COMPANY RECORD · DETROIT, MI
State Electric Company — permit history in Detroit, MI
State Electric Company appears on 80 Detroit permit records from 2021 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 80 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 4 |
| 2022 | 20 |
| 2023 | 23 |
| 2024 | 10 |
| 2025 | 11 |
| 2026 | 12 |
Busiest year on record: 2023, with 23 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 2020 Elmhurst St | 2026-08-04 |
| 2069 Hyde Park Rd | 2026-07-28 |
| 1943 Ewald Cir | 2026-07-06 |
| 1967 Ewald Cir | 2026-07-06 |
| 590 N Eastlawn Ct | 2026-06-16 |
| 58 Parsons St | 2026-06-16 |
| 4018 4th St | 2026-03-23 |
| 1314 Holden St | 2025-11-24 |
| 78 Watson St, Apt 9 | 2025-09-09 |
| 670 Virginia Park St | 2025-08-28 |
| 9333 Dearborn St | 2025-07-09 |
| 78 Watson St | 2025-06-18 |
| 4401 Rosa Parks Blvd | 2025-06-12 |
| 1400 Oakman Blvd | 2025-04-01 |
70 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
80 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| ELE2026-03047 | 2026-08-04 | Electrical | 2020 Elmhurst St | Installation of (2) 48A EV Chargers | |
| ELE2026-02957 | 2026-07-28 | Electrical | 2069 Hyde Park Rd | Installation of (1) EV Charging Circuit | |
| ELE2026-02643 | 2026-07-06 | Electrical | 1943 Ewald Cir | Attach to permit # ELE2026-01992. Installation of new 600A service single phase-phase with meter banks for units | |
| ELE2026-02645 | 2026-07-06 | Electrical | 2020 Elmhurst St | New 1200A single phase service with 2 600A panels for units panels | |
| ELE2026-02644 | 2026-07-06 | Electrical | 1967 Ewald Cir | New 600A Service, Single Phase with meter banks for units | |
| ELE2026-02331 | 2026-06-16 | Electrical | 590 N Eastlawn Ct | Installation of (1) EV Charging Circuit | |
| ELE2026-02337 | 2026-06-16 | Electrical | 58 Parsons St | 1 - 120V circuit | |
| ELE2026-01993 | 2026-05-26 | Electrical | 2020 Elmhurst St | Electrical Repairs/Fixtures | |
| ELE2026-01992 | 2026-05-26 | Electrical | 1943 Ewald Cir | Fixtures/repairs | |
| ELE2026-01537 | 2026-04-24 | Electrical | 2069 Hyde Park Rd | ADD ON TO ELE2026-01158 | |
| ELE2026-01158 | 2026-03-30 | Electrical | 2069 Hyde Park Rd | Installation of (1) EV Charging Circuit -- Relocation of (1) power outlet on kitchen wall and moving to the coffee bar wall perpendicular to the window. -- Add (1) power outlet | |
| ELE2026-01040 | 2026-03-23 | Electrical | 4018 4th St | Installation of (1) EV Charging Circuit + Trenching | |
| ELE2025-05262 | 2025-11-24 | Electrical | 1314 Holden St | • Install all circuits and distribution wiring. • Install and Furnish all electrical outlets including. • Installing and furnish all lighting controls. • Install wiring to all HVAC | |
| ELE2025-03963 | 2025-09-09 | Electrical | 78 Watson St, Apt 9 | Routing CAT6 communication cable from the building utility room to the customers detached garage where it will be tied into the charger | |
| ELE2025-03848 | 2025-08-28 | Electrical | 670 Virginia Park St | Installation of (1) EV charging circuit | |
| ELE2025-03077 | 2025-07-09 | Electrical | 9333 Dearborn St | Installation of (6) EV charging circuits | |
| ELE2025-02742 | 2025-06-18 | Electrical | 78 Watson St | Installation of (1) EV charging circuit | |
| ELE2025-02660 | 2025-06-12 | Electrical | 4401 Rosa Parks Blvd | Electrical for New Build Apartment Building | |
| ELE2025-01502 | 2025-04-01 | Electrical | 1400 Oakman Blvd | Installation of (4) EV charging circuits | |
| ELE2025-01428 | 2025-03-27 | Electrical | 4366 W Davison St | Installation of new 200A service, Installation of (4) EV chargers. | |
| ELE2025-01429 | 2025-03-27 | Electrical | 3111 Elmwood St | Installation of new 200A service, Installation of (4) EV charging circuits | |
| ELE2025-01430 | 2025-03-27 | Electrical | 5024 28th St | Installation of new 400A service, Installation of (4) EV charging circuits | |
| ELE2025-00589 | 2025-02-11 | Electrical | 18012 Mark Twain St | Installation of (1) EV charging circuit, Installation of (1) reduced rate meter socket | |
| ELE2024-04600 | 2024-11-01 | Electrical | 5440 Beaubien St | Installation of EV Charging circuit | |
| ELE2024-03962 | 2024-09-25 | Electrical | 1565 Vinewood St | Installation of (1) EV charging circuit Installation of (1) reduced rate meter can | |
| ELE2024-03113 | 2024-08-08 | Electrical | 16566 Whitcomb St | Installation of (1) EV Charging Circuit and (1) 100A Service | |
| ELE2024-02739 | 2024-07-15 | Electrical | 2480 Iroquois St | Installation of (1) EV charging circuit | |
| ELE2024-02540 | 2024-07-03 | Electrical | 720 Saint Clair St | Installation of (1) EV charging circuit | |
| ELE2024-02226 | 2024-06-14 | Electrical | 17324 Washburn St | Installation of (1) EV charging circuit Service upgrade from 100A to 200A | |
| ELE2024-01963 | 2024-05-28 | Electrical | 27 Sand Bar Ln | Installation of (1) EV Charging Circuit and (1) 100A subpanel | |
| ELE2024-01069 | 2024-03-20 | Electrical | 6006 Lakeview St | Installation of (1) EV charging circuit Service upgrade from 100A to 200A | |
| ELE2024-00899 | 2024-03-07 | Electrical | 173 Keelson Ave | Installation of (1) 14-50 circuit | |
| ELE2024-00318 | 2024-01-29 | Electrical | 11851 E State Fair St | Installation of (1) circuit | |
| ELE2023-04188 | 2023-11-10 | Electrical | 18927 Pennington Ave | Installation of (1) EV Charging Circuit | |
| ELE2023-04101 | 2023-11-07 | Electrical | 16550 Ashton Ave | Installation of (1) circuit and upgrade to 200A Panel | |
| ELE2023-03367 | 2023-09-15 | Electrical | 20055 Robson St | Installation of (1) circuit Service upgrade from 100A to 200A | |
| ELE2023-03208 | 2023-09-01 | Electrical | 10933 Edlie Cir | Installation of (1) circuit | |
| ELE2023-03200 | 2023-08-31 | Electrical | 17138 Ohio St | Installation of (1) EV charging circuit | |
| ELE2023-03199 | 2023-08-31 | Electrical | 17595 Wisconsin St | Installation of (1) EV charging circuit | |
| ELE2023-03002 | 2023-08-16 | Electrical | 2130 E Jefferson Ave | Installation of (2) EV charging circuits | |
| ELE2023-02646 | 2023-07-19 | Electrical | 19365 Warrington Dr | Installation of (1) EV charging circuit | |
| ELE2023-02195 | 2023-06-14 | Electrical | 1900 Strathcona Dr | Installation of (1) EV charging circuit | |
| ELE2023-02136 | 2023-06-13 | Electrical | 5617 Renville St | Upgrade 100A panel to 200A panel | |
| ELE2023-02010 | 2023-06-05 | Electrical | 3031 Lothrop St | 2 circuits 100 AMP service | |
| ELE2023-01961 | 2023-05-31 | Electrical | 3029 Lothrop St | Replacing existing service | |
| ELE2023-01650 | 2023-05-04 | Electrical | 4428 Meldrum St | Install one vehicle charging circuit and receptacle (Nema 14-50r in weatherproof enclosure) on the exterior of the home | |
| ELE2023-01122 | 2023-03-27 | Electrical | 81 Melbourne St | ||
| ELE2023-01007 | 2023-03-17 | Electrical | 2520 W Euclid St | ||
| ELE2023-00873 | 2023-03-10 | Electrical | 5520 Woodward Ave | Installation of (2) EV chargers | |
| ELE2023-00777 | 2023-03-02 | Electrical | 3894 Burns St | Installation of (1) EV charger (outside of the home) |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Detroit permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
