeling of SF including new "bedroom" in basement. Applicant to demonstrate to inspector that all requirements listed on Basement Bedroom handout are satisfied. If | |
| BLDG749645 | 2019-01-31 | General construction | 4503 FRANCE AVE S | JINX TEA TENANT BUILDOUT CERTIFICATE OF OCCUPANCY REQUIRED - AN AUTHORIZED REPRESENTATIVE OF THE PERMIT APPLICANT MUST CALL 612-673-2327 TO SCHEDULE A CERTIFICATE OF OCCUPANCY INSP | |
| BLDG735559 | 2018-12-28 | General construction | 733 MARQUETTE AVE #223 | SUITE 223. EXISTING SPACE IS CUIRRENTLY EMPTY. ADDING NEW BEP EATERY. NO BATHROOM. CONFIRM EATERY HAS PROPER ACCESSIBLE SEATING. EATERY IS SMALL AND IS CLASSIFIED AS A B OCCUPANCY | |
| BLDG719714 | 2018-10-04 | General construction | 2909 BRYANT AVE S | CONSTRUCT ONE RESIDENTIAL LOFT ADDITION ON TOP OF EXISTING THREE STORIES OFFICE BUILDING. AAJ#1 ***11/15/2018 - REVISION TO SCOPE OF WORK WITH ALTERNATE TO CONSTRUCTION MATERI | |
| BLDG725871 | 2018-10-03 | General construction | 321 14TH AVE SE | New Restaurant Use certificate of occupancy required: no special inspections required: no const type: IIIB (assumed) occupancy: B 2015 MSBC occupant load: 48 sprinklered: no Tenan | |
| BLDG698992 | 2018-05-14 | General construction | 4126 3RD AVE S | Source Information is Not Available. Source Data Does Not Meet Reporting Standards. Please Review and Correct Source. | |
| BLDG708180 | 2018-05-09 | General construction | 2819 NICOLLET AVE | DEMO ONLY See Engineer's Letter Dated May 3, 2018 | |
| BLDG693865 | 2018-04-09 | General construction | 2422 CENTRAL AVE NE | EXPAND KITCHEN AND REMODEL PARTIAL RESTAURANT (MAA #02) certificate of occupancy required NO const type: VB occupancy: A2 2015 MSBC occupant load: Sprink | |
| BLDG694183 | 2018-03-02 | General construction | 2604 LYNDALE AVE S | Modifying existing space for assembly, adding an exit and sprinkler system. certificate of occupancy required yes mechanical plans required for certificate of occupancy - pr | |
| BLDG675815 | 2017-10-26 | General construction | 200 6TH ST S | NEW RESTAURANT IN SHELL SPACE (MAA #02) ********EXIT DOORS TO PROVIDE PANIC HARDWARE certificate of occupancy required YES mechanical plans required for certificate of o | |
| BLDG669655 | 2017-09-28 | General construction | 920 LAKE ST E | CONVERT NO FOOD SERVICE KIOSK TO FOOD SERVICE AREA AT FOOD COURT (MAA #02) | |
| BLDG669658 | 2017-09-20 | General construction | 920 LAKE ST E #150 | CONVERT NO FOOD SERVICE KIOSK TO FOOD SERVICE AREA AT FOOD COURT (MAA #02) 0 SAC AS PER MET COUNCIL LETTER DATED 8/23/17 | |
| BLDG656615 | 2017-06-27 | General construction | 230 CEDAR LAKE RD S | INSTALL DECK AT EXISTING PATIO AREA (wss) |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
