COMPANY RECORD · DETROIT, MI

Progressive Mechanical Inc — permit history in Detroit, MI

Progressive Mechanical Inc appears on 101 Detroit permit records from 2019 through 2026, most often mechanical / hvac (78.2% of the record).

Permit categories

CategoryPermitsShare
Mechanical / HVAC7978.2%
Plumbing2221.8%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
201920
202019
202111
202213
202310
202414
20259
20265

Busiest year on record: 2019, with 20 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
9300 W Jefferson Ave2026-08-28
4100 John R St2026-04-09
6448 Sterling St2026-03-19
22101 Moross Rd, #10202025-11-05
14927 E Jefferson Ave2025-09-09
14044 Schaefer Hwy2025-05-02
13400 W Outer Dr2025-03-04
1424 Woodward Ave2025-02-20
2799 W Grand Blvd2024-12-02
12801 Chandler Park Dr2024-11-06
5200 Woodward Ave2024-10-22
6836 Georgia St2024-09-05
1038 Ashland St2024-08-28
650 PLAZA DR2024-08-28

50 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

101 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
MEC2026-039052026-08-28Mechanical / HVAC9300 W Jefferson AveInstallation of a sprinkler system within the chemical room of the SFE Pump Station. 28 heads. Billed for review and hydrostatic test. Deposit applied. JM
MEC2026-031132026-07-06Mechanical / HVAC9300 W Jefferson AveInstallation of one (1) minisplit, five (5) CRAC Units, and one (1) AHU
MEC2026-019822026-04-24Mechanical / HVAC9300 W Jefferson AveInstallation of copper piping, supports and hangers for (5) AHUs
MEC2026-016882026-04-09Mechanical / HVAC4100 John R StRelocation/Replacement of six sprinkler heads for new ceiling layout in the linear accelerator room (first floor). Billed for review and rough inspection. Deposit applied. JM
MEC2026-013302026-03-19Mechanical / HVAC6448 Sterling StInstallation of Natural Gas Piping to Boilers
MEC2025-068972025-11-05Mechanical / HVAC22101 Moross Rd, #1020Replacement/Relocation of four sprinkler heads to accommodate renovation of Cath Lab 4, Level 02 within a hospital. Billed for review and rough inspection. Deposit applied. JM
MEC2025-059052025-09-15Mechanical / HVAC6448 Sterling StInstallation of new U/G HVAC piping from energy plant to new hospital.
MEC2025-058402025-09-09Mechanical / HVAC14927 E Jefferson AveHEATING
MEC2025-032632025-05-02Mechanical / HVAC14044 Schaefer Hwy4/23/25: Installation of a new wet fire suppression system (313 heads) in the new DDOT Maintenance building (F-1 Occupancy). Billed for 2 hydro's & review, (Less $150 deposit). CG
MEC2025-015942025-03-04Mechanical / HVAC13400 W Outer DrAKA 13200 W OUTER DRIVE
MEC2025-013162025-02-20Mechanical / HVAC1424 Woodward AveInstallation of VRF System
MEC2025-005652025-01-22Mechanical / HVAC6448 Sterling StHEATING
PLM2025-009862025-01-22Plumbing6448 Sterling St
MEC2025-004752025-01-20Mechanical / HVAC4100 John R StModification of existing sprinkler system by replacement of 4 heads for ceiling layout per Plans. Billed for review of 4 heads rough inspection less depsoit. AM 1/17/2025.
MEC2024-072862024-12-23Mechanical / HVAC14044 Schaefer HwyInstallation of a wet fire suppression system with fire pump within a storage occupancy. 495 heads. Billed for review, two (2) hydrostatic tests, and a fire pump test. Deposit appl
MEC2024-068182024-12-02Mechanical / HVAC2799 W Grand BlvdInstallation/Relocation of twelve (12) sprinkler heads to accommodate new wall and ceiling layout on the third floor (K3) IR room & UPS cabinet inside of Henry Ford Hospital. Bille
MEC2024-062912024-11-06Mechanical / HVAC12801 Chandler Park Dr11/5/24: Installation of a wet fire suppression system, (73 heads) in the Chandler Park Dome Community Area, light hazard occupancy. Billed for testing & review, (Less $150 deposit
MEC2024-059732024-10-22Mechanical / HVAC5200 Woodward AveInstallation of two (2) new single interlock preaction fire suppression systems (basement and ground floor) within an art museum. 133 heads. Billed for review and a hydrostatic tes
MEC2024-058082024-10-14Mechanical / HVAC2799 W Grand BlvdModification of existing sprinkler system by adding 2 sprinkler heads and relocating 7 per Plans. billed for the review of 9 sprinkler heads and rough inspection less deposit. AM 1
MEC2024-050072024-09-25Mechanical / HVAC9300 W Jefferson AveInstallation/Relocation of twenty-two (22) sprinkler heads in the GLWA Floride Room. Billed for testing & review, (Less $150 deposit). CG
MEC2024-046482024-09-05Mechanical / HVAC6836 Georgia StRemoval of existing 1500 gpm/115 psi fire pump within an industrial occupancy and installation of new pump house with new 2000 gpm/125 psi diesel pump and two (2) new 250,000-gallo
MEC2024-047872024-08-28Mechanical / HVAC1038 Ashland StREFERENCE: MEC2024-03253
MEC2024-047502024-08-28Mechanical / HVAC650 PLAZA DRInstallation of 133 sprinkler heads to accommodate renovation on floors 8 and 9 of a high-rise office building, and replacement of existing fire hose cabinets on those floors. Bill
PLM2024-078802024-08-15Plumbing2000 2nd St
PLM2024-071712024-07-30Plumbing6836 Georgia StPLUMBING
PLM2024-053862024-06-17Plumbing1038 Ashland St
MEC2024-032532024-06-13Mechanical / HVAC1038 Ashland StMEC
MEC2023-057722024-01-09Mechanical / HVAC660 Plaza Dr
MEC2023-051342023-10-23Mechanical / HVAC2500 E Grand BlvdInstallation of new wet-type fire suppression piping for non-combustible MFA-1 and MFA-5 weld tab and PPT booths within an industrial occupancy (Zone 57C). 20 heads. Billed for rev
MEC2023-045242023-09-21Mechanical / HVAC3901 Beaubien StRelocation of six sprinkler heads to accommodate hospital renovation of DMC PET Scan lower level. Review fee covered by $150 deposit. Billed for rough inspection. JM
MEC2023-041242023-08-22Mechanical / HVAC2500 E Grand BlvdInstallation of sprinkler protection beneath mezzanine #s 5 and 6 in zone 59 within an industrial occupancy. 34 heads. Billed for review (less $150 deposit) and hydrostatic test. J
MEC2023-040882023-08-21Mechanical / HVAC660 Plaza DrRenovation of the existing fire suppression system on the 1st floor of the DTE WCB1 area, Light hazard occupancy. Billed for review and testing (less $150 deposit). CG
MEC2023-035532023-07-19Mechanical / HVAC2500 E Grand BlvdInstallation of sprinkler protection beneath ASRS mezzanine in zone 46 within an industrial occupancy. 13 heads. Billed for review (less $150 deposit) and rough inspection. JM
MEC2023-033362023-07-05Mechanical / HVAC2500 E Grand BlvdInstallation of 44 in-rack heads for new rack storage within an industrial occupancy (sprinkler zone 47). Billed for review (less $150 deposit) and hydrostatic test. JM
MEC2023-011272023-05-02Mechanical / HVAC2500 E Grand BlvdInstallation of suppression beneath ASRS mezzanine within an industrial occupancy (riser zone 47). 32 heads. Billed for review (less $150 deposit) and hydrostatic test. JM
MEC2023-020232023-04-28Mechanical / HVAC150 Bagley StInstallation on a new fire pump, 2 standpipes, and 1935 sprinkler heads in a renovated existing building. To be used as and R, B, & M occupancy. Billed for review, a fire pump te
MEC2023-015232023-04-04Mechanical / HVAC9962 E Jefferson AveHTG
PLM2023-000642023-01-11Plumbing6501 E Vernor Hwy
MEC2021-032742022-10-10Mechanical / HVAC1126 Pallister StInstallation of Class I manual dry standpipe system in Henry Ford Parking Garage. 7 levels. Hydrostatic and Flow Testing fees included in review. Payment of DFD pumper and personne
PLM2022-022122022-09-30Plumbing9300 W Jefferson Ave
MEC2022-032382022-07-20Mechanical / HVAC22101 Moross RdAddition/Relocation of 121 heads for surgery renovation, level 2, phase 5. Billed for review (less $150 deposit) and hydrostatic test. JM
MEC2022-029072022-07-05Mechanical / HVAC8324 Woodward AveInstallation of a new automatic sprinkler system (241 sprinklers) within a 2 story, mixed use occupancy. Billed for review and 2 hours of hydrostatic testing. DLT
MEC2022-018952022-05-18Mechanical / HVAC2110 Park AveInstallation of 20 heads on the 8th/9th floors of a high rise building. Billed for review (less $150 deposit) and rough inspection. JM
MEC2021-032112022-05-12Mechanical / HVAC1501 Wabash StInstallation of fire suppression system in Ford parking garage. Combined wet system with manual dry standpipe. 77 heads. Testing fees included in review except for Fire Dept. appar
PLM2022-007682022-04-26Plumbing6200 W Warren AvePLUMBING **BLDG PERMIT #BLD2021-04821**
PLM2022-005562022-03-30Plumbing660 Plaza DrReroute Domestic water. Add a drinking fountain and food grinder.
MEC2022-009932022-03-01Mechanical / HVAC1548 Porter StBLD PERMIT #BLD2021-00834 **REFRIG**
MEC2022-009922022-03-01Mechanical / HVAC1548 Porter StBLD PERMIT #BLD2021-00834 **HEATING**
MEC2022-009482022-02-25Mechanical / HVAC1 Woodward AveAddition/Relocation of five heads to accommodate suite 1500 renovation. Billed for rough inspection. Review fee covered by $150 deposit. JM
PLM2022-001572022-01-25Plumbing2101 Conner LnPLUMBING

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Detroit permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →