COMPANY RECORD · NORMAL, IL
Remodeling Solutions LLC DBA Re-Bath Of Illinois — permit history in Normal, IL
Remodeling Solutions LLC DBA Re-Bath Of Illinois appears on 119 Normal permit records from 2021 through 2026, most often plumbing (50.4% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 60 | 50.4% |
| General construction | 59 | 49.6% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 38 |
| 2022 | 11 |
| 2023 | 10 |
| 2024 | 13 |
| 2025 | 27 |
| 2026 | 20 |
Busiest year on record: 2021, with 38 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 20 Linda Ln | 2026-07-21 |
| 1102 N Linden St | 2026-06-23 |
| 24 Brookwood Dr | 2026-05-21 |
| 1104 Pine Meadows Ct | 2026-05-13 |
| 907 Charlotte Dr | 2026-03-31 |
| 220 Orlando Ave | 2026-03-12 |
| 417 Warren Ave | 2026-02-27 |
| 1406 Henry St | 2026-02-26 |
| 1002 Bakewell Ave | 2026-02-26 |
| 2700 Limestone Ct | 2026-02-25 |
| 1307 Spear Dr | 2026-01-07 |
| 733 Hale St | 2025-10-31 |
| 2141 Elwood Ln | 2025-10-31 |
| 21 Broadway Pl | 2025-09-29 |
65 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $600 to $48,000, median $12,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
119 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| PLMBG2026-4079 | 2026-07-21 | Plumbing | 20 Linda Ln | Tub to Shower Base Conversion - | $4,973 |
| PLMBG2026-3798 | 2026-06-23 | Plumbing | 1102 N Linden St | Tub to Tub Conversion | $1,222 |
| BLDR2026-3799 | 2026-06-23 | General construction | 1102 N Linden St | Tub to Tub Conversion | $10,999 |
| PLMBG2026-3450 | 2026-05-21 | Plumbing | 24 Brookwood Dr | Tub to Shower Base Conversion - Existing Bathroom | $3,507 |
| BLDR2026-3452 | 2026-05-21 | General construction | 24 Brookwood Dr | Tub to Shower Base Conversion - Existing Bathroom | $20,010 |
| BLDR2026-3343 | 2026-05-13 | General construction | 1104 Pine Meadows Ct | Tub to Tub Conversion | $28,709 |
| PLMBG2026-3339 | 2026-05-12 | Plumbing | 1104 Pine Meadows Ct | 2 EXISTING BATHROOMS - ONE SHOWER BASE TO SHOWER BASE CONVER | $1,518 |
| BLDR2026-2829 | 2026-03-31 | General construction | 907 Charlotte Dr | Tub to Tub Conversion | $15,777 |
| PLMBG2026-2831 | 2026-03-31 | Plumbing | 907 Charlotte Dr | Tub to Tub Conversion | $1,741 |
| BLDR2026-2659 | 2026-03-12 | General construction | 220 Orlando Ave | Tub to Shower Base Conversion - | $19,426 |
| PLMBG2026-2660 | 2026-03-12 | Plumbing | 220 Orlando Ave | Tub to Shower Base Conversion - | $3,730 |
| PLMBG2026-2546 | 2026-02-27 | Plumbing | 417 Warren Ave | Tub to Shower Base Conversion - | $3,507 |
| BLDR2026-2545 | 2026-02-27 | General construction | 417 Warren Ave | Tub to Shower Base Conversion - | $16,661 |
| PLMBG2026-2454 | 2026-02-26 | Plumbing | 1406 Henry St | Tub to Tub Conversion - | $1,203 |
| PLMBG2026-2453 | 2026-02-26 | Plumbing | 1002 Bakewell Ave | Tub to Shower Base Conversion - | $3,296 |
| BLDR2026-2455 | 2026-02-25 | General construction | 1406 Henry St | Tub to Tub Conversion | $8,299 |
| BLDR2026-2444 | 2026-02-25 | General construction | 2700 Limestone Ct | Tub to Shower Base Conversion - | $17,752 |
| BLDR2026-2452 | 2026-02-25 | General construction | 1002 Bakewell Ave | Tub to Shower Base Conversion - | $12,802 |
| PLMBG2026-2443 | 2026-02-24 | Plumbing | 2700 Limestone Ct | Tub to Shower Base Conversion - | $5,859 |
| BLDR2025-5853 | 2026-01-07 | General construction | 1307 Spear Dr | Shower Base to Shower Base Conversion | $11,707 |
| PLMBG2025-5852 | 2025-12-22 | Plumbing | 1307 Spear Dr | 2 Shower Base to Shower Base 1 Tub to Tub | $1,222 |
| BLDR2025-5331 | 2025-10-31 | General construction | 733 Hale St | Tub to Shower Base Conversion - | $14,203 |
| BLDR2025-5338 | 2025-10-31 | General construction | 2141 Elwood Ln | Shower Base to Shower Base Conversion | $21,218 |
| PLMBG2025-5336 | 2025-10-29 | Plumbing | 2141 Elwood Ln | Shower Base to Shower Base Conversion | $2,192 |
| PLMBG2025-5330 | 2025-10-29 | Plumbing | 733 Hale St | Tub to Shower Base Conversion - | $3,507 |
| BLDR2025-4933 | 2025-09-29 | General construction | 21 Broadway Pl | Tub to Tub Conversion | $12,162 |
| PLMBG2025-4932 | 2025-09-27 | Plumbing | 21 Broadway Pl | Tub to Tub Conversion | $1,222 |
| BLDR2025-4543 | 2025-09-03 | General construction | 1704 Bryan St | Tub to Shower Base Conversion - | $32,998 |
| PLMBG2025-4541 | 2025-09-02 | Plumbing | 1704 Bryan St | Tub to Shower Base Conversion - | $6,418 |
| PLMBG2025-3597 | 2025-06-25 | Plumbing | 205 Edwards Dr | Tub to Tub Conversion | $1,422 |
| BLDR2025-3596 | 2025-06-25 | General construction | 205 Edwards Dr | Tub to Tub Conversion | $11,897 |
| BLDR2025-3250 | 2025-06-03 | General construction | 919 Perry Ln | Tub to Tub Conversion - 2 bathrooms | $45,996 |
| BLDR2025-3253 | 2025-06-03 | General construction | 403 Bright Dr | Tub to Shower Base Conversion - | $28,825 |
| BLDR2025-3248 | 2025-06-03 | General construction | 107 N Blair Dr UNIT 27 | Tub to Shower Base Conversion - | $17,880 |
| PLMBG2025-3247 | 2025-05-30 | Plumbing | 107 N Blair Dr UNIT 27 | Tub to Shower Base Conversion - | $17,880 |
| PLMBG2025-3249 | 2025-05-30 | Plumbing | 919 Perry Ln | Tub to Tub Conversions - 2 Bathrooms | $45,996 |
| PLMBG2025-3252 | 2025-05-30 | Plumbing | 403 Bright Dr | Tub to Shower Base Conversion - | $28,825 |
| BLDR2025-3189 | 2025-05-21 | General construction | 215 Riss Dr | Shower Base to Shower Base Conversion | $12,171 |
| PLMBG2025-3188 | 2025-05-20 | Plumbing | 215 Riss Dr Bath | Shower Base to Shower Base Conversion | $12,171 |
| PLMBG2025-3127 | 2025-05-16 | Plumbing | 1006 Pine Meadows Ct | Tub to Tub Conversion | $8,299 |
| BLDR2025-3083 | 2025-05-16 | General construction | 1006 Pine Meadows Ct | Tub to Tub Conversion | $8,299 |
| BLDR2025-3014 | 2025-05-07 | General construction | 307 Carriage Hills Rd | Tub to Shower Base Conversion - | $14,806 |
| PLMBG2025-3013 | 2025-05-05 | Plumbing | 307 Carriage Hills Rd | Tub to Shower Base Conversion - | $14,806 |
| BLDR2025-2941 | 2025-04-29 | General construction | 225 Martin St | Shower Base to Shower Base Conversion | $13,980 |
| PLMBG2025-2940 | 2025-04-29 | Plumbing | 225 Martin St | Shower Base to Shower Base Conversion | $1,222 |
| BLDR2025-2472 | 2025-03-12 | General construction | 509 Marian Ave | Wall Surround Replacement and Valve - No New Framing | $7,615 |
| PLMBG2025-2471 | 2025-03-05 | Plumbing | 509 Marian Ave | Shower Surround Remodel. New valve only | $7,615 |
| PLMBG2024-5296 | 2024-12-24 | Plumbing | 715 Angela Dr | Shower Base to Tub Conversion | $14,893 |
| PLMBG2024-5298 | 2024-12-24 | Plumbing | 703 Lara Rd | Tub to Shower Base Conversion - | $19,210 |
| BLDR2024-5297 | 2024-12-23 | General construction | 703 Lara Rd | Tub to Shower Base Conversion - | $19,210 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Normal permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
