COMPANY RECORD · NEW ORLEANS, LA
Steven M. Ordes — permit history in New Orleans, LA
Steven M. Ordes appears on 79 New Orleans permit records from 2016 through 2026, most often electrical (96.2% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 76 | 96.2% |
| General construction | 3 | 3.8% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2016 | 4 |
| 2017 | 10 |
| 2018 | 7 |
| 2019 | 5 |
| 2020 | 7 |
| 2021 | 20 |
| 2022 | 7 |
| 2023 | 8 |
| 2024 | 6 |
| 2025 | 3 |
| 2026 | 2 |
Busiest year on record: 2021, with 20 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 101 Morgan St | 2026-03-26 |
| 210 State St | 2025-11-20 |
| 200 Henry Clay Ave | 2025-11-19 |
| 1120 Freret St | 2025-04-22 |
| 822 Navarre St | 2024-11-14 |
| 1639 Paul Morphy St | 2024-05-23 |
| 1637 Paul Morphy St | 2024-03-05 |
| 1317 Canal St | 2023-12-14 |
| 837 N Broad St Ste 2A | 2023-08-29 |
| 1901 Leon C Simon Dr | 2023-06-08 |
| 1750 Saint Charles Ave Unit CU1 | 2023-05-25 |
| 2836 La Salle St | 2023-03-28 |
| 1324 S Carrollton Ave | 2023-02-14 |
| 2040 St Charles Ave | 2022-12-02 |
53 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $2,279,812, median $0. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
79 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 26-09187-LOOP | 2026-03-26 | Electrical | 101 Morgan St | Temporary Electrical Pole Service | $2,000 |
| 26-06511-SERV | 2026-03-16 | Electrical | 101 Morgan St | Remodel of the Algiers Ferry Landing Terminal | $1,035,521 |
| 25-35709-SERV | 2025-11-20 | Electrical | 210 State St | Childrens State St Campus Annual Gear Cleaning. | $57,900 |
| 25-35705-SERV | 2025-11-19 | Electrical | 200 Henry Clay Ave | Childrens Main Campus Annual Gear Cleaning | $57,900 |
| 25-00282-ERPR | 2025-04-22 | Electrical | 1120 Freret St | Renovation of a 2 story 3,040 sq Ft existing building | $106,792 |
| 24-34392-ERPR | 2024-11-15 | Electrical | 200 Henry Clay Ave | Room Build Out | $56,100 |
| 24-33921-EVAC | 2024-11-14 | Electrical | 822 Navarre St | Vacancy Inspection Last service date 03/12/2024 | $650 |
| 24-33593-SERV | 2024-11-08 | Electrical | 200 Henry Clay Ave | Annual Switchgear torque and Clean. Cut-in/Cut-out scheduled w/ Entergy | $42,800 |
| 24-15754-SERV | 2024-05-23 | Electrical | 1639 Paul Morphy St | Electrical Remodel of existing home. | $3,700 |
| 24-05248-SERV | 2024-03-05 | Electrical | 1637 Paul Morphy St | Repair wiring and change service. | $3,700 |
| 24-01610-SERV | 2024-01-30 | Electrical | 210 State St | Clean and Torque Main Switch Gear | $11,200 |
| 23-32984-SERV | 2023-12-14 | Electrical | 1317 Canal St | Install 3 new EV chargers | $24,000 |
| 23-31283-ERPR | 2023-11-14 | Electrical | 200 Henry Clay Ave | Annual switch gear clean and torque. We have a 5-year contract for this work I will submit a copy of the original singed scope that we submitted for the original permit in 2021. | $52,800 |
| 23-19132-SERV | 2023-08-29 | Electrical | 837 N Broad St Ste 2A | Provide complete electrical for new building | $165,000 |
| 23-10316-SERV | 2023-06-08 | Electrical | 1901 Leon C Simon Dr | Install complete Electrical for new Hynes Elementary | $2,279,812 |
| 23-13303-SERV | 2023-05-25 | Electrical | 1750 Saint Charles Ave Unit CU1 | Renovate existing unit for a dental clinic. Provide new lights and outlets. Existing service to remain. | $17,800 |
| 23-13390-ERPR | 2023-05-23 | Electrical | 200 Henry Clay Ave | Remodel Of Cardiology clinic | $28,500 |
| 23-07260-ERPR | 2023-03-28 | Electrical | 2836 La Salle St | Complete Electrical Remodel | $521,628 |
| 22-27986-ERPR | 2023-02-14 | Electrical | 1324 S Carrollton Ave | Install a Manual Transfer Switch | $10,300 |
| 22-34204-ERPR | 2022-12-02 | Electrical | 2040 St Charles Ave | Repair Main Entergy Service. | $5,769 |
| 22-32383-ERPR | 2022-11-02 | Electrical | 200 Henry Clay Ave | PM Switch gear for Hospital | $61,600 |
| 22-29123-ERPR | 2022-10-06 | Electrical | 4035 Washington Ave | Change out 16 existing fixtures, and add 3 switches in the existing walls. | $4,100 |
| 22-24999-ERPR | 2022-08-31 | Electrical | 200 Henry Clay Ave | Remodel Of Specialty Pharmacy | $68,785 |
| 22-22329-RNVN | 2022-08-17 | General construction | 200 N Rampart St | Electrical | $42,600 |
| 22-15946-ERPR | 2022-05-31 | Electrical | 2600 Ap Tureaud Ave | Remodel Of Existing Classroom Building | $752,000 |
| 22-11231-ERPR | 2022-04-22 | Electrical | 210 State St Bldg 4 | Renovation of existing building 4 | $752,000 |
| 21-33088-ERPR | 2021-12-01 | Electrical | 200 Henry Clay Ave | Planned outage and reconnect. Maintenance of switchgear MSB-3 clean and torque gear. | $0 |
| 21-33094-ERPR | 2021-12-01 | Electrical | 200 Henry Clay Ave | Planned outage and reconnect. Maintenance of switchgear MSB-5 clean and torque gear. | $0 |
| 21-33091-ERPR | 2021-12-01 | Electrical | 200 Henry Clay Ave | Planned outage and reconnect. Maintenance of switchgear MSB-4 clean and torque gear. | $0 |
| 21-33084-ERPR | 2021-12-01 | Electrical | 200 Henry Clay Ave | Planned outage and reconnect. Maintenance on switchgear MSB-1 clean and torque gear. | $0 |
| 21-32929-ERPR | 2021-11-29 | Electrical | 2600 Ap Tureaud Ave | Fire In the Gym Building. Entergy Pulled the meter for the Gym. We are cleaning and securing this service to re-energize un-affected areas. | $20,000 |
| 21-10022-SERV | 2021-07-21 | Electrical | 5909 St Claude Ave Apt 203 | NEW SERVICE 20-02145-RNVS | $0 |
| 21-10023-SERV | 2021-07-21 | Electrical | 5909 St Claude Ave Apt 204 | NEW SERVICE 20-02145-RNVS | $0 |
| 21-10087-SERV | 2021-07-21 | Electrical | 5909 St Claude Ave Ste 104 | NEW SERVICE 20-02145-RNVS | $0 |
| 21-10086-SERV | 2021-07-21 | Electrical | 5909 St Claude Ave Ste 103 | NEW SERVICE 20-02145-RNVS | $0 |
| 21-10025-SERV | 2021-07-21 | Electrical | 5909 St Claude Ave Apt 205 | NEW SERVICE 20-02145-RNVS | $0 |
| 21-10085-SERV | 2021-07-21 | Electrical | 5909 St Claude Ave Ste 102 | NEW SERVICE 20-02145-RNVS | $0 |
| 21-10020-SERV | 2021-07-21 | Electrical | 5909 St Claude Ave Apt 202 | NEW SERVICE 20-02145-RNVS | $0 |
| 21-10017-SERV | 2021-07-21 | Electrical | 5909 St Claude Ave Apt 201 | NEW SERVICE 20-02145-RNVS | $0 |
| 21-10026-SERV | 2021-07-21 | Electrical | 5909 St Claude Ave Apt 206 | NEW SERVICE 20-02145-RNVS | $0 |
| 21-10084-SERV | 2021-07-21 | Electrical | 5909 St Claude Ave Ste 101 | NEW SERVICE 20-02145-RNVS | $0 |
| 21-15372-ERPR | 2021-05-27 | Electrical | 200 N Rampart St | Replace 600 amp meter can | $0 |
| 21-11782-EGEN | 2021-04-26 | Electrical | 5131 Chamberlain Dr | Install 24 kw natural gas generator | $0 |
| 21-04526-SERV | 2021-02-18 | Electrical | 1637 Paul Morphy St | Rewire 20-34770 RNVN | $0 |
| 20-45863-SERV | 2021-02-08 | Electrical | 5909 St Claude Ave FIRE PUMP | 20-02145-RNVS NEW SERVICE FOR MIXED USE APARTMENTS & OFFICES 1600 AMPS AND 292 CIRCUITS | $0 |
| 20-48046-ERPR | 2021-01-19 | Electrical | 210 State St | CLEAN HIGH VOLTAGE SWITCHGEAR | $0 |
| 20-47983-ERPR | 2020-11-30 | Electrical | 200 Henry Clay Ave | CLEAN SWITCH GEAR 3 OF 3 | $0 |
| 20-47978-ERPR | 2020-11-30 | Electrical | 200 Henry Clay Ave | CLEAN SWITCH GEAR 1 OF 3 | $0 |
| 20-04630-LOOP | 2020-11-16 | Electrical | 5909 St Claude Ave | Provide temp power for demo | $0 |
| 20-45954-MOVS | 2020-11-09 | Electrical | 5909 St Claude Ave Elevator | ELEVATOR FOR MIXED USE APARTMENTS & OFFICES 20-02145-RNVS | $0 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New Orleans permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
