COMPANY RECORD · NORMAL, IL

Zeller Electric, Inc. — permit history in Normal, IL

Zeller Electric, Inc. appears on 66 Normal permit records from 2021 through 2026, most often electrical (97% of the record).

Permit categories

CategoryPermitsShare
Electrical6497%
General construction23%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20219
202214
202312
20249
202517
20265

Busiest year on record: 2025, with 17 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
100 N Rivian Mtwy NN2 Tnader2026-07-16
100 N Rivian Mtwy2026-06-18
201 Centennial Ave2026-04-01
1707 Ebel Dr2026-03-19
2221 W College Ave2026-02-04
1208 Liberty Rd2025-11-17
6 Traders Cir2025-10-27
1500 W Raab Rd2025-10-22
303 Grandview Dr2025-10-14
351 S School St2025-10-09
121 N Rivian Mtwy2025-10-06
910 S Cottage Ave2025-09-19
1506 Belleck Ct2025-07-17
3089 Blue Heron Rd2025-06-13

45 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,920 to $7,800,000, median $19,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

66 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
ELEC2026-40202026-07-16Electrical100 N Rivian Mtwy NN2 TnaderRivian NN2 Rebuild Project Resilience$1,413,468
ELEC2026-37612026-06-18Electrical100 N Rivian MtwyRivian NN2 EOL Temporary Paint Booth$27,761
ELEC2026-28612026-04-01Electrical201 Centennial AveMeter Adapter/Service Conductor Refeed/Main Panel Replaceme$4,850
ELEC2026-27152026-03-19Electrical1707 Ebel DrAdapter/Service Conductor Refeed/Other + Trenching$6,200
ELEC2026-22652026-02-04Electrical2221 W College AveData, lab equipment wiring, $18,000
ELEC2025-55312025-11-17Electrical1208 Liberty RdInstallation of EV charger$3,869
ELEC2025-51512025-10-27Electrical6 Traders CirInstallation of EV chargers$39,550
ELEC2025-52342025-10-22Electrical1500 W Raab RdInstallation of a new PV Array for Heartland College$1,600,000
ELEC2025-50702025-10-14Electrical303 Grandview DrUpgrade service to a 200A service with a 200A 40 space panel$4,500
ELEC2025-50642025-10-09Electrical351 S School Sttemporary service$2,500
ELEC2025-49342025-10-06Electrical121 N Rivian MtwyRivian Suite 2 OPmobility Server Room$80,500
ELEC2025-47242025-09-19Electrical910 S Cottage AveMeter Adapter/Service Conductor Refeed/Main Panel Replacemen$3,607
ELEC2025-39032025-07-17Electrical1506 Belleck CtInstall customer supplied EV charging station$11,323
ELEC2025-36342025-07-02Electrical100 N Rivian MtwyData center expansion at Rivian.$574,000
ELEC2025-36512025-07-02ElectricalTemp Power at Rivan Concrete Strategies Trailer$2,000
ELEC2025-34242025-06-13Electrical3089 Blue Heron RdAdding EV Charger$3,800
ELEC2025-31692025-05-27Electrical1508 Vermillion WayHCC – WDC Counseling & E-Sports Renovations$474,870
ELEC2025-31702025-05-27Electrical1508 Vermillion WayHCC – ICN Labs and Classrooms Renovations$485,735
ELEC2025-31502025-05-16Electrical1500 Airport RdDemo Light Fixtures, Install Receptacles, Install Data Ports$13,163
ELEC2025-26082025-03-25Electrical752 Canyon Creek RdInstalling EV Charger$1,920
ELEC2025-21622025-03-25Electrical121 N Rivian MtwyTemporary Service for GRIT$20,000
ELEC2025-25452025-03-14Electrical121 N Rivian MtwyRivian Project Grit Base Build$7,800,000
ELEC2024-50342024-12-04Electrical1501 Mercy Creek DrMercy Creek ALMC Interior Renovation$163,818
ELEC2024-49382024-11-06Electrical1502 Maplewood DrInstalling EV Charger$3,610
ELEC2024-44432024-09-10Electrical310 Garden RdService Upgrade$4,000
ELEC2024-34002024-05-30Electrical1205 N School StService upgrade.$3,500
ELEC2024-33132024-05-20Electrical2000 Jacobssen DrLighting and receptacle additions/remodel.$14,135
ELEC2024-29182024-04-11Electrical100 N Rivian MtwyRivian Paint Air Lock$106,496
ELEC2024-28322024-04-09Electrical308 Landmark Dr40kW roof-mounted solar array$26,629
ELEC2024-28842024-04-08Electrical1412 S Main StReplace existing 3 Meter Socket$2,000
ELEC2024-25652024-03-08Electrical10 Turner RdService upgrade.$4,500
ELEC2023-47322023-09-22Electrical1500 W Raab Rd Lab RenoHeartland College Lab Renovations$349,900
ELEC2023-44782023-08-29Electrical3 Gary CtReplace residential service$9,700
ELEC2023-44092023-08-24Electrical1224 W College AveRelocate electrical panel. Add main breaker enclosure.$8,325
ELEC2023-42982023-08-15Electrical309 Orlando AveReplace 8x8 meter with new 125/100A meter/ main panel,$4,525
ELEC2023-34842023-06-06Electrical1607 Ensign DrMain panel to be changed out for one with a larger bus and s$3,750
ELEC2023-33512023-05-23Electrical100 N Rivian MtwyRivian NC2 Network Center Project$307,950
ELEC2023-25632023-03-06Electrical1200 Granite WayInstallation of a 9.28 kW roof mounted solar array$13,982
ELEC2023-25242023-02-24Electrical900 Fairchild AveUpgrade service to 200A$5,000
ELEC2023-22402023-02-02Electrical2330 Holbrook DrInstallation of a 6.98kW roof mount solar array$6,962
ELEC2023-22662023-01-31Electrical2005 Jacobssen DrSpringfield Clinic Normal Peds Phase 3$129,895
ELEC2023-21432023-01-13Electrical100 N Rivian MtwyRivian EOL Paint Repair Booth$25,000
ELEC2023-21202023-01-13Electrical1713 Fort Jesse RdOffice Remodel$27,003
ELEC2022-49742022-11-09Electrical2005 Jacobssen DrSpringfield Clinic Normal Peds Phase 2$219,890
BLDR2022-47662022-10-26General construction403 Northridge Estates CC CtInstallation of a 6.96kW roof mount solar system.$27,255
ELEC2022-47682022-10-17Electrical403 Northridge Estates CC CtInstallation of a 6.96kW roof mount solar system.$10,957
BLDR2022-44662022-09-27General construction2340 Holbrook DrInstallation of a 5.235kW roof mount solar system.$15,707
ELEC2022-44652022-09-19Electrical2340 Holbrook DrInstallation of a 5.235kW roof mount solar system.$6,116
ELEC2022-42272022-08-24Electrical2005 Jacobssen DrSpringfield Clinic Normal Peds$89,990
ELEC2022-39202022-08-16Electrical2000 Jacobssen DrMarcFirst$23,650

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Normal permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →