COMPANY RECORD · NEW ORLEANS, LA

Ali Hussein Bazzi — permit history in New Orleans, LA

Ali Hussein Bazzi appears on 102 New Orleans permit records from 2023 through 2026, most often electrical (70.6% of the record).

Permit categories

CategoryPermitsShare
Electrical7270.6%
Mechanical / HVAC2726.5%
General construction32.9%

3 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
202311
202481
20258
20262

Busiest year on record: 2024, with 81 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
503 Red Allen Way2026-04-13
501 Red Allen Way2026-04-13
2435 Touro St2025-10-20
2437 Touro St2025-10-20
13552 Granville St2025-04-21
13550 Granville St2025-04-10
1222 Baronne St2025-04-10
1810 Governor Nicholls St2025-03-13
1812 Governor Nicholls St2025-03-13
2630 Ursulines Ave2025-02-07
27 Newcomb Blvd2024-12-16
4901 Lurline St2024-11-18
1900 Pace Blvd Apt A2024-09-26
4340 Sybil St2024-09-25

79 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $32,600, median $1,725. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

102 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
26-10519-HVAC2026-04-13Mechanical / HVAC503 Red Allen WayInstall HVAC System 1- 2.5 ton system with OXBOX equipment. The rough-in phase involves placing line sets, ducts, vents, and registers to facilitate air circulation and temperatur$2,200
26-10518-HVAC2026-04-13Mechanical / HVAC501 Red Allen WayInstall HVAC System 1- 2 ton system, and 1- 2.5 ton system with OXBOX equipment. The rough-in phase involves placing line sets, ducts, vents, and registers to facilitate air circu$2,000
25-29415-SERV2025-10-20Electrical2435 Touro StInstall new lighting fixtures, updated outlets/switches, Cabinet lighting, Ceiling fans. Light Remodel work. Exceeding the scope of the permit or failure to obtain the proper bu$1,200
25-28551-SERV2025-10-20Electrical2437 Touro StInstall new 125 amp panel. Install new lighting fixtures, updated outlets/switches, Cabinet lighting, Ceiling fans. Light Remodel work.$1,400
25-05530-SERV2025-04-21Electrical13552 Granville StRough in and Electrical trim out. The rough-in phase includes the installation of electrical wiring, conduits, and boxes according to the building's blueprint and local electrical $1,400
25-05529-SERV2025-04-10Electrical13550 Granville StRough in and Electrical trim out. The rough-in phase includes the installation of electrical wiring, conduits, and boxes according to the building's blueprint and local electrical $1,400
25-08309-SERV2025-04-10Electrical1222 Baronne StElectrical Rough in and trim out$1,800
25-07802-HVAC2025-03-13Mechanical / HVAC1810 Governor Nicholls StInstall two 2 1/2 one 5 and 3 ton electric systems. This includes air handles, heat stripes, condenser, copper, and all ductwork. All grills and thermostats are available upon co$32,600
25-07806-HVAC2025-03-13Mechanical / HVAC1812 Governor Nicholls StInstall two 2 1/2, one 5, and one 3 ton electric systems. This includes air handles, heat stripes, condenser, copper, and all ductwork. All grills and thermostats are available $32,600
24-37362-HVAC2025-02-07Mechanical / HVAC2630 Ursulines AveInstall HVAC for house being remodeled. Take over Job. Three zone system consisting of 3 ton, and one 4 ton YORK 14 SEER equipment sets with electric air handlers. Rough in phase i$2,000
24-37358-LOOP2024-12-16Electrical27 Newcomb BlvdFurnish and install temp pole$650
24-34396-SERV2024-11-18Electrical4901 Lurline St The rough-in phase includes the installation of electrical wiring, conduits, and boxes according to the building's blueprint and local electrical codes. The trim-out phase focuses$2,200
24-34397-LOOP2024-11-18Electrical4901 Lurline StFurnish and install temp pole for jobsite power.$550
24-34387-HVAC2024-11-16Mechanical / HVAC4901 Lurline StInstall HVAC System 4 ton system. The rough-in phase involves placing line sets, ducts, vents, and registers to facilitate air circulation and temperature control in each zone. The$2,800
24-27602-EVAC2024-09-26Electrical1900 Pace Blvd Apt AElectrical vacancy service, Inspect all facets of electrical system. Replace 3 outlets.$700
24-28639-SERV2024-09-25Electrical4340 Sybil StRough-in and trim-out for a house being remodeled.$1,400
24-28983-HVAC2024-09-24Mechanical / HVAC4340 Sybil StInstall Hvac System . Single zone 3 ton system with LUXAIRE equipment. The rough-in phase involves placing ductwork, vents, and registers to facilitate air circulation and temper$1,800
24-28996-HVAC2024-09-24Mechanical / HVAC1228 Conery StInstall Hvac System . single zone 3 ton system with LUXAIRE equipment. The rough-in phase involves placing ductwork, vents, and registers to facilitate air circulation and temperat$1,500
24-28302-LOOP2024-09-17Electrical1100 Ursulines AveFurnish and install temp pole for jobsite power.$550
24-28301-SERV2024-09-17Electrical1100 Ursulines AveThe scope of the electrical section involves the rough-in and trim-out for a building being remodeled with a 225 amp service$1,900
24-27615-ERPR2024-09-16Electrical4500 S Galvez StThe scope of the electrical section involves the remodel of a pool. Remove old lights and install new pool lights.$700
24-27421-VCPNT2024-09-06General construction840 Ursulines AveALL COLORT TO MACH EXISTING $0
24-27418-HVAC2024-09-06Mechanical / HVAC9400 Oleander StInstall Hvac. 4 ton York system. Rough-in phase involves placing ductwork, vents, and registers to facilitate air circulation and temperature control in each zone. The trim-out p$2,700
24-19464-SERV2024-08-21Electrical2300 Fats Domino AveThe scope of the electrical section involves the rough-in and trim-out for a New Construction house. The rough-in phase includes the installation of electrical wiring, conduits, an$2,700
24-25375-HVAC2024-08-19Mechanical / HVAC8803 Dinkins StInstall Hvac. 4 ton York system. Rough-in phase involves placing ductwork, vents, and registers to facilitate air circulation and temperature control in each zone. The trim-out p$2,000
24-20010-SERV2024-08-12Electrical3738 Calhoun StRough-in and trim-out for a New Construction house. The rough-in phase includes the installation of electrical wiring, conduits, and boxes according to the building's blueprint and$2,100
24-20009-SERV2024-08-12Electrical521 Valmont StRough-in and trim-out for a New Construction house. The rough-in phase includes the installation of electrical wiring, conduits, and boxes according to the building's blueprint and$2,400
24-18921-SERV2024-08-09Electrical11335 Prentiss AveRough-in and trim-out for a New Construction house. The rough-in phase includes the installation of electrical wiring, conduits, and boxes according to the building's blueprint and$2,600
24-24206-SERV2024-08-08Electrical601 Eighth St Apt 2AThe scope of the electrical section involves the rough-in and trim-out for a house being remodeled. The rough-in phase includes the installation of electrical wiring, conduits, and$1,500
24-20787-SERV2024-08-07Electrical27 Newcomb BlvdThe scope of the electrical section involves the rough-in and trim-out for a house being remodeled. The rough-in phase includes the installation of electrical wiring, conduits, and$1,600
24-18901-SERV2024-08-07Electrical3138 Toulouse StInstall new wire for new electric air handler. Install 2 new circuits and overhead can lighting in ceiling. Install GFCI outlets.$1,100
24-22570-SERV2024-08-06Electrical4920 Prytania StThe scope of the electrical section involves the rough-in and trim-out for a Restaurant remodel. The rough-in phase includes the installation of electrical wiring, conduits, and bo$2,200
24-24009-HVAC2024-08-06Mechanical / HVAC4962 Kendall DrInstall HVAC System. 5 ton Lennox Equipment rough-in phase involves placing ductwork, vents, and registers to facilitate air circulation and temperature control in each zone. The$1,500
24-22722-HVAC2024-08-05Mechanical / HVAC620 S Tonti StInstall Hvac System in DUPLEX 12 mini splits total, six in each unit. The rough-in phase involves placing line sets, vents, and registers to facilitate air circulation and temper$1,500
24-22724-HVAC2024-08-05Mechanical / HVAC618 S Tonti StInstall Hvac System in DUPLEX 12 mini splits total, six in each unit. The rough-in phase involves placing line sets, vents, and registers to facilitate air circulation and temper$1,500
24-22572-ERPR2024-08-05Electrical6974 Argonne BlvdThe scope of the electrical section involves the remodel of a pool. Remove old lights and install new pool lights.$850
24-18923-SERV2024-08-01Electrical601 Eighth St Apt 2BRough-in and trim-out for a house being remodeled. The rough-in phase includes the installation of electrical wiring, conduits, and boxes according to the building's blueprint and $1,750
24-23334-SERV2024-08-01Electrical1726 Clio StThe scope of the electrical section involves the rough-in and trim-out for a laundry room being added, and changing lighting fixtures on the interior.$1,100
24-19305-SERV2024-07-30Electrical2202 Adams StInstall new 200 amp overhead service. includes the installation of electrical panel, electrical wiring, running conduit, according to the local electrical codes. $1,350
24-19302-SERV2024-07-30Electrical1324 Baronne StRough-in and trim-out for a New Construction house. The rough-in phase includes the installation of electrical wiring, conduits, and boxes according to the building's blueprint and$3,200
24-19303-SERV2024-07-30Electrical1300 Baronne StRough-in and trim-out for a New Construction house. The rough-in phase includes the installation of electrical wiring, conduits, and boxes according to the building's blueprint and$3,200
24-22571-HVAC2024-07-23Mechanical / HVAC4743 Bundy RdInstall Hvac System . Single zone 4 ton system. The rough-in phase involves placing ductwork, vents, and registers to facilitate air circulation and temperature control in each zon$2,400
24-18930-SERV2024-07-16Electrical2437 New Orleans StRough-in and trim-out for a house being remodeled . The rough-in phase includes the installation of electrical wiring, conduits, and boxes according to the building's blueprint and$1,900
24-18931-SERV2024-07-16Electrical2435 New Orleans StRough-in and trim-out for a house being remodeled . The rough-in phase includes the installation of electrical wiring, conduits, and boxes according to the building's blueprint and$1,900
24-20770-HVAC2024-07-10Mechanical / HVAC3738 Calhoun StThe HVAC scope includes the installation of a Single zone system with 5-ton Lennox equipment. The rough-in phase involves placing ductwork, vents, and registers to facilitate air$1,700
24-17918-EVAC2024-07-10Electrical3140 Toulouse StElectrical vacancy service on 3140 Toulouse St, Inspect all facets of electrical system. Install conduit, Replace outlets, install GFCI in kitchen and bathroom, install can ligh$1,400
24-19466-HVAC2024-07-08Mechanical / HVAC2300 Fats Domino AveInstall HVAC System . Single zone system. The rough-in phase involves placing ductwork, vents, and registers to facilitate air circulation and temperature control in each zone. Th$2,500
24-18922-HVAC2024-07-08Mechanical / HVAC11335 Prentiss AveInstall HVAC System . Single zone 3-1/2 ton system. The rough-in phase involves placing ductwork, vents, and registers to facilitate air circulation and temperature control in $2,100
24-18926-HVAC2024-07-08Mechanical / HVAC2435 New Orleans StInstall Hvac System . Single zone 3 ton system. The rough-in phase involves placing ductwork, vents, and registers to facilitate air circulation and temperature control in each $1,700
24-18927-HVAC2024-07-08Mechanical / HVAC2437 New Orleans StInstall Hvac System . Single zone 3 ton system. The rough-in phase involves placing ductwork, vents, and registers to facilitate air circulation and temperature control in each z$1,700

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New Orleans permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →