COMPANY RECORD · MINNEAPOLIS, MN

Davis Mechanical Systems, Inc. — permit history in Minneapolis, MN

Davis Mechanical Systems, Inc. appears on 106 Minneapolis permit records from 2017 through 2026, most often mechanical / hvac (63.2% of the record).

Permit categories

CategoryPermitsShare
Mechanical / HVAC6763.2%
Plumbing3936.8%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20178
20181
20192
202016
202114
20225
202311
202412
202520
202617

Busiest year on record: 2025, with 20 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
1010 CURRIE AVE W2026-08-18
3333 PENN AVE N2026-08-12
1235 YALE PL2026-07-22
1501 HENNEPIN AVE2026-07-09
1914 WASHINGTON AVE N2026-06-22
560 6TH AVE N2026-05-04
3100 28TH ST E2026-04-01
5025 BRYANT AVE N2026-03-30
1098 ANDERSEN LN2026-03-27
3416 4TH AVE S2026-03-25
2250 GARFIELD ST NE2026-03-25
300 6TH ST S2026-03-25
1604 LAKE ST E2026-02-24
3131 19TH AVE S2026-02-20

65 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

106 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BLDG11867322026-08-18Plumbing1010 CURRIE AVE WScope includes kitchen and bathroom remodeling. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pip
BLDG11947252026-08-12Mechanical / HVAC3333 PENN AVE NReplace freezer and cooler evaporator
BLDG11896182026-07-22Mechanical / HVAC1235 YALE PLReplacement of snow melt piping for the driveway.
BLDG11879632026-07-09Plumbing1501 HENNEPIN AVEPlumbing Remodel
BLDG11851372026-06-22Plumbing1914 WASHINGTON AVE NWe are doing the water portion for the weed plant system on this project. There is a RO system that feeds the plants, condensate for AC units.
BLDG11743742026-05-04Mechanical / HVAC560 6TH AVE Ngas piping to generator
BLDG11679212026-04-01Mechanical / HVAC3100 28TH ST E3 million BTU Boiler Tie into the gas & H20 Mains. BLDG1167921
BLDG11680432026-03-30Mechanical / HVAC5025 BRYANT AVE N2,800,000 summer-time use boiler. Tie into existing gas and existing heating pipes.
BLDG11680382026-03-27Mechanical / HVAC1098 ANDERSEN LNBoiler replacement per approved plan.
BLDG11680402026-03-25Mechanical / HVAC3416 4TH AVE SBoiler replacement per approved plan.
BLDG11680422026-03-25Mechanical / HVAC2250 GARFIELD ST NEBoiler replacement per approved plan.
BLDG11678582026-03-25Plumbing300 6TH ST SScope includes adding 12 lavs and toilets to existing project ( BLDG1108635). All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC),
BLDG11660202026-02-24Mechanical / HVAC1604 LAKE ST EDemo Finn Tube
BLDG11650042026-02-20Mechanical / HVAC3131 19TH AVE SPlumbing/Hydronics for piping renovation
BLDG11650082026-02-20Plumbing3131 19TH AVE SPlumbing/Hydronics for piping renovation
BLDG11649082026-02-12Mechanical / HVAC1601 50TH ST WReplace condenser, evaporator, piping in cooler
BLDG11537532026-01-20Mechanical / HVAC511 11TH AVE SRelocate 2 Liebert A/C systems. Up flow type. Work to include demo of piping and ducts as well as providing new ducts and piping to complete the installation. Duct work review und
BLDG11473402025-10-10Plumbing300 6TH ST SHC Self help/floor drain, lav, water closet,sinks
BLDG11466072025-10-08Mechanical / HVAC501 8TH ST SDaikin RTU 1 replace compressors P1 and P4. (P1 compressor is shorted to ground and P4 is a mechanical failure)
BLDG11443952025-09-24Mechanical / HVAC53 GLENWOOD AVEReplace 3 boilers w/ new boilers
BLDG11161212025-06-24Mechanical / HVAC256 UPTON AVE SSource Information is Not Available. Source Data Does Not Meet Reporting Standards. Please Review and Correct Source.
BLDG11246292025-06-17Mechanical / HVAC1201 UNIVERSITY AVE NE750000 BTU BOILER TIE-IN TO EXTG GAS & H20 MAINS
BLDG11246272025-06-17Mechanical / HVAC2600 44TH AVE N2M MBH BTU BOILER TIE-IN TO EXTG GAS & H20 MAINS
BLDG11246282025-06-17Mechanical / HVAC415 4TH AVE SE2M MBH BTU BOILER TIE-IN TO EXTG GAS & H20 MAINS
BLDG11246242025-06-17Mechanical / HVAC1800 34TH AVE NE2M MBH BTU BOILER TIE-IN TO EXTG GAS & H20 MAINS
BLDG11167352025-05-13Plumbing700 22ND AVE NEEdison CTE/Plumbing/Hydronics/HVAC for Renovation
BLDG11082992025-05-08Plumbing700 22ND AVE NEScope of the project includes level 1 plumbing remodel. Adding 33 new plumbing fixtures including 4 kitchen sinks All plumbing shall be installed in accordance with the 2020 Mi
BLDG11130722025-05-05Plumbing1421 YALE PLScope of the project includes switch out of of 32 existing bathtubs for new showers showers with 2" waste and new shower valves. All plumbing shall be installed in accordance
BLDG11086352025-04-22Plumbing300 6TH ST SThe scope of this project includes the installation of bathroom fixtures and stainless sinks in remodeled areas. All plumbing shall be installed in accordance with the 2020 Minn
BLDG11058792025-04-10Mechanical / HVAC521 15TH AVE SEBLDG1105879 Ducting for generator will be completed by SR.
BLDG11082852025-03-04Mechanical / HVAC5025 KNOX AVE Semailed applicant for confirmation of scope - 2025-03-03 - lea replacement RTU Review Note: Unless technically unfeasible, new and replacement rooftop equipment shall be
BLDG11083022025-03-04Mechanical / HVAC700 22ND AVE NEHot water piping per approved plans.
BLDG11071462025-02-27Mechanical / HVAC5025 BRYANT AVE NSource Information is Not Available. Source Data Does Not Meet Reporting Standards. Please Review and Correct Source.
BLDG11039582025-02-27Mechanical / HVAC5517 LYNDALE AVE SInstalling 3 tons split ductless unit for elevator mechanical room.
BLDG11071992025-02-27Mechanical / HVAC2410 GIRARD AVE NREPLACEMENT COOLER 6.4.5 Walk-InCoolers and Walk-In Freezers Site-assembled or site-constructed walk-in coolers and walk-in freezers shall conform to the followi
BLDG11043812025-01-30Plumbing400 4TH ST Smpls grain exchange breakroom sink
BLDG11024082025-01-09Plumbing350 5TH ST STie 3 into main stack, Run roughly 80 of 3 cast iron drain pipe to a new floor drain. 2 vent above tied into existing vent.
BLDG10905702024-10-24Plumbing300 6TH ST SRemodel of existing space. Adding 1 sink, drain, waste, vent, and water piping for new sink
BLDG10885992024-10-17Mechanical / HVAC1098 ANDERSEN LNAdditional plan sheets related to mechanical piping are the roof and detail plan sheets and can be accessed from for-reference folder. BLDG1088599
BLDG10882332024-10-10Plumbing1098 ANDERSEN LNAndersen middle school adding sinks, hose bibs and drinking fountain
BLDG10861662024-09-26Plumbing560 6TH AVE N
BLDG10646702024-07-01Mechanical / HVAC521 15TH AVE SE(2) boilers of 350 mbh for snowmelt system
BLDG10657932024-06-28Mechanical / HVAC5517 LYNDALE AVE SREPLACEMENT LOW PRESSURE STEAM FOR HOT WATER STORAGE TANK - Steam Only, Water tank under separate plumbing permit.
BLDG10657892024-06-13Plumbing5517 LYNDALE AVE SMT OLIVET CARE HOME - hot water storage tank and mixing valve
BLDG10593622024-05-13Plumbing11 4TH ST S #RAMPRepair/replace cracked cast iron pipe and area drains in parking ramp
BLDG10534492024-04-26Plumbing1500 JAMES AVE NNorth High School/remodel bathrooms and kitchen
BLDG10549482024-04-18Plumbing300 6TH ST SFOR TOWER A/FLOORS 11 THRU 14 - Adding (6) new plumbing fixtures to existing systems
BLDG10509802024-03-25Plumbing517 MARQUETTE AVEReplace cracked cast iron pipe in parking ramp
BLDG10439842024-02-22Mechanical / HVAC4225 3RD AVE SGas piping for rooftop units per approved plans.
BLDG10308252023-11-13Mechanical / HVAC1200 WASHINGTON AVE NREPLACE A/C UNITS

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →