COMPANY RECORD · MINNEAPOLIS, MN
Mn Solar — permit history in Minneapolis, MN
Mn Solar appears on 56 Minneapolis permit records from 2021 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 56 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 4 |
| 2022 | 17 |
| 2023 | 6 |
| 2024 | 6 |
| 2025 | 14 |
| 2026 | 9 |
Busiest year on record: 2022, with 17 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 2721 GLENWOOD AVE | 2026-08-19 |
| 4428 ABBOTT AVE S | 2026-08-19 |
| 5500 COLUMBUS AVE | 2026-08-13 |
| 3833 15TH AVE S | 2026-06-02 |
| 2327 WALTON PL | 2026-06-02 |
| 3636 BLOOMINGTON AVE | 2026-05-01 |
| 3931 COLFAX AVE N | 2026-02-26 |
| 3716 35TH AVE S | 2026-02-11 |
| 5533 IRVING AVE S | 2026-02-02 |
| 3450 SNELLING AVE | 2025-11-13 |
| 4520 WASHBURN AVE S | 2025-09-29 |
| 5753 BLOOMINGTON AVE | 2025-09-26 |
| 5017 DREW AVE S | 2025-09-24 |
| 4352 NICOLLET AVE | 2025-09-23 |
54 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
56 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDG1195965 | 2026-08-19 | General construction | 2721 GLENWOOD AVE | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. - 2020 IRC COLLECTOR CAPACITY 7.04 KW. SOLAR CHECKLIST COMPLETED. A 36" wide pathway complying wi | |
| BLDG1195967 | 2026-08-19 | General construction | 4428 ABBOTT AVE S | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD AND ITS DETACHED GARAGE. - 2020 IRC COLLECTOR CAPACITY 14.08 KW. SOLAR CHECKLIST COMPLETED. A 36" | |
| BLDG1188348 | 2026-08-13 | General construction | 5500 COLUMBUS AVE | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. - 2020 IRC COLLECTOR CAPACITY 10.56 KW. SOLAR CHECKLIST COMPLETED. A 36" wide pathway complying w | |
| BLDG1181496 | 2026-06-02 | General construction | 3833 15TH AVE S | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS AND DOCUMENTS). ***PROVIDE MIN. 18" ROOF ACCESS ON | |
| BLDG1181497 | 2026-06-02 | General construction | 2327 WALTON PL | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS AND DOCUMENTS). ***PROVIDE MIN. 18" ROOF ACCESS ON | |
| BLDG1171456 | 2026-05-01 | General construction | 3636 BLOOMINGTON AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.-ACW COLLECTOR CAPACITY _6.16__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325 | |
| BLDG1161921 | 2026-02-26 | General construction | 3931 COLFAX AVE N | SOLAR. (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __9.35__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PE | |
| BLDG1162754 | 2026-02-11 | General construction | 3716 35TH AVE S | NSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. (MAA) COLLECTOR CAPACITY __2.97__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1 | |
| BLDG1162747 | 2026-02-02 | General construction | 5533 IRVING AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. (MAA) COLLECTOR CAPACITY __8.35__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1 | |
| BLDG1141663 | 2025-11-13 | General construction | 3450 SNELLING AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __19.44__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1 | |
| BLDG1143906 | 2025-09-29 | General construction | 4520 WASHBURN AVE S | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF EXISTING SINGLE FAMILY HOUSE AAJ (PROJECT DOX PLANS AND DOCUMENTS). ***PROVIDE MIN. 18" ROOF ACCESS ON | |
| BLDG1143909 | 2025-09-26 | General construction | 5753 BLOOMINGTON AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. (MAA) COLLECTOR CAPACITY _10.2___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1 | |
| BLDG1141667 | 2025-09-24 | General construction | 5017 DREW AVE S | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF DET GARAGE TO SFD. - 2020 IRC COLLECTOR CAPACITY 5.85 KW. SOLAR CHECKLIST COMPLETED. A 36" wide pathw | |
| BLDG1135225 | 2025-09-23 | General construction | 4352 NICOLLET AVE | SOLAR. (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _10.35_ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER | |
| BLDG1142978 | 2025-09-23 | General construction | 3049 ELLIOT AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY __6K__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325 | |
| BLDG1141204 | 2025-09-09 | General construction | 1058 16TH AVE SE | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. - 2020 IRC COLLECTOR CAPACITY 8.28 KW. SOLAR CHECKLIST COMPLETED. A 36" wide pathway complying w | |
| BLDG1136209 | 2025-09-03 | General construction | 2636 HARRIET AVE | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. - 2020 IRC COLLECTOR CAPACITY 4.05 KW. SOLAR CHECKLIST COMPLETED. A 36" wide pathway complying w | |
| BLDG1138759 | 2025-09-03 | General construction | 4102 PILLSBURY AVE | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF BUILDING. AAJ (PROJECT DOX PLANS AND DOCUMENTS). ***PROVIDE MIN. 18" ROOF ACCESS ON EACH SIDE OF ROOF R | |
| BLDG1135782 | 2025-08-29 | General construction | 2718 CALIFORNIA ST NE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __13.8__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.11 | |
| BLDG1125660 | 2025-07-02 | General construction | 2115 GRAND ST NE | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF EXISTING DETACHED GARAGE. AAJ (PROJECT DOX PLANS AND DOCUMENTS). ***NOTE: EXISTING ROOF STRUCTURE WAS R | |
| BLDG1121810 | 2025-06-12 | General construction | 2701 EMERSON AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY __5.52__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 13 | |
| BLDG1113284 | 2025-04-21 | General construction | 3724 35TH AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. (MAA) COLLECTOR CAPACITY _5.06___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1 | |
| BLDG1109014 | 2025-04-11 | General construction | 3133 CEDAR AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY _7.47___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 13 | |
| BLDG1097508 | 2024-12-12 | General construction | 1501 23RD AVE NE | INSTALL 5.06 kW (DC) FLUSH ROOF-MOUNT SOLAR PV SYSTEM (11 MODULES/1 ARRAY) ON IRONRIDGE XR100 RAILS FLUSH MOUNT SYSTEM AT SOUTH SLOPE OF HIP ROOF OF TFD. Does the system includ | |
| BLDG1084568 | 2024-12-03 | General construction | 4057 42ND AVE S | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF EXISTING SINGLE FAMILY DWELLING. AAJ (PROJECT DOX PLANS AND DOCUMENTS). ***PROVIDE MIN. 18" ROOF ACCESS | |
| BLDG1081961 | 2024-09-16 | General construction | 4648 CHOWEN AVE S | SOLAR (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __12.42__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT P | |
| BLDG1075840 | 2024-09-16 | General construction | 1121 48TH ST W | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY _6.44___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 13 | |
| BLDG1072380 | 2024-09-06 | General construction | 5640 42ND AVE S | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS AND DOCUMENTS). ***PROVIDE ROOF ACCESS AND PATHWAY | |
| BLDG1049146 | 2024-03-21 | General construction | 1737 KNOX AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __8.2__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.110 | |
| BLDG1022554 | 2023-10-05 | General construction | 1507 OAK PARK AVE N | (DMH-ProjectDox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD AND DETACHED GARAGE. COLLECTOR CAPACITY 9.02 KW. SOLAR CHECKLIST COMPLETED. 2020 IRC | |
| BLDG1019391 | 2023-09-27 | General construction | 609 53RD ST E | SOLAR. (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __13.12__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CER | |
| BLDG1008945 | 2023-07-27 | General construction | 2200 HUMBOLDT AVE S | 4.92kW Solar Photovoltaic Roof Mounted Array. SOLAR PANELS TO BE PLACED ON THE GARAGE. (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECT | |
| BLDG1002003 | 2023-07-06 | General construction | 404 THOMAS AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __8.61__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 | |
| BLDG985802 | 2023-03-10 | General construction | 3350 HUMBOLDT AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 2.96____ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1 | |
| BLDG980005 | 2023-03-08 | General construction | 1134 CEDAR VIEW CIR | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _5.92___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325 | |
| BLDG974238 | 2022-12-19 | General construction | 257 THOMAS AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. 2/3/23 approved post-issue revision to orientation of roof panel 3 COLLECTOR CAPACITY _4.44___ KW SOLAR CHEC | |
| BLDG974048 | 2022-12-07 | General construction | 4109 BURTON LN | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLAN AND DOCUMENTS). ***PROVIDE ROOF ACCESS AND PATHWAYS AS REQUI | |
| BLDG973719 | 2022-12-06 | General construction | 3900 WASHBURN AVE S | SOLAR. (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __5.92__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT | |
| BLDG973031 | 2022-12-02 | General construction | 4516 43RD AVE S | (DMH-ProjectDox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD AND DETACHED GARAGE. COLLECTOR CAPACITY 9.2 KW. SOLAR CHECKLIST COMPLETED. 2020 IRC | |
| BLDG972181 | 2022-11-23 | General construction | 3669 LINCOLN ST NE | INSTALL 10.73 kW (DC) FLUSH ROOF-MOUNT SOLAR PV SYSTEM ON SFD ROOF. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 Construction Documents: ELE | |
| BLDG971627 | 2022-11-18 | General construction | 3800 COLGATE AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. ENGINEER: G XUAN #53437 COLLECTOR CAPACITY __7.3__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT P | |
| BLDG972178 | 2022-11-17 | General construction | 2701 EMERSON AVE S | SOLAR. (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _4.8___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT | |
| BLDG972179 | 2022-11-17 | General construction | 308 2ND ST NE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 7.4 KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.110 | |
| BLDG971404 | 2022-11-10 | General construction | 4049 BRYANT AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _13.2___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Subp | |
| BLDG960889 | 2022-09-29 | General construction | 4641 WASHBURN AVE S | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLAN AND DOCUMENTS). ***PROVIDE ROOF ACCESS AND PATHWAYS | |
| BLDG956304 | 2022-08-01 | General construction | 2839 MCKINLEY ST NE | INSTALL A SOLAR PV SYSTEM ON ROOF OF GARAGE COLLECTOR CAPACITY 8.0 KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Su | |
| BLDG953824 | 2022-07-18 | General construction | 3307 OAKLAND AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF DWELLING. COLLECTOR CAPACITY _4.81___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Sub | |
| BLDG951200 | 2022-07-11 | General construction | 1522 EMERSON AVE N | (DMH-ProjectDox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF DETACHED GARAGE TO SFD. COLLECTOR CAPACITY _5.6 KW. SOLAR CHECKLIST COMPLETED. 2020 IRC | |
| BLDG949004 | 2022-06-16 | General construction | 4520 WASHBURN AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __4.8__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Su | |
| BLDG923475 | 2022-03-25 | General construction | 1312 17TH AVE N | INSTALL SOLAR SYSTEM ON ROOF ----- COLLECTOR CAPACITY 5.5 kWDC ----- SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Subp.5a a |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
