COMPANY RECORD · NEW ORLEANS, LA

Igor Fernandes Miranda — permit history in New Orleans, LA

Igor Fernandes Miranda appears on 86 New Orleans permit records from 2025 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical86100%

Activity by year

YearPermits issued
202551
202635

Busiest year on record: 2025, with 51 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
5757 Warrington Dr2026-08-24
1853 Pratt Dr2026-08-13
1494 Madrid St2026-08-13
1329 Mandeville St2026-08-11
925 Upperline St2026-08-05
4934 Magazine St2026-07-16
4301 Fontainebleau Dr2026-07-16
538 Second St2026-07-01
1459 Mithra St2026-06-13
2847 Chippewa St2026-06-08
1245 Gardena Dr2026-05-28
1331 Mandeville St2026-05-12
318 Lake Marina Ave Unit 1112026-05-11
1723 Monroe St2026-05-11

53 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $100 to $26,000, median $7,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

86 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
26-24161-LOOP2026-08-24Electrical5757 Warrington DrTemporary power or construction site$4,000
26-24159-SERV2026-08-24Electrical5757 Warrington DrWire a new construction single family home 15 new circuits and 200 amps$4,000
26-23625-SERV2026-08-13Electrical1853 Pratt DrWire a single family new construction$13,000
26-23624-LOOP2026-08-13Electrical1853 Pratt DrTemporary power for a residential new construction site$13,000
26-23623-SERV2026-08-13Electrical1494 Madrid Stwire a new construction home$7,000
26-23622-LOOP2026-08-13Electrical1494 Madrid StTemporary power for a new construction site$7,000
26-23075-SERV2026-08-11Electrical1329 Mandeville StRemove wires damaged for fire, re wire according the code book For 1329 Mandeville St$3,000
26-22332-LOOP2026-08-05Electrical925 Upperline StTemporary pole for construction site$26,000
26-22333-SERV2026-08-05Electrical925 Upperline Stwire a full renovation home 20 new circuits and 200 amps$26,000
26-20453-LOOP2026-07-16Electrical4934 Magazine StTemporary power for a renovation $1,200
26-20347-SERV2026-07-16Electrical4301 Fontainebleau DrWire a new construction single home 20 new circuits and 200 amp for 4301 Fontainebleau Dr$16,000
26-18808-LOOP2026-07-01Electrical538 Second StTemporary power for demo and renovation$200
26-17154-LOOP2026-06-13Electrical1459 Mithra StTemporary power for construction site $16,500
26-17155-SERV2026-06-13Electrical1459 Mithra StWire a new construction home $16,500
26-16664-LOOP2026-06-08Electrical2847 Chippewa StTemporary power for a demolition and full renovation later$9,500
26-15635-SERV2026-05-28Electrical1245 Gardena DrWire a new construction residential $8,200
26-15634-LOOP2026-05-27Electrical1245 Gardena DrTemporary power for construction of a new residencia $8,200
26-14134-EVAC2026-05-12Electrical1331 Mandeville StNeed to connect power back on, tenant was out for 1year$100
26-13534-SERV2026-05-11Electrical318 Lake Marina Ave Unit 111Wire a full renovation apartment according with new code$4,000
26-12770-LOOP2026-05-11Electrical1723 Monroe StTemporary power for new construction$12,000
26-12771-SERV2026-05-11Electrical1723 Monroe StWire a new construction home single family$12,000
26-14138-LOOP2026-05-11Electrical1725 Paul Morphy StFinish a new construction home $4,000
26-14140-SERV2026-05-11Electrical1725 Paul Morphy StWire a new construction and finish some area where was already done a long ago$4,000
26-07808-SERV2026-04-28Electrical1040 Cadiz StFull electric renovation, all wire and code update. Changing a 3plex electric to a single house $18,000
26-07642-SERV2026-04-27Electrical8714 Belfast StWire a new construction house $9,000
26-10076-LOOP2026-04-09Electrical1622 Paul Morphy StTemporary power for a full renovation home $600
26-07806-LOOP2026-03-18Electrical1040 Cadiz StTemporary power for a renovation house$500
26-07640-LOOP2026-03-16Electrical8714 Belfast StTemporary power for a new construction house$500
26-04226-SERV2026-03-15Electrical5719 Paris AveWire a new construction residential home$13,000
26-05642-SERV2026-03-03Electrical6038 Catina StWire a garage porch, separate from the main house. 1 circuit 20AMP 6 can lights 2 outlets $600
26-04225-LOOP2026-02-13Electrical5719 Paris AveTemporary power for a new construction site$13,000
26-02092-SERV2026-02-03Electrical2701 Joseph StRenovation of a bathroom, add cans and a exhauster fan add a circuit for the GFCI$1,800
25-36286-SERV2026-01-15Electrical2634 New Orleans Stwire a new duplex home $7,000
26-00687-LOOP2026-01-11Electrical1608 King DrTemporary power for a new construction site$200
26-00689-SERV2026-01-11Electrical1608 King DrWire a new construction home 2 stores$13,000
25-39162-SERV2025-12-22Electrical5635 Chamberlain Drwire a new construction home according to the code $21,000
25-39159-LOOP2025-12-22Electrical5635 Chamberlain DrTemporary power during a new construction$21,000
25-36859-SERV2025-12-18Electrical3243 Ponce De Leon Stwire a renovation home and add new circuits for the add parts add it the renovation, change the breaker box $15,000
25-36287-SERV2025-12-03Electrical2636 New Orleans Stwire a new duplex home Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certi$7,000
25-36289-SERV2025-12-03Electrical2632 New Orleans Stwire anew duplex home Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certif$7,000
25-36288-SERV2025-12-03Electrical2630 New Orleans Stwire a new duplex home$7,000
25-36285-SERV2025-12-03Electrical1904 N Tonti Stwire a new duplex home Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a cert$7,000
25-36296-SERV2025-11-21Electrical5319 Marigny Stwire a single family new construction home $9,500
25-36294-LOOP2025-11-21Electrical5319 Marigny StTemporary power for a new construction $1,500
25-36280-LOOP2025-11-21Electrical2634 New Orleans StTemporary power for a new construction $7,000
25-36278-LOOP2025-11-21Electrical2630 New Orleans StTemporary power for a new construction $7,000
25-36281-LOOP2025-11-21Electrical1902 N Tonti StTemporary power for a new construction $7,000
25-36284-SERV2025-11-21Electrical1902 N Tonti StWire a new duple home $7,000
25-34908-SERV2025-11-10Electrical601 Eighth Stfull renovation, wires and breaker box add some lights on interior and exterior of the building$6,000
25-34145-SERV2025-11-04Electrical1023 Ninth Stwire a full electric renovation home Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issua$13,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New Orleans permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →