COMPANY RECORD · MINNEAPOLIS, MN
Houwman Architects — permit history in Minneapolis, MN
Houwman Architects appears on 36 Minneapolis permit records from 2021 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 36 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 1 |
| 2023 | 11 |
| 2024 | 15 |
| 2025 | 8 |
| 2026 | 1 |
Busiest year on record: 2024, with 15 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 2910 PILLSBURY AVE | 2026-03-23 |
| 2937 PLEASANT AVE | 2025-12-10 |
| 200 LAKE ST W #334 | 2025-01-09 |
| 200 LAKE ST W | 2025-01-03 |
| 2937 PLEASANT AVE #602 | 2024-11-25 |
| 2910 PILLSBURY AVE #142 | 2023-11-09 |
| 815 CEDAR AVE S | 2023-09-15 |
| 815 CEDAR AVE S #B | 2023-07-26 |
8 distinct addresses on record. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
36 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDG1069503 | 2026-03-23 | General construction | 2910 PILLSBURY AVE | construct 3 level pedestrian walkway connection between adjacent buildings. certificate of occupancy required: no special inspections required: yes const type: nonco | |
| BLDG1118497 | 2025-12-10 | General construction | 2937 PLEASANT AVE | buildout for retail grocery store - 1st floor and 2nd floor retail sales, portion of 3rd floor commercial kitchen area for food preparation and portion of basement level containing | |
| BLDG1136895 | 2025-10-21 | General construction | 2937 PLEASANT AVE | change of occupancy of 5th floor for reception/assembly hall. certificate of occupancy required: yes const type: 1b occupancy: A3 2020 MSBC occupant load: | |
| BLDG1110659 | 2025-07-30 | General construction | 2937 PLEASANT AVE | 6th Floor Office Buildout certificate of occupancy required: no special inspections required: no const type: 1B occupancy: B 2020 MSBC occupant load: | |
| BLDG1110657 | 2025-07-23 | General construction | 2937 PLEASANT AVE | Tenant buildout for 4th floor retail space -ACW CERTIFICATE OF OCCUPANCY REQUIRED CONST TYPE: IB NUMBER OF STORIES: 12 OCCUPANCY: M 2020 MSBC SPRINKLERED: | |
| BLDG1118492 | 2025-06-24 | General construction | 2937 PLEASANT AVE | construct exterior mechanical equipment platforms. architect: houwman engineer: fisher #55463 Fisher Structural Engineering special inspections required | |
| BLDG1108415 | 2025-03-20 | General construction | 2910 PILLSBURY AVE | T/I UNIT 359 BARBER SHOP 2020 MSBC sac: _0.17_ charges _0.04_ credits = _0.13_ net met council letter dated _03/14/25_ architect: 22604 - Houwman, Brian Wayne @ HO | |
| BLDG1098367 | 2025-01-09 | General construction | 200 LAKE ST W #334 | Tenant Buildout for New 3rd Floor Learning Center - Suite 334 certificate of occupancy required: no special inspections required: no const type: 1B occupancy: | |
| BLDG1094596 | 2025-01-03 | General construction | 200 LAKE ST W | new child daycare buildout on 4th floor. certificate of occupancy required yes const type: 1b occupancy: I4 2020 MSBC occupant load: __57___ occupants @ | |
| BLDG1085356 | 2024-11-25 | General construction | 2937 PLEASANT AVE #602 | 6th floor tenant build out for adult daycare - MAX 80 OCCUPANTS CERTIFICATE OF OCCUPANCY REQUIRED - AN AUTHORIZED REPRESENTATIVE OF THE PERMIT APPLICANT MUST CALL 612-673-2327 T | |
| BLDG1078604 | 2024-11-25 | General construction | 2937 PLEASANT AVE | buildout on 3rd floor for child daycare. approx 3800 sq ft. certificate of occupancy required yes 8 Infants, 8 toddlers, 16 preschool, 19 school age const type: 1b | |
| BLDG1079491 | 2024-09-10 | General construction | 2910 PILLSBURY AVE | buildout taekeout coffee shop in unit 285. certificate of occupancy required: no const type: 2a occupancy: b 2020 MSBC sprinklered: yes Tenant: | |
| BLDG1065889 | 2024-07-11 | General construction | 200 LAKE ST W | Daycare T.I. - Suite 406 const type: 1B occupancy: I-4 2020 MSBC occupant load: 62 occupants @ 35 sq ft per occupant sprinklered: yes sac: 3.57 charg | |
| BLDG1046214 | 2024-06-17 | General construction | 200 LAKE ST W | Combine suites 350B, 351A, 351B, 352, and 353 for grocery store suite 351 certificate of occupancy required: no sac: _0.31_ charges _0.31_ credits = _0_ net met council le | |
| BLDG1012900 | 2024-04-18 | General construction | 2910 PILLSBURY AVE | 4 story office addition. southwest corner of complex. certificate of occupancy required: no special inspections required: yes const type: 2a occupancy: b | |
| BLDG1048754 | 2024-04-16 | General construction | 200 LAKE ST W | #450A Eclipse Barber Build out certificate of occupancy required: yes const type: 1-B occupancy: B 2020 MSBC occupant load: 4 sprinklered: yes | |
| BLDG1048746 | 2024-04-16 | General construction | 200 LAKE ST W | #205B Botiyow Barber Build out certificate of occupancy required: yes const type: 1-B occupancy: B 2020 MSBC occupant load: 1 sprinklered: yes | |
| BLDG1048749 | 2024-04-16 | General construction | 200 LAKE ST W | #244 Sagal Salon Build out certificate of occupancy required: yes const type: 1-B occupancy: B 2020 MSBC occupant load: 1 sprinklered: yes T | |
| BLDG1048826 | 2024-04-16 | General construction | 200 LAKE ST W | FOOD #494 Carmel Mini Mart LLC build out certificate of occupancy required: yes const type: 1-B occupancy: M 2020 MSBC occupant load: 3 sprinklered: | |
| BLDG1048753 | 2024-04-16 | General construction | 200 LAKE ST W | #418A Lives Beauty Salon Build out certificate of occupancy required: yes const type: 1-B occupancy: B 2020 MSBC occupant load: 1 sprinklered: ye | |
| BLDG1048750 | 2024-04-10 | General construction | 200 LAKE ST W | #307A - TENANT BUILDOUT FOR HAIR SALON. (JJL) CERTIFICATE OF OCCUPANCY REQUIRED CONST TYPE: IB OCCUPANCY: B 2020 MSBC OCCUPANT LOAD: 2 SPRINKLERED: Y | |
| BLDG1048747 | 2024-04-10 | General construction | 200 LAKE ST W | #242 TENANT BUILD OUT. BARBER SHOP. (JJL) CERTIFICATE OF OCCUPANCY REQUIRED CONST TYPE: IB OCCUPANCY: B 2020 MSBC OCCUPANT LOAD: 2 SPRINKLERED: YES FIR | |
| BLDG1048751 | 2024-04-10 | General construction | 200 LAKE ST W | #347 TENANT BUILDOUT FOR HAIR SALON. (JJL) CERTIFICATE OF OCCUPANCY REQUIRED CONST TYPE: IB OCCUPANCY: B 2020 MSBC SPRINKLERED: YES NO FIRE ALARM: YES | |
| BLDG1034909 | 2024-01-23 | General construction | 200 LAKE ST W | CONVERT #251-252 RETAIL TO NEW COFFEE SHOP certificate of occupancy required: no occupancy: B 2020 MSBC occupant load: 10 sac: _0.19_ charges 0.08 _ | |
| BLDG1024852 | 2023-11-09 | General construction | 200 LAKE ST W | Finish shell #199A to new coffee shop certificate of occupancy required: yes special inspections required: no const type: 1-B occupancy: B 2020 MSBC | |
| BLDG1023772 | 2023-11-09 | General construction | 2910 PILLSBURY AVE | Remodel #460 existing retail to coffee shop certificate of occupancy required: no const type: 5-A occupancy: B (fewer than 50 occupants) 2020 MSBC occup | |
| BLDG1024397 | 2023-11-09 | General construction | 200 LAKE ST W | Finish shell #476 to new coffee shop certificate of occupancy required: yes special inspections required: no const type: 1-B occupancy: B 2020 MSBC sp | |
| BLDG1024398 | 2023-11-09 | General construction | 200 LAKE ST W | Finish shell #497 to new coffee shop certificate of occupancy required: yes special inspections required: no const type: 1-B occupancy: B 2020 MSBC sp | |
| BLDG1024034 | 2023-11-09 | General construction | 200 LAKE ST W | Finish shell #303 to new coffee shop. certificate of occupancy required: yes special inspections required: no const type: 1-B occupancy: B 2020 MSBC s | |
| BLDG1023777 | 2023-11-09 | General construction | 2910 PILLSBURY AVE #142 | (DMH-ProjectDox) BUILD-OUT FOR SMALL COFFEE SHOP IN EXISTING FINISHED TENANT SPACE SUITE #142. STORE/ SHOP FINISHES. ARCHITECT OF RECORD: BRIAN HOUWMAN, #22604 TENANT: | |
| BLDG1011149 | 2023-09-15 | General construction | 815 CEDAR AVE S | phase 1 remodel suite E for grocery store and deli. bathrooms and rough-in plumbing included on phase 1. 12/01/23: ADDITIONAL PERMITS REQUIRED FOR OCCUPANCY (sza) 12/01/23: cer | |
| BLDG1002074 | 2023-07-26 | General construction | 815 CEDAR AVE S #B | Suite B - Interior TI for new cafe/kitchen user certificate of occupancy required: yes (first ISSUED improvement of shell space - 966730 never paid fees) Mechanical, electric | |
| BLDG989732 | 2023-04-27 | General construction | 2910 PILLSBURY AVE | TENANT IMPROVEMENT FOR NEW COMMERCIAL KITCHEN WITH NO SEATINGS IN SUITE #77 OF EXISTING KARMEL PLAZA COMMERCIAL BUILDING. AAJ (PROJECT DOX PLAN AND DOCUMENTS) certificate of oc | |
| BLDG984367 | 2023-04-13 | General construction | 2910 PILLSBURY AVE | TENANT IMPROVEMENT FOR NEW COMMERCIAL KITCHEN WITH NO SEATING IN SUITE #76 OF EXISTING KARMEL PLAZA COMMERCIAL BUILDING. AAJ (PROJECT DOX PLANS AND DOCUMENTS) certificate of occ | |
| BLDG972408 | 2023-03-28 | General construction | 2937 PLEASANT AVE | construct 6 story office and retail building. CERTIFICATE OF OCCUPANCY REQUIRED CONST TYPE: 1a NUMBER OF STORIES: 6 OCCUPANCY: M, B, A3 2020 MSBC SPRINKLERED: | |
| BLDG873169 | 2021-10-15 | General construction | 2910 PILLSBURY AVE | Four-story addition to SE corner of the building and remodel and change occupancy of the existing 4-story parking ramp. 2nd and 3rd floors of parking converted to enclosed unheate |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
