COMPANY RECORD · NORMAL, IL

Midwest Equipment — permit history in Normal, IL

Midwest Equipment appears on 27 Normal permit records from 2022 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical27100%

Activity by year

YearPermits issued
20221
202310
20245
20253
20268

Busiest year on record: 2023, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
3291 Butterfly Dr2026-06-26
1138 Hershey Rd2026-05-20
1207 Spear Dr2026-02-25
1619 Brougham St2026-02-25
1570 Hunt Dr BLDG J2026-02-25
2 Robinwood Dr2026-02-25
1017 Gregory St2026-02-25
1010 S Fell Ave2026-02-19
1172 Hershey Rd2025-10-24
1210 Belt Ave2025-09-29
1826 Johnson Dr2025-08-11
3 Birch Ct2024-10-16
621 Normal Ave2024-10-04
807 Weatherby Way2024-04-29

27 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $6,506 to $14,887, median $11,742. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

27 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
ELEC2026-38312026-06-26Electrical3291 Butterfly Dr14 KW Generator and 150 Amp Transfer Switch$8,776
ELEC2026-34452026-05-20Electrical1138 Hershey Rd24KW generator and 200A switch$12,138
ELEC2026-24502026-02-25Electrical1207 Spear Dr26KW Generator and 200A Switch$14,397
ELEC2026-24452026-02-25Electrical1619 Brougham St26KW Generator and 200A Switch$13,687
ELEC2026-24472026-02-25Electrical1570 Hunt Dr BLDG J26KW Generator and 200A Switch$14,887
ELEC2026-24482026-02-25Electrical2 Robinwood Dr26KW Generator and 200A Switch$14,097
ELEC2026-24512026-02-25Electrical1017 Gregory St26KW Generator and 200A Switch$14,297
ELEC2026-23992026-02-19Electrical1010 S Fell Ave26KW generator and transfer switch$12,387
ELEC2025-52312025-10-24Electrical1172 Hershey Rd24KW generator and 150A switch$11,742
ELEC2025-49362025-09-29Electrical1210 Belt Ave24KW generator and 200A switch$12,147
ELEC2025-42502025-08-11Electrical1826 Johnson Dr18KW, 150 Amp Transfer Switch$12,092
ELEC2024-47762024-10-16Electrical3 Birch Ct26 KW Generator and 150A Switch$14,811
ELEC2024-46822024-10-04Electrical621 Normal Ave22KW Generator with 200A Transfer Switch$11,366
ELEC2024-31182024-04-29Electrical807 Weatherby Way22KW Generator with 200A Transfer Switch$12,071
ELEC2024-30952024-04-25Electrical1400 Ironwood CC Dr18KW Generator with 200A Switch$10,731
ELEC2024-26462024-03-14Electrical902 Timothy Ct18KW Generator and 100A Transfer Switch$10,378
ELEC2023-47022023-09-18Electrical611 Whispering Pines CC Ln24KW Generator and 200A Transfer Switch$11,686
ELEC2023-47032023-09-18Electrical1108 Pine Ridge Ct22KW Generator with 200A Transfer Switch$11,281
ELEC2023-42802023-08-16Electrical913 N Fell Ave24 KW Generator and 200 A Transfer$11,996
ELEC2023-31612023-05-03Electrical3115 Fire Fly Ct24KW Generator and 200A Transfer Switch$9,342
ELEC2023-31512023-05-03Electrical1203 Ogelthorpe Ave10KW Generator with 16 Circuit Panel$6,600
ELEC2023-27572023-03-21Electrical1007 N Walnut St18KW Generator and 100A Transfer Switch$10,231
ELEC2023-26412023-03-10Electrical1101 Bryan St18KW Generator, 200A Transfer Switch$10,351
ELEC2023-23152023-01-31Electrical206 Robert Dr24KW Generator and 200A Transfer Switch$10,886
ELEC2023-22352023-01-24Electrical3506 Tahoe Blvd24kw Generator with 200A ATS$10,686
ELEC2023-21752023-01-20Electrical2445 Chaffee Dr24KW Generator with 200A Automatic Transfer Switch$12,386
ELEC2022-52602022-12-21Electrical6 Thomas Dr10KW Generator with 16 Circuit Panel$6,506

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Normal permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →