COMPANY RECORD · MINNEAPOLIS, MN

Ruffner Remodeling And Repair LLC — permit history in Minneapolis, MN

Ruffner Remodeling And Repair LLC appears on 39 Minneapolis permit records from 2017 through 2026, all of them general construction.

Permit categories

CategoryPermitsShare
General construction39100%

Activity by year

YearPermits issued
20173
20183
20196
20204
20214
20226
20236
20243
20253
20261

Busiest year on record: 2019, with 6 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
5817 10TH AVE S2026-01-02
1520 56TH ST E2025-09-15
5500 FREMONT AVE S2025-04-30
705 7TH ST SE2025-03-14
4021 COLUMBUS AVE2024-09-13
4821 GRAND AVE S2024-04-01
1226 WEST MINNEHAHA PKWY2024-01-09
5628 WENTWORTH AVE2023-12-04
4425 16TH AVE S2023-09-15
4916 CLINTON AVE2023-08-23
5905 OLIVER AVE S2023-04-18
4023 WENTWORTH AVE2023-02-16
5129 JAMES AVE S2023-01-06
5722 NEWTON AVE S2022-10-04

37 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

39 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BLDG11591792026-01-02General construction5817 10TH AVE SMAIN FLOOR BATHROOM REMODEL WORK IN EXISTING SINGLE FAMILY HOUSE. AAJ(PROJECT DOX PLAN). - GUT EXISTING BATHROOM TO STUDS TO ALLOW FOR NEW RENOVATION WORK TO BE DONE. - INSU
BLDG11419872025-09-15General construction1520 56TH ST E(DMH-Pdox) BATHROOM REMODEL IN SFD. BUILD SHOWER AT TUB LOCATION. - 2020 MNSBC NO WINDOW REPLACMENT. INSTALL INSULATION AND VAPOR BARRIER AT EXTEROR CONDITIONS. INSTALL FIBE
BLDG11138062025-04-30General construction5500 FREMONT AVE S(DMH-ProjectDox) MAIN FLOOR BATHROOM REMODEL IN SFD. REPLACE FIXTURES IN SAME LOCATIONS. INSTALL GLASS BLOCK WINDOW AT TUB. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFOR
BLDG11089722025-03-14General construction705 7TH ST SEFirst Floor bathroom remodel - ACW Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING,
BLDG10754922024-09-13General construction4021 COLUMBUS AVEBUILD NEW PARTITION WALLS BETWEEN MECHANICAL ROOM AND BATHROOM SPACE TO ENCLOSE/ENLARGE HALF BATHROOM IN BASEMENT OF SFD. INSTALL GYP BOARD FINISHES, NEW LAV/VANITY. EXISTING TOI
BLDG10514012024-04-01General construction4821 GRAND AVE S2ND FLOOR BATHROOM REMODEL OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLAN). - GUT EXISTING BATHROOM TO STUDS TO ALLOW FOR NEW RENOVATION WORK TO BE DONE. - INSULATE
BLDG10388442024-01-09General construction1226 WEST MINNEHAHA PKWY(DMH-ProjectDox) DEMO EXISTING 2ND FLOOR BATHROOM AND INSTALL NEW PARTITION FRAMING & REMODEL INTO 2 NEW BATHROOMS. OTHER PARTITION FRAMING AT 2ND FLOOR BEDROOM AND CLOSET LOCATI
BLDG10343432023-12-04General construction5628 WENTWORTH AVEINSULATE KNEE WALLS AND CEILING AND DRYWALL. NO STRUCTURAL WORK. NOT A BEDROOM OR ADU. (JJL) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322
BLDG10167942023-09-15General construction4425 16TH AVE Sbathroom remodel. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR COND
BLDG10121252023-08-23General construction4916 CLINTON AVEBATHROOM REMODEL OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLAN). - GUT EXISTING BATHRROM TO STUDS AND INSULATE EXTERIOR WALL USING R-20 INSULATION AS REQUIRED BY CODE
BLDG9901802023-04-18General construction5905 OLIVER AVE S(DMH-ProjectDox) BATHROOM REMODEL IN SFD. REPLACE BATHROOM FIXTURES WITH NEW IN SAME LOCATION. CONVERT TUB TO SHOWER STALL. INSTALL INSULATION AND VAPOR BARRIER AT EXTEROR C
BLDG9827012023-02-16General construction4023 WENTWORTH AVEadd half bath to 2nd floor. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/A
BLDG9768292023-01-06General construction5129 JAMES AVE SBATHROOM REMODEL AT SFD (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND H
BLDG9654272022-10-04General construction5722 NEWTON AVE SMAIN FLOOR BATHROOM REMODEL OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLAN). - PARTIAL INTERIOR DEMOLITIONOF EXISTING BATHROOM TO ALLOW FOR NEW RENOVATION WORK TO BE DO
BLDG9624942022-10-04General construction112 52ND ST W2ND FLOOR BATHROOM REMODEL AT SFD (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING
BLDG9639142022-09-29General construction5554 GARFIELD AVEFIRST FLOOR DWELLING BATHROOM REMODELING The building inspector must approve the restoration of fire and acoustical assemblies disrupted by the work before concealment Buildi
BLDG9489552022-06-16General construction5648 PLEASANT AVEBathroom Remodel Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDI
BLDG9369122022-04-07General construction4438 WENTWORTH AVE2ND FLOOR BATH ROOM REMODEL AT SFD (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING,
BLDG9272582022-03-10General construction3937 21ST AVE SADD BASEMENT BEDROOM(GON) Non-habitable space, stairway and room lack the 6'4" headroom clearance. ----- ----- Issuance of this permit doesn't allow a violation of Building Cod
BLDG9106352021-10-07General construction5108 LUVERNE AVENON-STRUCTURAL REMODEL 2ND FLOOR BATHROOM Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBI
BLDG9006282021-08-05General construction5608 1ST AVE SCONVERT EXISTING BASEMENT FLOOR CLOSET SPACE INTO NEW HALF BATHROOM IN A SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS). - INSTALL BATHROOM FIXTURES AND EXHAUST IN EXISTING CLOS
BLDG8861812021-05-18General construction4745 3RD AVE SADD 1/2 BATH AT SFD (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR
BLDG8759132021-03-11General construction120 DIAMOND LAKE RD WMAIN FLOOR BATHROOM REMODEL AT SFD (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING,
BLDG8510122020-10-08General construction4128 COLFAX AVE SNON-STRUCTURAL BATHROOM REMODEL TO SFD INCLUDING REMOVAL OF EXISTING FINISHES. (sza) INSTALL INSULATION AND VAPOR BARRIER AT EXTERIOR WALL CONDITIONS. REPLACE WINDOW IN EXISTING O
BLDG8356942020-06-10General construction3609 10TH AVE SRemodel existing 2nd floor bathroom SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALARMS REQUIRED IN ACCO
BLDG8315652020-05-05General construction4732 10TH AVE S2ND FLOOR BATHROOM REMODEL OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLAN). - REPLACE BATHRROM FIXTURES WITH NEW FIXTURES IN EXACT LOCATIONS. - INSULATE WALL USING B
BLDG8119962020-01-07General construction4717 DUPONT AVE SNON-STRUCTURAL BATHROOM REMODEL TO SFD INCLUDING REMOVAL OF EXISTING FINISHES. (sza) INSTALL INSULATION AND VAPOR BARRIER AT EXTERIOR WALL CONDITIONS. REPLACE WINDOW IN EXISTING O
BLDG7992622019-10-16General construction3929 17TH AVE SMAIN FLOOR BATHROO REMODEOL AND ADD NEW BATHROOM AT SFD (MAA) SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOX
BLDG7805822019-06-20General construction3312 IRVING AVE SMAIN FLOOR BATROOM REMODEL. ***** SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALARMS REQUIRED IN ACC
BLDG7665522019-04-26General construction4744 15TH AVE SREMODEL EXISTING MAIN FLOOR OF A SINGLE FAMILY HOUSE. AAJ#2. - GUT OUT EXISTING BATHROOM TO STUDS WITH THE EXCEPTION OF THE CEILING TO ALLOW FOR NEW RENOVATION WORK TO BE D
BLDG7665542019-04-26General construction4444 5TH AVE SREMODEL EXISTING MAIN FLOOR OF A SINGLE FAMILY HOUSE. AAJ#2. - GUT OUT EXISTING BATHROOM TO STUDS WITH THE EXCEPTION OF THE CEILING TO ALLOW FOR NEW RENOVATION WORK TO BE DONE.
BLDG7527792019-02-01General construction4023 WENTWORTH AVEMAIN FLOOR BATHROOM REMODEL OF EXISTING SINGLE FAMILY HOUSE. AAJ#2. - GUT EXISTING BATHROOM TO STUDS TO ALLOW FOR NEW RENOVATION WORK TO BE DONE. - REPLACE EXISTING BATHRO
BLDG7510672019-01-18General construction6001 12TH AVE SEXISTING BATHROOM IN BASEMENT BEING REMODELED. NO STRUCTURAL WORK. REMOVING NON LOAD BEARING WALL. RELOCATING FIXTURES. NEW FINISHES. REAPLACING WINDOW WITH GLASS BLOCK WINDOW.
BLDG7334672018-10-10General construction5604 BRYANT AVE SBATHROOM REMODEL. EXISTING BATHROOM REMODEL. NO STRUCTURAL WORK. ALL FIXTURES STAY IN SAME LOCATION. (JJL) SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATI
BLDG7216342018-08-01General construction4741 PORTLAND AVEFRAME AND FINISH FOR NEW BASEMENT BATHROOM IN SFD. ALSO FRAME, SPRAY FOAM AND DRYWALL FOUNDATION PERIMETER FOR FINISH. NOT REVIEWED FOR ANY BASEMENT BEDROOM. (DMH#2) CEMENT, F
BLDG6990552018-03-14General construction4741 PORTLAND AVEbathroom remodel (JJL) GENERAL COMMENTS: APPLICANT MUST LOCATE AND IDENTIFY THE PROPERTY STAKES AND CALL FOR INSPECTION FOR BUILDING INSPECTOR VERIFICATION BEFORE CONCRETE IS
BLDG6801622017-10-20General construction5644 WENTWORTH AVENON STRUCTURAL REMODEL 1ST FLOOR BATHROOM AT SFD (JAG) SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALAR
BLDG6640042017-07-06General construction3342 35TH AVE SMAIN FLOOR BATHROOM REMODEL IN SFD. DEMO EXISTING FINISHES AND FIXTURES TO FRAMING. (DMH#2) INSTALL INSULATION AND VAPOR BARRIER AT EXTERIOR WALL CONDITIONS. INSTALL CEMENT BACK
BLDG6282742017-01-03General construction5841 EMERSON AVE Sbasement bathroom NON STRUC GUT REM MAIN FLOOR BATH CONVERTING TUB TO SHOWER AT RELOCATED SPACE. WC AND LAV SAME LOCATIONS. INSULATE EXTERIOR WALL FULL DEPTH ADDING VAPOR/AIR BARR

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →