COMPANY RECORD · MINNEAPOLIS, MN
Branson Builders And Contractors Inc — permit history in Minneapolis, MN
Branson Builders And Contractors Inc appears on 60 Minneapolis permit records from 2017 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 60 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2017 | 7 |
| 2018 | 2 |
| 2019 | 10 |
| 2020 | 3 |
| 2021 | 7 |
| 2022 | 8 |
| 2023 | 2 |
| 2024 | 7 |
| 2025 | 7 |
| 2026 | 7 |
Busiest year on record: 2019, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 222 2ND ST SE #1501 | 2026-08-05 |
| 100 2ND ST SE #702 | 2026-06-03 |
| 618 WASHINGTON AVE N #307 | 2026-06-03 |
| 700 2ND ST S #W41 | 2026-04-30 |
| 222 2ND ST SE #1004 | 2026-02-05 |
| 700 2ND ST S #W81 | 2026-01-09 |
| 700 2ND ST S #W20 | 2026-01-08 |
| 222 2ND ST SE #1103 | 2025-12-18 |
| 222 2ND ST SE #1602 | 2025-12-03 |
| 100 3RD AVE S #3202 | 2025-10-17 |
| 700 2ND ST S #W40 | 2025-07-29 |
| 216 2ND ST NE | 2025-05-23 |
| 222 2ND ST SE #1504 | 2024-08-15 |
| 205 PARK AVE | 2024-06-14 |
48 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
60 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDG1188235 | 2026-08-05 | General construction | 222 2ND ST SE #1501 | Converting existing large primary bath to smaller primary bath and adding a new closet (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 | |
| BLDG1179617 | 2026-06-03 | General construction | 100 2ND ST SE #702 | Remodel 2 bathrooms -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC windows with sill heights less than 36 inches above the f | |
| BLDG1179622 | 2026-06-03 | General construction | 618 WASHINGTON AVE N #307 | (DMH-Pdox) BATHROOM REMODEL IN CONDO UNIT #307. FIXTURES STAY IN SAME LOCATIONS. INSTALLING ACOUSTICAL MATTING. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS AT BATHTUB/S | |
| BLDG1166973 | 2026-04-30 | General construction | 700 2ND ST S #W41 | REMODEL DWELLING UNIT 2020 MSBC architect: 26943 - Mellblom, Paul C. N. | |
| BLDG1163810 | 2026-02-05 | General construction | 222 2ND ST SE #1004 | UNIT #1004 PRIMARY BATHROOM REMODEL. NO STRUCTURAL WORK. (JJL) | |
| BLDG1160898 | 2026-01-09 | General construction | 700 2ND ST S #W81 | (DMH-Pdox) DEMO AND REMODEL TO EXISTING CONDO UNIT #W81 INCLUDING KITCHEN, BATHRM AND M/E/P. INSTALL ACOUSTICAL FLOOR MATTING FOR SOUND CONTROL. IN MULTI-UNIT BUILDINGS, COMMO | |
| BLDG1156621 | 2026-01-08 | General construction | 700 2ND ST S #W20 | New primary bedroom and fitness room walls. All new finishes in unit -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC windows w | |
| BLDG1156227 | 2025-12-18 | General construction | 222 2ND ST SE #1103 | Unit 1103 - Primary Bathroom Remodel occupancy: R-2 2020 MSBC WALLS SEPARATING DWELLING UNITS IN THE SAME BUILDING, AND WALLS SEPARATING DWELLING UNITS FROM OTHER OCCUPANC | |
| BLDG1153357 | 2025-12-03 | General construction | 222 2ND ST SE #1602 | interior remodeling of unit 1602. mainly cabinetry, finishes and fixtures. | |
| BLDG1147846 | 2025-11-20 | General construction | 700 2ND ST S #W81 | exterior alteration to unit W81 for new kitchen hood. | |
| BLDG1146692 | 2025-10-17 | General construction | 100 3RD AVE S #3202 | Modifications to condo unit in existing building including ceilings/lights/soffits, kitchen cabinets, removal of wall -ACW certificate of occupancy required: no special insp | |
| BLDG1133098 | 2025-07-29 | General construction | 700 2ND ST S #W40 | REMODEL TWO BATHROOMS, UTILITY ROOM AND KITCHEN AREA AS WELL AS REFINISH EXISTING WOOD FLOORS IN CONDOMINUM UNIT # W40 OF MIXED-USED COMMERCIAL/ RESIDENTIAL BUILDING. AAJ (PROJECT | |
| BLDG1131280 | 2025-07-24 | General construction | 618 WASHINGTON AVE N #307 | Replace 4 existing patio doors -ACW certificate of occupancy required: no special inspections required: no occupancy: R-2 2020 MSBC windows with sill h | |
| BLDG1119558 | 2025-05-23 | General construction | 216 2ND ST NE | REMODEL EXISTING BASEMENT FLOOR BATHROOM AND LAUNDRY ROOM AS WELL AS MINOR MECHANICAL EQUIPMENT RELOCATION IN EXISTING RIVER PLACE TOWNHOUSES - UNIT #216. AAJ (PROJECT DOX PLAN). | |
| BLDG1092131 | 2024-11-07 | General construction | 618 WASHINGTON AVE N #307 | install pocket door between 307 and 308. | |
| BLDG1077144 | 2024-08-15 | General construction | 222 2ND ST SE #1504 | (DMH-ProjectDox) REMODEL MASTER BATHROOM, GUEST BATHROOM AND POWDER ROOM IN CONDO UNIT #1504. FIXTURES REMAIN IN SAME LOCATIONS. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BA | |
| BLDG1064015 | 2024-06-14 | General construction | 205 PARK AVE | Finish "void" space above bathroom. We will add one additional fire sprinkler, electrical, and wall finish - Townhouse Unit 102 WALLS SEPARATING DWELLING UNITS IN THE SAME BUILDIN | |
| BLDG1056258 | 2024-05-10 | General construction | 100 2ND ST SE #702 | (DMH-ProjectDox) KITCHEN REMODEL IN CONDO UNIT #702. OPEN COMMON WALLS FOR NEW P/ E/ M AND FIXTURES IN REVISED LOCATIONS. REPLACE COMMON PARTY WALLS WITH 5/8" 'X' OR 'C' DRYW | |
| BLDG1035484 | 2024-02-23 | General construction | 700 2ND ST S #W100 | Install a Pizza Oven on Existing Patio Unit W 100 | |
| BLDG1033645 | 2024-02-01 | General construction | 700 2ND ST S #W100 | Add fire door to separate elevator from unit space - Unit W100 - addition to permit BLDG979800 WALLS SEPARATING DWELLING UNITS IN THE SAME BUILDING, AND WALLS SEPARATING DWELLI | |
| BLDG1040095 | 2024-01-26 | General construction | 110 BANK ST #L2102 | (DMH-ProjectDox) BATHROOM REMODEL IN UNIT #2102. REPLACE FIXTURES IN SAME LOCATIONS. CEMENT, FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS SHALL BE USED AS BACKERS FOR WALL TILE | |
| BLDG989143 | 2023-04-20 | General construction | 222 2ND ST SE #501 | COMPLETE NON-STRUCTURAL REMODEL OF EXISTING KITCHEN, BATHROOMS AND LAUNDARY ROOM OF CONDOMINUM UNIT #501 OF CONDOMINUM BUILDING. AAJ (PROJECT PLANS AND DOCUMENTS). certificate o | |
| BLDG979800 | 2023-03-06 | General construction | 700 2ND ST S #W100 | Interior Remodel - Unit W100 Architect: Paul Mellblom #26943 WALLS SEPARATING DWELLING UNITS IN THE SAME BUILDING, AND WALLS SEPARATING DWELLING UNITS FROM OTHER OCCUPANCIES CO | |
| BLDG974372 | 2022-12-16 | General construction | 222 2ND ST SE #1504 | (DMH-ProjectDox) KITCHEN REMODEL IN CONDO UNIT #1504. MINOR FRAMING AND DRYWALL AT EXISTING WALLS FOR NEW CABINTRY. NO RECONFIGURATION. NO DISRUPTION TO FIRE/ SOUND SEPAR | |
| BLDG961112 | 2022-09-30 | General construction | 110 BANK ST #L2104 | Interior Remodel - Unit L2104 WALLS SEPARATING DWELLING UNITS IN THE SAME BUILDING, AND WALLS SEPARATING DWELLING UNITS FROM OTHER OCCUPANCIES CONTIGUOUS TO THEM IN THE SAME BUILD | |
| BLDG956805 | 2022-09-01 | General construction | 222 2ND ST SE #1202 | certificate of occupancy required: no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections requ | |
| BLDG952707 | 2022-07-15 | General construction | 222 2ND ST SE #1003 | remodel of condo unit #1003. | |
| BLDG939910 | 2022-05-06 | General construction | 110 BANK ST #L1505 | interior remodeling of unit L1505. | |
| BLDG938636 | 2022-04-29 | General construction | 600 2ND ST S #S601 | REPLACE ALL WINDOWS AND EXTR. DOOR #S601 Condo Prop ID: 2302924340212 No drawings provided for review and approval. The applicant is responsible for code compliance including bu | |
| BLDG914360 | 2022-02-24 | General construction | 600 2ND ST S #306 | REMODEL BATHROOM - UNIT 306 - RECONFIGURATION OF FIXTURES ----- NEW SOUND MAT UNDER FLOORING ----- ----- Issuance of this permit doesn't allow a violation of Building Code o | |
| BLDG914421 | 2022-02-24 | General construction | 600 2ND ST S #S102 | complete interior remodel of unit 102. | |
| BLDG914183 | 2021-12-28 | General construction | 117 PORTLAND AVE #404 | INTERIOR REMODEL AT UNIT 404 (MAA) architect: PAUL MELLBLOM 26943 engineer: JOSHUA HERZOG 42392 windows with sill heights less than 36 inches above the floor shall b | |
| BLDG881717 | 2021-05-18 | General construction | 215 10TH AVE S #736 | Remodel Kitchen & Master Bath - Unit 736 WALLS SEPARATING DWELLING UNITS IN THE SAME BUILDING, AND WALLS SEPARATING DWELLING UNITS FROM OTHER OCCUPANCIES CONTIGUOUS TO THEM IN THE | |
| BLDG881656 | 2021-05-06 | General construction | 600 2ND ST S #S201 | NON-STRUCTURAL REMODEL OF MASTER BATHROOM AND MASTER CLOSET AT UNIT #S201. NEW FIXTURES IN NEW LOCATIONS, NEW CABINETRY AT VANITY AND CLOSET, REPLACE TILE FLOORING - INSTALL GENIE | |
| BLDG877135 | 2021-04-06 | General construction | 600 2ND ST S #S108 | Remodel Kitchen, Powder Room, and 1st Floor Office space in Unit 108 Property ID 23-029-24-34-0190 Flooring Underlayment GenieMat RST10 tests IIC 56 over 8" conc slab. Approved | |
| BLDG878864 | 2021-04-05 | General construction | 215 10TH AVE S #504 | NEW PARTITION WALLS MAKING AN 8'X10' ROOM TO BE USED AS A "HOME OFFICE" IN AN EXISTING 2,401SF RESIDENTIAL UNIT (#504) ----- SEPERATE ELECTRICAL PERMITS FROM STATE REQUIRED FOR ELE | |
| BLDG867798 | 2021-02-02 | General construction | 700 2ND ST S #W42 | Remodeling of dwelling unit #42 noncombustible construction ARCHITECT: Paul Mellblom #26943 | |
| BLDG868402 | 2021-02-02 | General construction | 600 2ND ST S #S601 | ON-STRUCTURAL KITCHEN REMODEL TO UNIT 602 INCLUDING REMOVAL OF EXISTING WALL FINISH (sza) NEW FLOOR FINISH WITH SOUND MATT INSTALL INSULATION AND VAPOR BARRIER AT EXTERIOR WALL CO | |
| BLDG855674 | 2020-11-09 | General construction | 1201 YALE PL #2005 | Condo Remodel - Enclose Patio certificate of occupancy required: no special inspections required: no occupancy: R2 2020 MSBC sprinklered: yes Tenant: Unit 2005 | |
| BLDG844284 | 2020-08-25 | General construction | 100 2ND ST SE #1001 | Non-structural remodel for new toilet room in dwelling unit 1001. No new penetrations of floor and no modifications to rated separation walls. | |
| BLDG813799 | 2020-01-16 | General construction | 600 2ND ST S #S201 | remodel kitchen in unit 201. sck**** special inspections required: yes ***** sprinklered: yes architect: MSR windows with sill heights less than 24 inches above the f | |
| BLDG793583 | 2019-09-11 | General construction | 2036 QUEEN AVE S | REPLACING SOME EXTERIOR WINDOWS AND DOORS. NO NEW OPENINGS. NO STRUCTURAL WORK. RECONFIGURE INTERIOR LEVEL 1 FOR NEW BATHROOM AND NEW PANTRY. LEVELING FLOORS. SOME INTERIOR FI | |
| BLDG780000 | 2019-07-09 | General construction | 110 BANK ST #L2203 | remodel of unit 2203/2204. sck***** remodeled space is being used as a single unit. windows with sill heights less than 24 inches above the floor shall be equipped with fall | |
| BLDG778805 | 2019-06-11 | General construction | 222 2ND ST SE #1404 | UNIT 1404****************** finish upgrades unit # 1404. NEW HARD WOOD FLOORS, UPDATE KITCHEN, APPLIANCES, COUNTER TOPS. BATHROOM REMODEL. (JJL)************ ENKASONIC SOUND | |
| BLDG764066 | 2019-04-15 | General construction | 5249 ABBOTT AVE S | remodel basement workshop into bathroom APPROX 5 X 8 AT SFD (JAG)*** BASEMENT FINISH HANDOUT REQUIREMENTS. EXISTING FINISHED BASEMENT.*** SEPARATE PERMITS ARE REQUIRED FOR ELECTR | |
| BLDG757358 | 2019-04-09 | General construction | 222 2ND ST SE | construct 16 x 16 metal pergola on lower roof. sck | |
| BLDG755007 | 2019-03-19 | General construction | 801 WASHINGTON AVE N #302 | REPLACE EXISTING PATIO SLIDING DOORS IN EXISTING UNIT #302 OF AN APARTMENT BUILDING. AAJ#2. - REPLACE THREE SETS OF ROOF-TOP PATIO GLASS SLIDING DOORS WITH NEW METAL-CLAD SLID | |
| BLDG755006 | 2019-02-21 | General construction | 801 WASHINGTON AVE N #302 | remodel bathroom unit # 302 floor underlayment geniemat RST IIC rating 51 | |
| BLDG753037 | 2019-02-04 | General construction | 4708 VINCENT AVE S | bathroom remodel. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALARMS REQUIRED IN ACCORDANCE WITH MN. ST | |
| BLDG746344 | 2019-01-08 | General construction | 618 WASHINGTON AVE N #607 | unit # 607 kitchen/ 2 bath/laundry remodel. sck#1 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
