COMPANY RECORD · DETROIT, MI

Daniel Electric Co — permit history in Detroit, MI

Daniel Electric Co appears on 121 Detroit permit records from 2019 through 2026, most often electrical (76.9% of the record).

Permit categories

CategoryPermitsShare
Electrical9376.9%
Fire protection2823.1%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
201917
202018
202121
20228
202310
202425
202519
20263

Busiest year on record: 2024, with 25 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
234 Piquette St2026-08-10
8162 E Jefferson Ave, Unit MB2026-03-12
7733 E Jefferson Ave, #1002026-03-12
1184 McKinstry St2025-11-20
250 E Harbortown Dr2025-07-21
3711 Woodward Ave2025-06-03
1453 Hubbard St2025-05-15
1312 Seward St2025-04-25
1739 25th St2025-04-22
1185 Clark St2025-04-22
3502 W Vernor Hwy2025-04-22
3615 W Vernor Hwy2025-03-14
465 W Grand Blvd2025-03-14
21566 ORCHARD2025-02-28

42 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

121 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
ELE2026-031162026-08-10Electrical234 Piquette StPBS-Detroit electrical exterior & interior site underground, 200A site temp power, and 100A temp power to GC job trailer
FAP2026-000412026-03-12Fire protection8162 E Jefferson Ave, Unit MBDetroit Towers - Replace existing FA System
FAP2026-000402026-03-12Fire protection7733 E Jefferson Ave, #100Riverview Health & Rehab - Elevator Recall FA System
ELE2025-052052025-11-20Electrical1184 McKinstry StClark Street Parking Lot Lighting - McKinstry address location
FAP2025-001512025-07-21Fire protection250 E Harbortown DrGreat Lakes Towers - permit for additional FA equipment requested by the Electrical Inspector Adam Abele. Reference original permit #FAP2024-00089
FAP2025-001132025-06-03Fire protection3711 Woodward AveDSO-Elevator Recall for CARS #3, #5, #6 (freight, education, checkerboard hall)
ELE2025-022532025-05-15Electrical1453 Hubbard StHubbard Farms-Harwill Building pulling additional permit for (76) fixtures and (19) range hoods for a total of (95) units per the Electrical Inspector Peter Weertz. Reference orig
ELE2025-021732025-05-12Electrical1453 Hubbard StHubbard Farms-Harwill Building 200A service panel per the request of Inspector Peter Weertz. Reference inspection permit #ELE2025-02137.
ELE2025-021372025-05-08Electrical1453 Hubbard StHubbard Farms-Harwill Building special inspection for the Electrical Inspector Peter Wentz to look at the existing building 800A service as he's requesting.
ELE2025-018832025-04-25Electrical1312 Seward StMerrill Place Apartments II - 1st floor buildout, including electrical room, lobby area, office, restroom, dog wash, mechanical room, & parking garage.
ELE2025-018192025-04-22Electrical1739 25th StMartin Gardens - House
ELE2025-018152025-04-22Electrical1185 Clark StMartin Gardens - Clark Apartments alterations project 1/1 replacement of receptacles, switches, fixtures, and A/C units (36 units)
ELE2025-018172025-04-22Electrical1739 25th StMartin Gardens - Apartments (5 units) (1739-1747-1749-1753-1755) renovation project - 1/1 replacement of receptacles, switches, fixtures, and A/C units.
ELE2025-018162025-04-22Electrical3502 W Vernor HwyMartin Gardens: Vernor Townhomes East (3502-3506-3510-3514) Vernor Townhomes West (3516-3520-3524-3528) 1/1 replacement of receptacles, switches, fixtures, and A/C units
ELE2025-011482025-03-14Electrical3615 W Vernor HwyHubbard Farms-Cole Building/power upgrade - adding 400A service & 8 meters to split up the electrical load.
ELE2025-011492025-03-14Electrical465 W Grand BlvdHubbard Farms-Harrington Building/power upgrade-adding 300A service & 6 meters to split up the electrical load.
ELE2025-008732025-02-28Electrical21566 ORCHARDOrchard Village- Buildings C-A-D-b additional permit requested by Inspector Helm (rough inspections, residential smoke detectors, and 1/4-10 heating units for range, washer, & drye
ELE2025-007402025-02-20Electrical1312 Seward StMerrill Place Apartments II - 3rd Floor Buildout
ELE2025-007382025-02-20Electrical1312 Seward StMerrill Place Apartments II - 4th Floor Buildout
ELE2025-007412025-02-20Electrical1312 Seward StMerrill Place Apartments II - 2nd Floor Buildout
ELE2025-006032025-02-11Electrical465 W Grand BlvdHubbard Farms-Harrington Building, installation of (19) new electric water heaters.
FAP2025-000102025-01-29Fire protection801 W Willis StHancock Residential Center - install new Fire Alarm System
ELE2024-052442024-12-13Electrical4000 W Vernor HwyLa Joya - Temporary EM lights installed in corridors on floors 2-3-4, 2 stairwells, & lobby egress areas as requested until EM Invertor is commissioned & operating.
FAP2024-002652024-11-12Fire protection17300 Southfield Service DriveGreenhouse Apartments - FA matrix change for 419 apartment unit smoke detectors from alarm to supervisory at the request of the Fire Department per a letter the facility received d
FAP2024-002632024-11-12Fire protection21566 ORCHARDOrchard Village - Building/Cluster B Fire Alarm System
FAP2024-002622024-11-12Fire protection21525 Santa Clara AveOrchard Village - Building/Cluster D Fire Alarm System
FAP2024-002332024-10-08Fire protection4000 W Vernor HwyLa Joya Gardens - installation of new Fire Alarm System
ELE2024-036252024-09-04Electrical21566 ORCHARDOrchard Village - Building/Cluster B Buildout
ELE2024-034102024-08-21Electrical21525 Santa Clara AveOrchard Village - Building D Buildout
ELE2024-029162024-07-25Electrical21566 ORCHARDOrchard Village - Site Lighting (power being fed from Building/Cluster B)
FAP2024-001682024-07-23Fire protection21566 ORCHARDOrchard Village - Building/Cluster A Fire Alarm System
ELE2024-028542024-07-22Electrical21566 ORCHARDOrchard Village - Building/Cluster A Buildout
ELE2024-024402024-06-27Electrical4000 W Vernor HwyLa Joya Gardens - 1st Floor Areas/lobby, electrical room, trach room, mechanical room, bike room, elevator lobby area, 2 bathrooms, office, reception area, mail room.
FAP2024-001282024-06-07Fire protection6221 Brush StPiquette Square - replace existing FACP
FAP2024-001292024-06-07Fire protection3031 W Grand BlvdNew Center One - Suite 136 add (1) FA speaker/strobe unit
ELE2024-021012024-06-07Electrical4000 W Vernor HwyLa Joya Gardens - 2nd Floor Amenities Areas/Amenity Room, Conference Room, Fitness Room, Bathroom
FAP2024-001242024-06-06Fire protection21566 ORCHARDOrchard Village - Building/Cluster C Fire Alarm System
ELE2024-017862024-05-15Electrical21566 ORCHARDOrchard Village - Building/Cluster C Buildout
ELE2024-015802024-05-03Electrical21566 ORCHARDOrchard Village-install underground feeders for site power
ELE2024-014982024-04-26Electrical4000 W Vernor HwyLa Joya Gardens - 2nd Floor buildout
ELE2024-014962024-04-26Electrical4000 W Vernor HwyLa Joya Gardens - 3rd Floor buildout
ELE2024-014952024-04-26Electrical4000 W Vernor HwyLa Joya Gardens - 4th Floor buildout
ELE2024-014852024-04-26Electrical1312 Seward St200A Temp Service-Merrill Place Apartments II
FAP2024-000892024-04-18Fire protection250 E Harbortown DrGreat Lake Towers - Installation of new Fire Alarm System
ELE2024-010162024-03-15Electrical1453 Hubbard StHubbard Farms - Harwill Building Renovations
ELE2024-010172024-03-15Electrical3615 W Vernor HwyHubbard Farms - Cole Building Renovations
ELE2024-010182024-03-15Electrical465 E Grand BlvdHubbard Farms - Harrington Building Renovations
ELE2023-046492023-12-20Electrical21543 Orchard StOrchard Village - 100 amp overhead temp service with (1) 100 amp disconnect switch and 100' feeder to the Job Trailer.
ELE2023-046232023-12-15Electrical21566 ORCHARDOrchard Village - 400 amp overhead temp service with (2) 200 amp disconnect switches on a stanchion at the DTE pole for the job site
ELE2023-038722023-10-23Electrical2895 E Grand BlvdHot Bones Yoga Studio - remodeling project

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Detroit permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →