COMPANY RECORD · MINNEAPOLIS, MN

Bayport Roofing And Siding LLC — permit history in Minneapolis, MN

Bayport Roofing And Siding LLC appears on 517 Minneapolis permit records from 2016 through 2026, all of them general construction.

Permit categories

CategoryPermitsShare
General construction517100%

Activity by year

YearPermits issued
20167
201786
201856
201926
202054
202147
202241
202380
202459
202538
202623

Busiest year on record: 2017, with 86 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
4057 27TH AVE S2026-08-03
2655 15TH AVE S2026-07-27
2941 42ND AVE S2026-06-29
3747 RUSSELL AVE N2026-06-01
2023 HILLSIDE AVE N2026-06-01
2131 4TH ST N2026-05-28
4150 31ST AVE S2026-05-11
1515 4TH ST NE2026-04-27
2542 7TH ST NE2026-04-27
1631 VINCENT AVE N2026-04-20
4429 PORTLAND AVE2026-04-14
4107 PENN AVE N2026-04-13
3915 PENN AVE N2026-04-09
4234 RUSSELL AVE N2026-03-26

405 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

517 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BLDG11936502026-08-03General construction4057 27TH AVE SPull Roofing Permit House + Garage House = 15 SQ Garage = 5 SQ
BLDG11914152026-07-27General construction2655 15TH AVE SGarage Only, Tear off and re-roof 5.33 SQ.
BLDG11888082026-07-14General construction2655 15TH AVE S(21 SQ) Material Selection: IKO Dynasty Gray Summit SCOPE: House Roof
BLDG11866952026-06-29General construction2941 42ND AVE S(13 SQ House 9SQ Garage) SCOPE: Full House Roof (+ Detached Garage)
BLDG11823742026-06-01General construction3747 RUSSELL AVE N(13 SQ) SCOPE: Full House Siding
BLDG11823882026-06-01General construction2023 HILLSIDE AVE N26.35 SQ. Re-Siding - Vinyl
BLDG11819142026-05-28General construction2131 4TH ST N(19.72 SQ) SCOPE: Full House Roof
BLDG11798092026-05-12General construction3747 RUSSELL AVE NFull House (11.30sq. ) & Garage Re-Roof (4 sq.)
BLDG11795792026-05-11General construction4150 31ST AVE S23 Sq. Full house & Garage Re-Side
BLDG11769032026-04-27General construction1515 4TH ST NE24.67 Re-Roof
BLDG11768352026-04-27General construction2542 7TH ST NE26 Sq Full House Re-Side
BLDG11719922026-04-20General construction1631 VINCENT AVE N(DMH-Pdox) ROOF RAFTERS REPAIRS, SISTERING AND SOFFIT/OVERHANG REBUILD TO SFD. - 2020 MNSBC SEE ENGINEERED PLANS PER NATHAN PRIEVE, #46203. SEPARATE PERMIT TO BE OBTAINED FOR
BLDG11728102026-04-14General construction4429 PORTLAND AVE(24 SQ) SCOPE: Full House Roof (Not doing attached garage)
BLDG11724332026-04-13General construction4107 PENN AVE NPP: 9/12 (12 SQ) Material Selection: IKO Cambridge Charcoal SCOPE: Full House Roof
BLDG11717852026-04-09General construction3915 PENN AVE N(9 SQ) Material Selection: IKO Dynasty Monoco Red SCOPE: Full House Roof Drip Edge only if Approved Retail for Roofline & Fascia work as needed
BLDG11718992026-04-09General construction1631 VINCENT AVE NPP: 6/12 (28 SQ with 13% Waste Material Selection: TBD SCOPE: Full House Roof & Garage ***We submitted a building permit on April 9, 2026, for the framing and structural repai
BLDG11700902026-03-26General construction2542 7TH ST NEPP: 10/12 (31 SQ) Material Selection: IKO Dynasty Granite Black SCOPE: Full House Roof
BLDG11700582026-03-26General construction4234 RUSSELL AVE NPP: 10/12 (20 SQ) Material Selection: IKO Dynasty Emerald Green, Beaver Brown Metals SCOPE: Full House Roof
BLDG11700612026-03-26General construction4454 LONGFELLOW AVE(19 SQ) Material Selection: IKO Dynasty Atlantic Blue SCOPE: Full House Roof
BLDG11700782026-03-26General construction1916 WILLOW AVE N(21 SQ) Material Selection: TBD SCOPE: Full House
BLDG11700962026-03-26General construction947 18 1/2 AVE NE(14 SQ) Material Selection: TDB SCOPE: Full House Siding + Parts of Shed
BLDG11673182026-03-05General construction2655 15TH AVE S(24.5 SQ) Material Selection: Provia Hearttech D4 Antique White SCOPE: Full House Siding
BLDG11616332026-01-15General construction4504 43RD AVE SRemove and replace vinyl siding
BLDG11549002025-12-08General construction1301 24TH ST ERemove existing roofing. Install new shingle roof system complete with required underlayment, flashing and trim.
BLDG11548222025-11-24General construction5601 39TH AVE S(11.79 SQ) Material Selection: IKO Dynasty Galcier SCOPE: Full House Roof
BLDG11535232025-11-13General construction5601 39TH AVE SHouse + Garage Re-Side. 8.22 Sq House & 7.35 Garage Vinyl Siding
BLDG11529572025-11-10General construction4107 PENN AVE N17 SQ. With Waste - Provia - Hearttech D5 Vinyl Siding
BLDG11530702025-11-10General construction3629 4TH AVE S(16 SQ) Material Selection: Provia Hearttech 4 DL Sage SCOPE: Full House Siding
BLDG11526612025-11-06General construction2369 JAMES AVE NPP: 12/12 (18.5 SQ) Material Selection: IKO Dynasty Atlantic Blue SCOPE: Full House Roof Homeowner ACVing Garage Roof
BLDG11526302025-11-06General construction4504 43RD AVE S17.33 IKO Dynasty Re-Roof (Ahspalth Shigles)
BLDG11501162025-10-23General construction2658 UPTON AVE NTear off & ReRoof 14 SQ Asphalt Roof
BLDG11484182025-10-13General construction4910 THOMAS AVE N(8.5 SQ) Material Selection: Provia Heartech D5 Dutchlap - SeaSlate SCOPE: Full House Siding (+ Detached Garage)
BLDG11465842025-10-02General construction4910 THOMAS AVE NPP: 5/12 13 SQ. Material Selection: IKO Dynasty Granite Black SCOPE: Full House Roof (+ Detached Garage)
BLDG11465732025-10-02General construction731 BUCHANAN ST NE15 SQ. w/waste. Material Selection: TBD SCOPE: (9sq) Full House Siding + (5sq) Detached Garage) All Fascia is being completed (Insurance & retail)
BLDG11462482025-09-30General construction1916 WILLOW AVE N(21 SQ) Material Selection: IKO Dynasty Frostone SCOPE: Full House Roof
BLDG11462442025-09-30General construction2327 THOMAS AVE N(15 SQ House - 5.6SQ Garage) Material Selection: IKO Dynasty Atlantic Blue SCOPE: Full House Roof (+ Detached Garage)
BLDG11454112025-09-25General construction4150 31ST AVE S14.8 SQ House Material Selection: IKO Granite Black (Photo in documents) SCOPE: House + Detached Garage **(Garage roof is on a separate permit: Res/BLDG1132795)**
BLDG11453942025-09-25General construction2838 POLK ST NE18 SQ. Full House Re-Side - Vinyl
BLDG11438882025-09-18General construction2811 GRAND ST NEPP: 10/12 (14.22 SQ) Material Selection: SCOPE: Full House Roof
BLDG11433902025-09-16General construction2023 HILLSIDE AVE NPP: (12 SQ) House - (3.6SQ) Garage Material Selection: IKO Dynasty - Summit Gray for the shingle color + QE Espresso for the Drip Edge SCOPE: Full House Roof (+ Detached Gara
BLDG11430532025-09-15General construction4027 PENN AVE NPP: 11/12 (27.67 SQ House, 7.33SQ Garage) Material Selection: IKO Dynasty Granite Black SCOPE: Full House Roof (+ Detached Garage)
BLDG11424112025-09-11General construction4023 PENN AVE NPP: 9/12 (18.81 SQ) Material Selection: IKO Dynasty Castle Gray SCOPE: Full House Roof (+ Detached Garage)
BLDG11420182025-09-09General construction947 18 1/2 AVE NE9 SQ. Material Selection: IKO Dynasty Sentinel Slate SCOPE: Full House Roof
BLDG11396432025-08-28General construction2838 POLK ST NE20.01 SQ Tear-Off & Re-Roof Asphalt Shingles Full House & Garage.
BLDG11378802025-08-18General construction731 BUCHANAN ST NEPP: 8/12 (12 SQ) House ( 5.3SQ) Garage Material Selection: IKO Dynasty Monaco Red SCOPE: Full House Roof (+ Detached Garage)
BLDG11375222025-08-15General construction4118 DUPONT AVE NTear off & ReRoof House Roof
BLDG11361482025-08-07General construction3950 31ST AVE S(23.33 SQ) Material Selection: SCOPE: Full House Roof
BLDG11346182025-07-29General construction3536 13TH AVE S( 6.37 SQ) Material Selection: CertainTeed CB D4 Herringbone SCOPE: Detached Garage Siding Repair
BLDG11339692025-07-24General construction3428 OAKLAND AVE5.35 SQ. Partial House Siding (Right and Rear Elevations) (+ Detached Garage)
BLDG11327952025-07-17General construction4150 31ST AVE S5.67 SQ Re-Roof Garage Material Selection: IKO Granite Black SCOPE: Detached Garage

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →