COMPANY RECORD · NEW ORLEANS, LA
Mlm Construction LLC — permit history in New Orleans, LA
Mlm Construction LLC appears on 123 New Orleans permit records from 2015 through 2026, most often general construction (57.7% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 71 | 57.7% |
| Mechanical / HVAC | 43 | 35% |
| Electrical | 7 | 5.7% |
| Demolition | 2 | 1.6% |
4 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 4 |
| 2016 | 12 |
| 2017 | 9 |
| 2018 | 8 |
| 2019 | 19 |
| 2020 | 15 |
| 2021 | 11 |
| 2022 | 1 |
| 2023 | 4 |
| 2024 | 10 |
| 2025 | 18 |
| 2026 | 12 |
Busiest year on record: 2019, with 19 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 2353 Saint Thomas St | 2026-08-11 |
| 6860 Memphis St | 2026-05-13 |
| 1417 Dufossat St | 2026-05-12 |
| 123 Walnut St Unit 8E | 2026-04-22 |
| 2100 Milan St Apt 2A | 2026-04-21 |
| 2100 Milan St Apt 2B | 2026-04-21 |
| 2100 Milan St Apt 1B | 2026-04-21 |
| 2100 Milan St Apt 1A | 2026-04-21 |
| 2718 Chartres St | 2026-04-16 |
| 235 Atlantic Ave | 2026-04-15 |
| 2100 Milan St HM | 2025-12-01 |
| 4027 Delgado Dr | 2025-09-04 |
| 4220 Loyola Ave | 2025-04-17 |
| 4222 Loyola Ave | 2025-04-17 |
102 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $795,427, median $37,062. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
123 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 24-36785-RNVS | 2026-08-11 | General construction | 2353 Saint Thomas St | Structural renovation to a 727SF existing one story single family home. Renovations to consit of layout changes and a 583SF second floor addition. To be built as per plans. *FIN | $659,843 |
| 25-16698-NEWC | 2026-05-13 | General construction | 6860 Memphis St | New construction of a 2,300 sq ft, 2-story, single family home with driveway. To be built as per plans. | $795,427 |
| 26-13841-HVAC | 2026-05-12 | Mechanical / HVAC | 1417 Dufossat St | REPLACE 5-TON HVAC SYSTEM | $27,738 |
| 26-11117-FGAS | 2026-04-22 | Mechanical / HVAC | 123 Walnut St Unit 8E | Only electric water heater | $9,470 |
| 26-11111-FGAS | 2026-04-21 | Mechanical / HVAC | 2100 Milan St Apt 2A | Only electric water heater | $48,800 |
| 26-11113-FGAS | 2026-04-21 | Mechanical / HVAC | 2100 Milan St Apt 2B | Only electric water heater | $48,800 |
| 26-11109-FGAS | 2026-04-21 | Mechanical / HVAC | 2100 Milan St Apt 1B | Only electric water heater | $48,800 |
| 26-11108-FGAS | 2026-04-21 | Mechanical / HVAC | 2100 Milan St Apt 1A | Only Electric water heater | $48,800 |
| 26-07047-RNVN | 2026-04-16 | General construction | 2718 Chartres St | Masonry restoration and cleaning of leaking parapet walls. Water proofing and ice/water shield. Install new metal parapet wall caps. To be done as per scope. | $33,304 |
| 26-10501-HVAC | 2026-04-15 | Mechanical / HVAC | 235 Atlantic Ave | Installation of two air handlers and two heat pump equipment. | $24,800 |
| 25-35949-RNVS | 2026-03-02 | General construction | 1417 Dufossat St | Conversion of existing attic space into new conditioned third floor living space, including construction of a new roof dormer. | $252,459 |
| 25-38129-SERV | 2026-01-06 | Electrical | 123 Walnut St Unit 8E | electrical renovations per drawings | $16,250 |
| 25-36922-HVAC | 2025-12-22 | Mechanical / HVAC | 2100 Milan St Apt 1A | Installation of new ducts. | $5,825 |
| 25-36924-HVAC | 2025-12-22 | Mechanical / HVAC | 2100 Milan St Apt 2A | Installation of new air ducts | $5,825 |
| 25-36923-HVAC | 2025-12-22 | Mechanical / HVAC | 2100 Milan St Apt 1B | Installation of new air ducts. | $5,825 |
| 25-36925-HVAC | 2025-12-22 | Mechanical / HVAC | 2100 Milan St Apt 2B | Installation of a new air handler and condenser. | $14,525 |
| 25-32926-SERV | 2025-12-01 | Electrical | 2100 Milan St Apt 1B | completely rewire apartment per drawings | $54,000 |
| 25-32932-SERV | 2025-12-01 | Electrical | 2100 Milan St HM | complete rewire per drawings | $54,000 |
| 25-32929-SERV | 2025-12-01 | Electrical | 2100 Milan St Apt 2B | completely rewire apartment per drawings | $54,000 |
| 25-32928-SERV | 2025-12-01 | Electrical | 2100 Milan St Apt 2A | completely rewire apartment per drawings | $54,000 |
| 25-32925-SERV | 2025-12-01 | Electrical | 2100 Milan St Apt 1A | completely rewire apartment per drawings | $54,000 |
| 25-27022-RNVN | 2025-11-06 | General construction | 123 Walnut St Unit 8E | non structural renovation of a condo unit as per scope attached. | $171,365 |
| 25-15110-RNVS | 2025-09-18 | General construction | 235 Atlantic Ave | Single family home renovation with camelback addition. *FINAL INSPECTION* FEMA EC BFE +7.53 | $469,822 |
| 25-24343-RNVN | 2025-09-04 | General construction | 4027 Delgado Dr | INTERIOR RENOVATION ON SECOND FLOOR OF PRIMARY BATH, GUEST BATH, & KITCHEN. NO NEW MECHANICAL EQUIPMENT. ALTERATIONS TO EXISTING PLUMBING AND ELECTRICAL WORK. NO CHANGE IN FOOTP | $149,101 |
| 25-11536-HVAC | 2025-04-17 | Mechanical / HVAC | 4220 Loyola Ave | Installation of a new furnace, evaporator coil and condenser. | $14,000 |
| 25-11538-HVAC | 2025-04-17 | Mechanical / HVAC | 4222 Loyola Ave | Installation of a new furnace, evaporator coil and condenser. | $9,300 |
| 24-11983-RNVN | 2025-04-03 | General construction | 2100 Milan St -HM | This is an interior renovation of 4 existing apartments, meeting the standards of the International Existing Building Code IEBC 2021 Level 2 Alteration (work area is less that 50% | $580,000 |
| 24-38436-RNVN | 2025-03-11 | General construction | 4220-4222 Loyola Ave | Interior renovation of an existing two family home. Renovations to consist of renovatiosn to the porch, cabinets, minor roofwork, flooring, painting, doors, HVAC, plumbing, and ele | $148,754 |
| 25-07002-HVAC | 2025-03-10 | Mechanical / HVAC | 5950 Memphis St | Installation of six new register and ducts. | $5,900 |
| 25-00331-FGAS | 2025-01-07 | Mechanical / HVAC | 5950 Memphis St | relocate gas meter and reset water heater | $17,600 |
| 24-35941-RNVS | 2024-12-23 | General construction | 5950 Memphis St | Construction of a 489SF interior addition 35Sf porch additiona, 144SF rear deck addition, and renovation to an 978SF existing single family home. To be built as per plans. *FINA | $368,922 |
| 24-35400-FGAS | 2024-12-10 | Mechanical / HVAC | 7401 Onyx St | Tankless water heater swap. No new gas pipe | $1,000 |
| 24-32189-HVAC | 2024-10-24 | Mechanical / HVAC | 717 Bellecastle St Apt A | Installation of a new mini - split system | $7,600 |
| 24-32190-HVAC | 2024-10-24 | Mechanical / HVAC | 717 Bellecastle St Apt B | Installation of a new air handler and condenser. | $9,400 |
| 24-25671-HVAC | 2024-10-10 | Mechanical / HVAC | 2007 Dauphine St | Installation of a new mini split and relocate existing condensers. | $7,600 |
| 24-15968-RNVN | 2024-10-01 | General construction | 2311 Oriole St | interior renovation as per the attached drawings. | $128,750 |
| 24-16522-RNVN | 2024-07-30 | General construction | 702 Independence St | Exterior repairs. Replace damaged weather board with Hardie Siding, left and right sides of the building only. Replace 6 windows. Paint. | $83,569 |
| 24-02533-RNVN | 2024-03-19 | General construction | 44 Gull St | Bathroom and living room renovation as per drawings | $200,639 |
| 24-06671-HVAC | 2024-03-18 | Mechanical / HVAC | 6401 Fontainebleau Dr | Installation of a new air handler, condenser and mini split system. Aditional 2 x 2 ton systems added | $12,300 |
| 24-02681-FGAS | 2024-01-31 | Mechanical / HVAC | 938 Touro St Apt 101 | Renovation of existing building 4 units Gas line and water heater | $3,200 |
| 23-09799-RNVS | 2023-10-04 | General construction | 7401 Onyx St | Renovation to existing single family home. Interior work to consist of kitchen millwork and finishes. Exterior work will be addition of new carport covering, re-cladding of secon | $742,068 |
| 23-03362-RNVS | 2023-06-14 | General construction | 820 Eighth St | Conditioned addition to the rear of existing structure. Work includes but is not limited to sitework, framing, siding, roofing, mechanical, electrical, plumbing, drywall and interi | $340,663 |
| 22-30611-RNVN | 2023-05-03 | General construction | 1607 Prytania St | Address HDLC violations to bring building into compliance: 1. Missing or deteriorated weatherboards. 2. Deteriorated or missing lashing at canopy and at metal addition. 3.Deteriora | $8,015 |
| 23-11454-FGAS | 2023-05-03 | Mechanical / HVAC | 311 Cherokee St | double being converted to single home. Total renovation | $19,100 |
| 20-38389-RNVN | 2022-10-12 | General construction | 3211 Napoleon Ave | RENOVATION OF EXISTING ATTIC INTO MASTER SUITE AS PER PLANS. NEW PLUMBING AND ELECTRICAL. MODIFY EXISTING HVAC AS REQUIRED. NEW WINDOW. NEW INTERIOR PAINT. | $82,000 |
| 21-30991-HVAC | 2021-11-04 | Mechanical / HVAC | 1401 S Carrollton Ave | Installation of Mitsubishi ductless unit with restroom exhaust fan. | $10,500 |
| 21-23953-FGAS | 2021-08-27 | Mechanical / HVAC | 2808 Fourth St | 2nd floor added. Electric tankless water heater only | $5,400 |
| 21-23955-FGAS | 2021-08-23 | Mechanical / HVAC | 2501 Desire St | Electric water heater | $6,300 |
| 21-23983-HVAC | 2021-08-23 | Mechanical / HVAC | 2505 Desire St | Install a 2 ton electric a/c system complete with duct, dampers etc. Kitchen hood included. | $5,500 |
| 21-23957-FGAS | 2021-08-23 | Mechanical / HVAC | 2505 Desire St | New electric water heater | $6,300 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New Orleans permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
