COMPANY RECORD · MINNEAPOLIS, MN
Castle Building & Remodeling Inc — permit history in Minneapolis, MN
Castle Building & Remodeling Inc appears on 306 Minneapolis permit records from 2016 through 2026, most often general construction (99.7% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 305 | 99.7% |
| Mechanical / HVAC | 1 | 0.33% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2016 | 2 |
| 2017 | 39 |
| 2018 | 27 |
| 2019 | 38 |
| 2020 | 25 |
| 2021 | 36 |
| 2022 | 31 |
| 2023 | 28 |
| 2024 | 37 |
| 2025 | 28 |
| 2026 | 15 |
Busiest year on record: 2017, with 39 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 3520 34TH AVE S | 2026-08-27 |
| 5528 RICHMOND CV | 2026-07-31 |
| 400 GROVELAND AVE #1607 | 2026-07-17 |
| 2506 VINCENT AVE N | 2026-05-28 |
| 5321 30TH AVE S | 2026-05-18 |
| 3649 15TH AVE S | 2026-05-14 |
| 5624 PILLSBURY AVE | 2026-05-05 |
| 2843 BRIGHTON AVE NE | 2026-04-01 |
| 1926 BENJAMIN ST NE | 2026-02-13 |
| 5617 GRAND AVE S | 2026-01-29 |
| 5605 HARRIET AVE | 2026-01-29 |
| 2519 BENJAMIN ST NE | 2026-01-27 |
| 4141 COFFMAN LN | 2026-01-09 |
| 3915 GRAND AVE S # | 2026-01-05 |
273 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
306 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDG1197299 | 2026-08-27 | General construction | 3520 34TH AVE S | Main level bathroom remodel. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, A | |
| BLDG1188612 | 2026-07-31 | General construction | 5528 RICHMOND CV | CONVERT EXISTING TUCKED UNDER GARAGE INTO NEW MUDROOM AND OFFICE IN EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS). DEMOLITION WORK: - REMOVE OVERHEAD GARAGE DOOR, OP | |
| BLDG1188494 | 2026-07-17 | General construction | 400 GROVELAND AVE #1607 | REMODEL SEVERAL AREAS INCLUDING BATHROOM, UNIT 1607 2020 MSBC | |
| BLDG1178913 | 2026-05-28 | General construction | 2506 VINCENT AVE N | Remodel main floor and lower level bathrooms Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 Windows installed under this permit shall meet t | |
| BLDG1179330 | 2026-05-18 | General construction | 5321 30TH AVE S | MAIN FLOOR REMODEL OF EXISTING SEWING AND STUDY ROOM IN EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS) DEMOLITION WORK: - GUT EXISTING SEWING ROOM AND STUDY ROOM TO STU | |
| BLDG1178484 | 2026-05-14 | General construction | 3649 15TH AVE S | (DMH-Pdox) REMODEL REAR PORCH/ PIANO ROOM WITH NEW WINDOWS & DOORS IN ALTERED OPENINGS IN SFD. NEW WALL AND CEILING FINISHES. NEW EXTERIOR PAVER LANDING & STEPS. LESS THAN 30" | |
| BLDG1174230 | 2026-05-05 | General construction | 5624 PILLSBURY AVE | (DMH-Pdox) MINOR FRAMING AND FINISH FOR BASEMENT FAMILY ROOM IN SFD. NOT REVIEWED OR APPROVED FOR ANY SLEEPING ROOMS. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTI | |
| BLDG1170859 | 2026-04-01 | General construction | 2843 BRIGHTON AVE NE | Removal and Replacement of two exterior doors. No change in size or location. | |
| BLDG1166358 | 2026-03-04 | General construction | 3649 15TH AVE S | BASEMENT BATHROOM REMODEL INCLUDING REPLACING WC/LAV/SHOWER FIXTURES IN SAME LOCATIONS, NEW FINISHES. Building Code: 2020 MN RESIDENTIAL CODE/MN RULES CH 1309 (2018 IRC) Ene | |
| BLDG1163916 | 2026-02-13 | General construction | 1926 BENJAMIN ST NE | REPLACE COLUMN IN BASEMENT AND ADD FOOTING. (JJL) ENGINEER: CRITERIUM ENGINEERS - STEVEN C EBERLY - #24073 Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RUL | |
| BLDG1162608 | 2026-01-29 | General construction | 5617 GRAND AVE S | MAIN FLOOR BATHROOM REMODEL - GUT TO STUDS, REPLACE FIXTURES IN SAME LOCATIONS, INSULATE EXTERIOR WALL, INSTALL BACKER AND TILE AT TUB/SHOWER SURROUND, INSTALL NEW BATH FAN. EX | |
| BLDG1162541 | 2026-01-29 | General construction | 5605 HARRIET AVE | REMODEL BATHROOM Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CO | |
| BLDG1162517 | 2026-01-27 | General construction | 2519 BENJAMIN ST NE | (DMH-Pdox) INSTALL NEW DOUBLE DOOR IN PARTITION WALL OF SFD BETWEEN BEDROOM AND LIVING ROOM. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. APP | |
| BLDG1158436 | 2026-01-09 | General construction | 4141 COFFMAN LN | BASEMENT REMODEL (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/ | |
| BLDG1159220 | 2026-01-05 | General construction | 3915 GRAND AVE S # | Shell addition for future Kitchen/mudroom (MAA) ENGR - DEREK O PHILLIPS 47507 Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PER | |
| BLDG1155843 | 2025-12-23 | General construction | 4705 ABBOTT AVE S | BASEMENT FLOOR BATHROOM, PLAYROOM AND OFFICE/ DEN ROOM REMODEL WORK OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS) DEMOLITION WORK: - REMOVE EXISTING BATHROOM FIXTU | |
| BLDG1156052 | 2025-12-18 | General construction | 5620 BLOOMINGTON AVE | (DMH-Pdox) MINOR DEMO AND REMODEL TO REMOVE ARCH & SOFFIT IN KITCHEN OF SFD. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. APPLICANT IS REQUIR | |
| BLDG1155627 | 2025-12-08 | General construction | 2641 JOHNSON ST NE | CONVERT MAIN FLOOR TO 1/2 BATHROOM FROM 3/4 BATHROOM IN EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLAN) DEMOLITION WORK: - INTERIOR DEMOLITION WORK OF EXISTING BATHROOM, | |
| BLDG1153640 | 2025-11-21 | General construction | 4912 GARFIELD AVE | 2ND FLOOR MASTER BATHROOM WITH CLOSET AREA REMODEL OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS). - INTERIOR DEMOLITION WORK OF EXISTING MASTER BATHROOM WITH CLOSET | |
| BLDG1143261 | 2025-11-07 | General construction | 5029 THOMAS AVE S | BATHROOM REMODEL IN EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS) - INTERIOR DEMOLITION WORK TO EXCLUDE EXTERIOR WALL AND EXISTING CAST IRON TUB WITH SURROUNDS TO ALLOW | |
| BLDG1143334 | 2025-11-04 | General construction | 4821 WOODLAWN BLVD | Remodel 2nd floor, full bathroom -ACW SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. THIS WORK MUST BE COMPLETED BY A | |
| BLDG1150027 | 2025-10-30 | General construction | 5740 11TH AVE S | SHOWER, BATHROOM REMODEL. (JJL) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AN | |
| BLDG1146117 | 2025-10-06 | General construction | 3319 PIERCE ST NE | (DMH-Pdox) MAIN FLOOR BATHROOM REMODEL IN SFD. REPLACE FIXTURES IN SAME LOCATIONS. REPLACE WINDOW WITH TEMPERED. INSTALL INSULATION AND VAPOR BARRIER AT EXTEROR CONDITIONS. | |
| BLDG1136429 | 2025-08-15 | General construction | 5516 11TH AVE S | (DMH-Pdox) PARTITION FRAMING AND FINISH FOR NEW BASEMENT 1/2 BATH AND CLOSET SPACE IN SFD. REMODEL 3/4 MASTER BATHROOM. REPLACE FIXTURES IN SAME LOCATION. KITCHEN REMODEL. | |
| BLDG1130147 | 2025-07-23 | General construction | 3426 GRAND AVE S | (DMH-Pdox) KITCHEN REMODEL IN SFD. MODIFY EXISTING WINDOW AND INSTALL NEW LOCATION. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. APPLICANT | |
| BLDG1116351 | 2025-07-22 | General construction | 814 26TH AVE NE | (DMH-Pdox) RECONSTRUCT 8'X6' S.E CORNER FOUNDATION WITH NEW WOOD FOUNDATION TO 48" BELOW GRADE. ENGINEER: PHILLIPS, #47507 (SAFEHAVEN) APPROVED PLANS AND PERMIT MUST BE ON SIT | |
| BLDG1130151 | 2025-07-15 | General construction | 4104 COLFAX AVE S | BASEMENT FLOOR FINISHED AS WELL AS MAIN AND UPPER FLOOR REMODEL OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS). DEMOLITION WORK: - REMOVAL OF SECTION OF EXISTING CO | |
| BLDG1124398 | 2025-07-02 | General construction | 2822 ULYSSES ST NE | Remove chimney in attic/main floor to basement | Bathroom remodel | Replace window Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 Windows ins | |
| BLDG1124787 | 2025-06-18 | General construction | 3217 33RD AVE S | BATHROOM REMODEL. DEMO EXTERIOR PORTICO AND REPLACE. NO STRUCTURAL WORK. EXISTING BATHTUB AND WINDOW TO REMAIN. (JJL) Building Code: 2020 MNSBC/2018 IRC Energy Code: MIN | |
| BLDG1123498 | 2025-06-13 | General construction | 1500 26TH AVE NE | remove and replace rear entry door. | |
| BLDG1120148 | 2025-06-09 | General construction | 4844 GARFIELD AVE | (DMH-Pdox) DEMO EXISTING AND REMODEL 3RD FLOOR BATHROOM IN SFD. - 2020 MNSBC EXISTING SKYLIGHTS AND TEMPERED WINDOW. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECT | |
| BLDG1113292 | 2025-04-29 | General construction | 3838 20TH AVE S | (DMH-ProjectDox) FRAME AND FINISH FOR NEW 2ND LEVEL 3/4 BATHROOM IN SFD. TEMPERED WINDOW . INSTALL INSULATION AND VAPOR BARRIER ATEXTEROR CONDITIONS. INSTALL FIBER-CEMENT | |
| BLDG1113627 | 2025-04-24 | General construction | 525 3RD ST N #113 | (DMH-ProjectDox) KITCHEN REMODEL IN CONDO UNIT 113. METAL FRAMING AROUND EXISTING GAS FIREPLACE. IN MULTI-UNIT BUILDINGS, COMMON PARTY WALLS MUST USE SAME OR EQUIVALENT MATER | |
| BLDG1112860 | 2025-04-11 | General construction | 3622 3RD ST NE | OPEN WALL BETWEEN DINING ROOM & LIVING ROOM (MAA) ENGR - DEREK O PHILIPS 47507 Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMI | |
| BLDG1105454 | 2025-04-10 | General construction | 3308 37TH AVE S | MUDROOM ADDITION+KITCHEN REMODELING (MAA) RNGR OF RECORD: DEREK PHILPS 47507 - SAFE HAVEN Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 | |
| BLDG1108526 | 2025-03-11 | General construction | 3715 22ND AVE S | 4 windows upper level, full frame replacements (MAA) | |
| BLDG1105730 | 2025-03-11 | General construction | 5616 COLFAX AVE S | REMODEL UPPER STORY Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR | |
| BLDG1108289 | 2025-03-10 | General construction | 5528 CUMBERLAND RD | REMODEL BATHROOM Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CO | |
| BLDG1107983 | 2025-03-04 | General construction | 3403 28TH ST W | remodel loft. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIO | |
| BLDG1106487 | 2025-02-20 | General construction | 4631 RUSSELL AVE N | (DMH - ProjectDox) CONSTRUCT 10' X 10' TREATED WOOD DECK AT REAR YARD OF SFD WITH NEW ACCESSIBLE WOOD RAMP TO DETACHED GARAGE. 2X10 WOOD FRAMING, 4X4 WOOD POSTS AND 5 TOTAL FOO | |
| BLDG1106298 | 2025-02-18 | General construction | 2929 PIERCE ST NE | kitchen remodel. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDI | |
| BLDG1101994 | 2025-01-24 | General construction | 3227 41ST AVE S | remodel finished attic and main floor bathroom (MAA) ************ATTIC IS NOT APPROVED FOR SLEEPING PURPOSES*************** Building Code: 2020 MNSBC/2018 IRC Energy Code: | |
| BLDG1101939 | 2025-01-07 | General construction | 5240 YORK AVE S | PARTIAL BATHROOM REMODEL (MAA) SOUND/FIRE TEST ASSEMBLY____________ SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. | |
| BLDG1099213 | 2024-12-17 | General construction | 1115 WEST MINNEHAHA PKWY | remodel front entry, living room, first floor bathroom, and 2nd floor bathroom/master bedroom. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 | |
| BLDG1091439 | 2024-11-15 | General construction | 3912 23RD AVE S | BATHROOM REMODEL. (JJL) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATIN | |
| BLDG1088022 | 2024-10-22 | General construction | 5441 3RD AVE S | DEMO CLOSETS, BUILD NEW WALK IN CLOSET, NEW ELECTRICAL AND FLOORING. NO STRUCTURAL WORK. (JJL) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 132 | |
| BLDG1088029 | 2024-10-22 | General construction | 4133 MORRILL LN | BASEMENT REMODEL. BATHROOM, FIREPLACE. (JJL) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL | |
| BLDG1085836 | 2024-10-03 | General construction | 635 5TH ST NE | (DMH-ProjectDox) REMODEL TO SFD FROM WATER DAMAGES INCLUDING, KITCHEN, MAIN FLOOR & 2ND FLOOR BATHROOMS, AND OTHER ROOMS. INSTALL INSULATIONAND VAPOR BARRIER AT EXTEROR CONDITI | |
| BLDG1079425 | 2024-09-10 | General construction | 5649 HARRIET AVE | KITCHEN REMODEL OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS). - GUT EXISTING KITCHEN TO STUDS TO INCLUDE REMOVAL OF CEILING TO ALLOW FOR NEW RENOVATION WORK TO BE | |
| BLDG1081878 | 2024-09-09 | General construction | 4617 GARFIELD AVE | bathroom remodel. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR COND |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
