COMPANY RECORD · NEW ORLEANS, LA
Jay Dove Group Inc — permit history in New Orleans, LA
Jay Dove Group Inc appears on 96 New Orleans permit records from 2015 through 2026, most often general construction (79.2% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 76 | 79.2% |
| Electrical | 12 | 12.5% |
| Mechanical / HVAC | 8 | 8.3% |
3 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 1 |
| 2016 | 9 |
| 2017 | 7 |
| 2018 | 2 |
| 2019 | 3 |
| 2020 | 4 |
| 2021 | 7 |
| 2022 | 23 |
| 2023 | 26 |
| 2024 | 4 |
| 2025 | 4 |
| 2026 | 6 |
Busiest year on record: 2023, with 26 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 3146 N Tonti St | 2026-08-17 |
| 4718 Stephen Girard Ave | 2026-06-17 |
| 37 Kings Canyon Dr | 2026-03-03 |
| 4832 Ray Ave | 2026-03-03 |
| 6125 Law St | 2026-03-03 |
| 2525 S Miro St, 3603 Third St New Orleans, LA 70125 | 2026-02-02 |
| 2009 Governor Nicholls St | 2025-07-14 |
| 1966 N Galvez St Apt A | 2025-04-21 |
| 1966 N Galvez St Apt C | 2025-04-21 |
| 2200 Simon Bolivar Ave | 2025-02-19 |
| 1966 N Galvez St -Apt C | 2024-06-03 |
| 2629-2631 Deers St | 2024-05-08 |
| 128 Alden Pl | 2024-04-02 |
| 13024 Biscay St | 2023-07-28 |
88 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $184,275, median $11,138. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
96 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 26-23918-SERV | 2026-08-17 | Electrical | 3146 N Tonti St | Rough-in permit expired 20-21669-SERV. Need final electrical to new construction permit 19-15503-RNVS. | $7,000 |
| 26-11237-RNVN | 2026-06-17 | General construction | 4718 Stephen Girard Ave | Perform non-structural renovation shingle replacement, wire repair, HVAC, plumbing & electrical fixture updates, drywall, paint, trim and flooring. | $68,839 |
| 25-34263-RNVS | 2026-03-03 | General construction | 37 Kings Canyon Dr | Repair fire damage with ceiling rafters and stud framing, roof replacement, exterior brick, wire repair, drywall, paint and trim. | $184,275 |
| 26-00008-RNVN | 2026-03-03 | General construction | 4832 Ray Ave | Repair exterior siding at the rear unit, replace roofing shingles and paint exterior structure and interior walls, trim and doors of the rear unit. | $16,825 |
| 25-39310-SERV | 2026-03-03 | Electrical | 6125 Law St | Install 200A electrical service and 20 circuits on new construction | $10,374 |
| 25-39687-SERV | 2026-02-02 | Electrical | 2525 S Miro St, 3603 Third St New Orleans, LA 70125 | Complete an electrical rough-in, trim out and service for two units on an existing structure. | $18,200 |
| 25-20954-ERPR | 2025-07-14 | Electrical | 2009 Governor Nicholls St | Replace old receptacles, switches and light fixtures. | $1,200 |
| 25-11799-FGAS | 2025-04-21 | Mechanical / HVAC | 1966 N Galvez St Apt A | Gas meter 6 months vacancy pressure test. | $550 |
| 25-11797-FGAS | 2025-04-21 | Mechanical / HVAC | 1966 N Galvez St Apt C | Run gas line for stove and dryer connections due to unrelated fire.pressure test | $1,500 |
| 24-23469-ACCS | 2025-02-19 | General construction | 2200 Simon Bolivar Ave | Install a 60kW natural gas standby generator. Permit extended (1) 180 day period until August 19, 2026 | $12,923 |
| 24-37224-HVAC | 2024-12-13 | Mechanical / HVAC | 1966 N Galvez St Apt C | Installing (1) 1Ton Gas Heater, coil & condenser, vented dryer and (1) vented bathroom exhaust fan due to fire damage. | $3,549 |
| 24-01039-RNVS | 2024-06-03 | General construction | 1966 N Galvez St -Apt C | Renovate APT A Unit due to fire damage with new foundation and piers, framing, roof, interior and exterior according to construction plans | $73,852 |
| 23-25425-RNVS | 2024-05-08 | General construction | 2629-2631 Deers St | Remove and replace exterior siding and plywood. R&R insulation, drywall and trim on exterior walls only due to water damage. Paint all interior walls, trim and doors. electrical, | $35,667 |
| 24-06642-RNVN | 2024-04-02 | General construction | 128 Alden Pl | Remove and replace exterior aluminum siding with vinyl siding. Paint exterior windows. Repair two drywall spots. Non structural | $8,219 |
| 23-19423-ACCS | 2023-07-28 | General construction | 13024 Biscay St | Install a natural gas 18kW standby generator | $12,939 |
| 23-19428-ACCS | 2023-07-28 | General construction | 526 Huntlee Dr | Install a natural gas 18kW standby generator | $12,850 |
| 23-15405-ACCS | 2023-07-11 | General construction | 7630 Hayne Blvd | Install a 22kW standby Natural Gas generator. Ni digging allowed under this permit. | $14,036 |
| 23-18302-FGAS | 2023-07-10 | Mechanical / HVAC | 8415 Sycamore St | Run a natural gas line to a 18kW standby generator | $3,290 |
| 23-17065-ACCS | 2023-07-10 | General construction | 3559 Fairmont Dr | Install a 24kW Generac natual gas standby generator Carbon monoxide detectors to be installed in every bedroom and living room. | $13,432 |
| 23-17068-ACCS | 2023-07-10 | General construction | 425 Emerald St | Install a 24kW Generac natual gas standby generator. No digging allowed. Carbon monoxide detectors to be installed in every bedroom and living room. | $13,653 |
| 23-18301-FGAS | 2023-07-10 | Mechanical / HVAC | 5820 Wright Rd | Run Natural Gas line to a standby generator | $2,790 |
| 23-16501-ACCS | 2023-07-05 | General construction | 5820 Wright Rd | Install a 24kW natural gas Generac standby generator | $13,432 |
| 23-16530-ACCS | 2023-07-05 | General construction | 8415 Sycamore St | Install an 18kW Generac standby generator | $13,957 |
| 23-14350-ACCS | 2023-06-08 | General construction | 2323 General Pershing St | Install a 18kw standby generator | $13,669 |
| 23-05922-ACCS | 2023-04-04 | General construction | 4615 De Montluzin St | Install a 24kW natural gas standby generator 10' away from the house and 24" above concrete base | $10,802 |
| 23-05926-ACCS | 2023-04-04 | General construction | 2820 Coliseum St | Install a 24kW Generac natural gas standby generator. | $10,802 |
| 23-05865-FGAS | 2023-03-13 | Mechanical / HVAC | 10905 S Hardy St | Route Natural Gas line to generator. | $1,810 |
| 23-03442-ACCS | 2023-03-03 | General construction | 10905 S Hardy St | Install an ATS and a standby generator | $10,802 |
| 23-03354-ACCS | 2023-02-27 | General construction | 13 Park Island Dr | Install a 30kW standby generator with gas line and electrical line. | $12,398 |
| 22-37624-ACCS | 2023-02-06 | General construction | 3600 Red Oak Ct | Install a 24kW standby Generator NO DIGGING | $12,283 |
| 23-00967-ACCS | 2023-01-26 | General construction | 4941 Elysian Fields Ave | Install 22kW standby generator | $10,832 |
| 23-01633-FGAS | 2023-01-25 | Mechanical / HVAC | 3651 White Oak Ave | Install gas line to permanent generator | $2,310 |
| 23-01621-FGAS | 2023-01-25 | Mechanical / HVAC | 23 Olympic Ct | Install gas line to permanent generator | $1,810 |
| 22-37621-ACCS | 2023-01-18 | General construction | 26 Yosemite Dr | Install a standby generator | $11,575 |
| 22-19140-ACCS | 2023-01-18 | General construction | 546 Vallette St | Install Natural Gas Generac Generator 18" above ground on a stand. | $11,378 |
| 22-37623-ACCS | 2023-01-18 | General construction | 3651 White Oak Ave | Install Standby Generator | $12,099 |
| 22-37671-ACCS | 2023-01-12 | General construction | 23 Olympic Ct | Install 24kW standby generator | $11,024 |
| 22-37535-ACCS | 2023-01-12 | General construction | 4610 Laurel St | Install ATS and Standby Generator. No digginh allowed. | $13,159 |
| 22-32888-ACCS | 2023-01-08 | General construction | 3500 Bruxelles St | Install an ATS and a permanent 18kW generator | $11,138 |
| 22-35956-ACCS | 2023-01-03 | General construction | 4442 Stephen Girard Ave | Install a standby generator | $11,883 |
| 22-33089-ACCS | 2022-11-16 | General construction | 5820 Kensington Blvd | Install an ATS and wire for a permanent generator. | $12,067 |
| 22-19907-ACCS | 2022-10-28 | General construction | 4632 Franklin Ave | Install Natural Gas Generac Generator 25" above ground on a stand. | $11,138 |
| 22-18752-ACCS | 2022-10-28 | General construction | 3532 Pin Oak Ave | Install Natural Gas Generac Generator 12" above ground on a stand. | $10,802 |
| 22-19908-ACCS | 2022-10-04 | General construction | 4004 Virgil Blvd | Install Natural Gas Generac Generator 18" above ground on a stand. | $11,138 |
| 22-18890-ACCS | 2022-09-08 | General construction | 19 Admiralty Ct | Install Natural Gas Generac Generator 24" above ground on a stand. | $11,138 |
| 22-11543-ACCS | 2022-09-08 | General construction | 8733 S Claiborne Ave | Install Natural Gas Generac Generator 10' above ground on an existing steel platform. | $24,189 |
| 22-22939-ACCS | 2022-09-08 | General construction | 2427 Valence St | Install 22kW Natural Gas Generac Generator 36" above ground on a stand. | $11,138 |
| 22-22938-ACCS | 2022-08-25 | General construction | 2232 First St | Install 24kW Natural Gas Generac Generator 24" above ground on a stand. | $11,138 |
| 22-19906-ACCS | 2022-07-23 | General construction | 4818 Bright Dr | Install Natural Gas Generac Generator 18" above ground on a stand. | $10,802 |
| 22-19911-ACCS | 2022-07-22 | General construction | 8500 Forshey St | Install Natural Gas Generac Generator 66" above ground on a stand. | $11,138 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New Orleans permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →