COMPANY RECORD · NEW ORLEANS, LA
Rene Michael Henry — permit history in New Orleans, LA
Rene Michael Henry appears on 48 New Orleans permit records from 2016 through 2026, most often electrical (64.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 31 | 64.6% |
| Mechanical / HVAC | 10 | 20.8% |
| General construction | 7 | 14.6% |
3 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2016 | 1 |
| 2017 | 3 |
| 2018 | 7 |
| 2019 | 2 |
| 2020 | 2 |
| 2022 | 2 |
| 2023 | 5 |
| 2024 | 13 |
| 2025 | 8 |
| 2026 | 5 |
Busiest year on record: 2024, with 13 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 5670 Lincoln Beach Blvd | 2026-06-29 |
| 2643 Republic St | 2026-06-18 |
| 1034 N Carrollton Ave | 2026-04-13 |
| 5710 General Diaz St | 2026-03-16 |
| 1431 Octavia St | 2025-08-21 |
| 1711 Palmer Ave | 2025-07-31 |
| 1543 Maura Pl | 2025-01-30 |
| 4863 Feliciana Dr | 2024-10-22 |
| 7351 Hansbrough Ave | 2024-10-07 |
| 5824 Chamberlain Dr | 2024-09-26 |
| 547 Joseph St | 2024-08-05 |
| 1300 N Broad St | 2024-06-07 |
| 6000 Saint Charles Ave | 2024-05-30 |
| 29 Grand Canyon Dr | 2023-08-02 |
31 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $22,305, median $5,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
48 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 26-13882-SERV | 2026-06-29 | Electrical | 5670 Lincoln Beach Blvd | Building a new service for commercial use. | $8,550 |
| 26-18203-HVAC | 2026-06-18 | Mechanical / HVAC | 2643 Republic St | New HVAC installation. | $10,000 |
| 26-07924-SERV | 2026-04-13 | Electrical | 1034 N Carrollton Ave | Installation of 20KW Kohler Generator and 200AMP ATS | $17,000 |
| 26-03407-FGAS | 2026-03-24 | Mechanical / HVAC | 1034 N Carrollton Ave | Generator Installation | $17,000 |
| 26-05298-HVAC | 2026-03-16 | Mechanical / HVAC | 5710 General Diaz St | Installation of a 2 head mini split system. | $11,500 |
| 25-24277-ERPR | 2025-08-22 | Electrical | 5670 Lincoln Beach Blvd | Removed Romex and Ran new 12/2 MC Cable | $1,000 |
| 25-21644-EGEN | 2025-08-21 | Electrical | 1431 Octavia St | Kohler Generator 26KW Installation | $10,000 |
| 25-21646-FGAS | 2025-07-31 | Mechanical / HVAC | 1431 Octavia St | Kohler Generator 26KW Installation | $10,000 |
| 25-23246-FGAS | 2025-07-31 | Mechanical / HVAC | 1711 Palmer Ave | Kohler 48KW Generator Installation. Gas Meter will need to be upgraded. | $5,920 |
| 24-32930-ACCS | 2025-07-30 | General construction | 1431 Octavia St | INSTALLATION OF 38KW LIQUID COOLED KOHLER GENERATOR WILL NEED A GAS METER UPGRADE | $9,800 |
| 25-00649-EGEN | 2025-01-30 | Electrical | 1543 Maura Pl | Installation of 20KW Kohler Generator | $5,000 |
| 25-00652-FGAS | 2025-01-30 | Mechanical / HVAC | 1543 Maura Pl | Installation of 20KW Kohler Generator and will need to change out the Gas Meter | $5,000 |
| 24-32918-ACCS | 2025-01-07 | General construction | 1543 Maura Pl | INSTALLATION OF 20KW KOHLER GENERATOR AND WILL NEED TO UPGRADE GAS METER | $22,305 |
| 24-30895-EGEN | 2024-10-22 | Electrical | 4863 Feliciana Dr | Installation of a 20KW Kohler generator. Using 3rd party inspections. | $1,000 |
| 24-30893-FGAS | 2024-10-11 | Mechanical / HVAC | 4863 Feliciana Dr | Installation of a Kohler 20KW generator. Will need a gas meter upgrade. Will be using 3rd party for inspections. | $1,000 |
| 24-29409-FGAS | 2024-10-07 | Mechanical / HVAC | 7351 Hansbrough Ave | 14KW Kohler with Transfer Switch | $10,779 |
| 24-29085-ERPR | 2024-09-26 | Electrical | 5824 Chamberlain Dr | Electrical Repairs | $7,500 |
| 24-27036-ACCS | 2024-09-25 | General construction | 4863 Feliciana Dr | Installation of a Kohler 20KW Generator with custom aluminum stand | $16,000 |
| 24-23241-EGEN | 2024-08-05 | Electrical | 547 Joseph St | Installation 20KW Kohler Generator | $17,800 |
| 24-23368-ERPR | 2024-08-05 | Electrical | 547 Joseph St | 20KW Kohler Generator Installation...NO METER Change out | $17,800 |
| 24-23245-FGAS | 2024-07-29 | Mechanical / HVAC | 547 Joseph St | Installation of 20KW Kohler Generator will need to upgrade gas meter to a 2lb gas meter | $17,500 |
| 24-20892-ACCS | 2024-07-29 | General construction | 547 Joseph St | 20KW Kohler Generator Installation | $17,800 |
| 24-01953-ACCS | 2024-06-07 | General construction | 1300 N Broad St | Install Generator **Screen fence to be installed prior to CO** | $9,900 |
| 24-14503-ACCS | 2024-05-30 | General construction | 6000 Saint Charles Ave | Replace existing generator with new generator | $16,500 |
| 24-14898-ERPR | 2024-05-20 | Electrical | 6000 Saint Charles Ave | Connect electrical for generator to existing electrical | $16,500 |
| 24-12263-EGEN | 2024-05-20 | Electrical | 6000 Saint Charles Ave | Generator permit | $16,500 |
| 23-19999-EGEN | 2023-08-02 | Electrical | 29 Grand Canyon Dr | Generator installation | $2,000 |
| 23-19538-ERPR | 2023-08-01 | Electrical | 524 Bouny St Apt 1A | Electrical repair and replacement | $8,400 |
| 23-16203-ACCS | 2023-07-06 | General construction | 4612 Laurel St | 20KW Kohler Generator Installation. No digging allowed under this permit. | $14,231 |
| 23-08396-EVAC | 2023-03-31 | Electrical | 1422 Saint Bernard Ave | Vacancy Inspection | $300 |
| 23-06123-EGEN | 2023-03-28 | Electrical | 5022 St Ferdinand Dr | Generator Permit | $560 |
| 22-34978-EGEN | 2022-11-28 | Electrical | 4814 Chestnut St | Permanent Generator Electrical Permit | $200 |
| 22-08670-ERPR | 2022-03-23 | Electrical | 7620 Trapier Ave | Emergency Same Day Disconnect and Reconnect for a Meter Pan Change Out | $1,000 |
| 20-23389-SERV | 2020-03-27 | Electrical | 3909 Herschel St | Permanent Power to Module Home | $1,500 |
| 20-23293-LOOP | 2020-03-25 | Electrical | 3909 Herschel St | CONSTRUCTION LOOP 19-24538-NEWC | $0 |
| 19-08041-ERPR | 2019-03-19 | Electrical | 615 N Murat St | Electrical Repairs-Using Third Party Inspection | $1,000 |
| 19-00766-SERV | 2019-01-09 | Electrical | 535 Abalon Ct | Rough In electrical inspection-using Third Party for Inspection | $1,000 |
| 18-40937-SERV | 2018-12-14 | Electrical | 204 Berkley Dr | Rough-In Inspection-Use Third Party | $1,000 |
| 18-33095-ERPR | 2018-10-04 | Electrical | 5618 Orleans Ave | Rough In Inspection - Using 3rd Party Inspector | $1,000 |
| 18-28832-LOOP | 2018-09-07 | Electrical | 204 Berkley Dr | Temp Pole Inspection - Using Third Party | $1,000 |
| 18-28833-LOOP | 2018-09-07 | Electrical | 535 Abalon Ct | Temp Pole Inspection-Using Third Party | $1,000 |
| 18-20621-LOOP | 2018-06-26 | Electrical | 5618 Orleans Ave | Temporary Pole - 3rd Party Inspection | $1,000 |
| 18-10483-SERV | 2018-04-03 | Electrical | 34 Seaward Ct | Take - Over - at Trim Out Stage....JNJ Construction sent the Take Over to Charles Collins on 3/27/2018 at [email protected] | $1,000 |
| 18-08543-SERV | 2018-03-22 | Electrical | 5 Leeward Ct | Electrical Trim-out take over | $1,000 |
| 17-07565-EFLO | 2017-03-06 | Electrical | 13901 Old Gentilly Rd Oshun Parade | 18 FLOATS OSHUN | $0 |
| 17-07567-EFLO | 2017-03-06 | Electrical | 13901 Old Gentilly Rd Sparta Parade | SPARTA 14 FLOATS | $0 |
| 17-07568-EFLO | 2017-03-06 | Electrical | 13901 Old Gentilly Rd Choctaw Parade | CHOCTAW PARADE 4 FLOATS | $0 |
| 16-21855-HVAC | 2016-07-01 | Mechanical / HVAC | 508 Eleonore St | repair / alternation Rene Henry Michael (#1547) 504-234-6126 16-19211-Rnvn | $500 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New Orleans permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
