Power Construction Company, LLC — permit history in Chicago, IL
Power Construction Company, LLC appears on 1,325 Chicago permit records from 2006 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 1325 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2006 | 6 |
| 2007 | 12 |
| 2008 | 27 |
| 2009 | 39 |
| 2010 | 28 |
| 2011 | 49 |
| 2012 | 46 |
| 2013 | 73 |
| 2014 | 50 |
| 2015 | 62 |
| 2016 | 100 |
| 2017 | 74 |
| 2018 | 100 |
| 2019 | 93 |
| 2020 | 81 |
| 2021 | 87 |
| 2022 | 110 |
| 2023 | 99 |
| 2024 | 77 |
| 2025 | 62 |
| 2026 | 50 |
Busiest year on record: 2022, with 110 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Dw Mechanical Group,Inc. | 167 | 2026-08-11 |
| Sherman Mechanical Inc | 126 | 2026-03-20 |
| Ewing-Doherty Mechanical, Inc | 124 | 2026-07-29 |
| Shamrock Electric Co., Inc. | 102 | 2026-08-27 |
| Gurtz Electric Company | 96 | 2024-09-20 |
| Hill Mechanical Corp. | 80 | 2025-10-03 |
| Westside Mechanical | 77 | 2026-05-29 |
| Advance Mechanical Systems, In | 73 | 2025-10-27 |
| Connelly Electric Co. | 69 | 2026-08-11 |
| Advance Mechanical | 62 | 2024-10-10 |
| Hill Mechanical Group | 55 | 2022-08-02 |
| Blade Electric | 54 | 2026-08-20 |
199 companies are named alongside Power Construction Company, LLC on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 5207 S HARPER AVE | 2026-08-27 |
| 932 N RUSH ST | 2026-08-20 |
| 8745 W HIGGINS RD | 2026-08-11 |
| 2900 N LAKE SHORE DR | 2026-07-29 |
| 1144 W LOYOLA AVE | 2026-07-24 |
| 30 N LA SALLE ST | 2026-07-17 |
| 2430 N LAKEVIEW AVE | 2026-07-16 |
| 1969 W OGDEN AVE | 2026-07-15 |
| 222 N LA SALLE ST | 2026-07-07 |
| 69 W WASHINGTON ST | 2026-06-24 |
| 19 S LA SALLE ST | 2026-06-22 |
| 1131 W BLACKHAWK ST | 2026-06-12 |
| 1132 W BLACKHAWK ST | 2026-05-29 |
| 801 W NORTH AVE | 2026-05-20 |
340 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $370,000,000, median $371,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
1,325 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 101087399 | 2026-08-27 | General construction | 5207 S HARPER AVE | SC/ 2019 CBRC - INTERIOR ALTERATIONS ON FLOORS 3-11 FOR INSTALLATION OF ADDITIONAL ELECTRICAL SERVICE TO INCLUDE NEW CONDUIT AND EQUIPMENT, SWITCHBOARDS BUS DUCT, FEEDER CONNECTORS | $2,000,000 |
| 101086907 | 2026-08-20 | General construction | 932 N RUSH ST | SELF CERT 2019 CBRC: PHASE 2 OF 2: INTERIOR ALTERATION TO AN EXISTING GROUND FLOOR RETAIL STORE. WORK INCLUDES, NEW PARTITIONS, LIGHTING, ELECTRICAL UPDATES, CEILINGS, FINISH MODIF | $1,300,000 |
| 101085785 | 2026-08-11 | General construction | 8745 W HIGGINS RD | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS OF 4TH FLOOR OF AN EXISTING OFFICE BUILDING AS PER PLANS. (STRUCTURAL PEER REVIEW) (OCCUPANCY GROUP B; TYPE 1A CONSTRUCTION) | $14,500,000 |
| 101086731 | 2026-08-10 | General construction | 932 N RUSH ST | SELF CERT 2019 CBRC: PHASE 1 DEMO ONLY. INTERIOR DEMOLITION OF NON-LOADING BEARING PARTITIONS, CEILING FINISHES, LIGHTING FIXTURES, AND MECHANICAL DIFFUSERS ON GROUND FLOOR RETAIL | $30,000 |
| 101080371 | 2026-07-29 | General construction | 2900 N LAKE SHORE DR | SELF CERT 2019 CBC: INTERIOR ALTERATIONS TO EXISTING 1ST, 2ND & 3RD FLOOR OF HOSPITAL TO INCLUDE IMAGING EQUIPMENT REPLACEMENTS AS PER PLANS (OCCUPANCY I-2 & B, TYPE IA CONSTRUCTIO | $250,000 |
| 101085835 | 2026-07-27 | General construction | 5207 S HARPER AVE | SELF-CERT 2019 CBC: QUANTUM LAB WEST SIDE PHASE 2 OF INITIAL BUILDOUT ON THE 8TH FLOOR WITHIN AN EXISTING MIXED-USE BUILDING FOR A NON-HAZARDOUS LABORATORY SPACE. WORK INCLUDES NE | $3,500,000 |
| 101085095 | 2026-07-27 | General construction | 5207 S HARPER AVE | SELF-CERT 2019 CBC: CORRIDOR AND CONFERENCE CENTER - PHASE 1 OF INITIAL BUILDOUT ON THE 8TH FLOOR WITHIN AN EXISTING MIXED-USE BUILDING FOR A NON-HASARDOUS LABORATORY SPACE. WORK | $3,000,000 |
| 101085836 | 2026-07-27 | General construction | 5207 S HARPER AVE | SELF-CERT 2019 CBC: WET LAB EAST SIDE PHASE 3 OF INITIAL BUILDOUT ON THE 8TH FLOOR WITHIN AN EXISTING MIXED-USE BUILDING FOR A NON-HAZARDOUS LABORATORY SPACE. WORK INCLUDES NEW NON | $3,500,000 |
| 101077810 | 2026-07-24 | General construction | 1144 W LOYOLA AVE | DDS 2019 CBC. NEW CONSTRUCTION OF A 6-FLOOR PLUS BASEMENT CONCRETE BUILDING. INCLUDES CONSTRUCTION OF LEVEL 2 TO ROOF. CONSTRUCTION TYPE IB. PD-34. OCCUPANCIES INCLUDE GROUPS B-BU | $162,000,000 |
| 101083628 | 2026-07-17 | General construction | 30 N LA SALLE ST | DDS 2019 CBRC: REPLACEMENT OF WINDOWS ON FLOORS 19-42 (ALL ELEVATIONS) OF AN EXISTING 44-STORY OFFICE BUILDING AS PER PLANS.(OCCUPANCY GROUP: B / TYPE 1A CONSTRUCTION) CONSULTANT R | $10,000,000 |
| 101082698 | 2026-07-16 | General construction | 2430 N LAKEVIEW AVE | SELF CERT 2019 CBRC WITH STRUCTURAL PEER REVIEW: INTERIOR AND EXTERIOR ALTERATIONS TO EXISTING RESIDENTIAL CONDO UNITS 5N AND 6N. WORK TO INCLUDE DEMO, NEW PARTITIONS, NEW STRUCTUR | $3,080,000 |
| 101084176 | 2026-07-15 | General construction | 1969 W OGDEN AVE | SELF-CERT. 2026 CBC EQUIPMENT REPLACEMENT IN CT SIMULATOR ROOM AND ASSOCIATED CONTROL ROOM. RENOVATIONS INCLUDE NEW FINISHED FLOORING, REPLACING MILLWORK AND SELECT MODIFICATIONS T | $340,000 |
| 101085335 | 2026-07-07 | General construction | 222 N LA SALLE ST | SELF-CERT 2019 CBC: INTERIOR ALTERATIONS TO 11TH FLOOR. SCOPE CONSISTS OF 4 SPEC SUITES (1100, 1125, 1135, & 1150), FULL RESTROOM RENOVATIONS, ONE NEW SINGLE OCCUPANCY TOILET ROOM, | $4,600,000 |
| 101084659 | 2026-06-24 | General construction | 8745 W HIGGINS RD | SELF-CERT 2019 CBRC: INTERIOR DEMOLITION OF NON-LOAD BEARING PARTITIONS, VENTILATION, ELECTRIC, AND PLUMBING ON THE 4TH FLOOR OF AN EXISTING OFFICE BUILDING AS PER PLANS.(OCCUPANCY | $300,000 |
| 101084606 | 2026-06-24 | General construction | 69 W WASHINGTON ST | SELF-CERT 2019 CBC: REVISION TO PERMIT 101073642 UNFORSEEN STRUCTURAL CONDITIONS FOUND DURING CONSTRUCTION. SCOPE OF WORK: INFILL OF EXISTING STAIR OPENING. OCCUPANCY GROUP B, CONS | $50,000 |
| 101069926 | 2026-06-22 | General construction | 19 S LA SALLE ST | DDS 2019 CBRC: INTERIOR AND EXTERIOR ALTERATIONS TO EXISTING 17 STORY OFFICE BUILDING TO CONVERT IT TO A MIXED-USE BUILDING WITH GROUND FLOOR RETAIL USE, HOTEL USE ON 2ND-3RD FLS. | $50,000,000 |
| B200473069 | 2026-06-12 | General construction | 1131 W BLACKHAWK ST | SCOPE: NONSTRUCTURAL INTERIOR ALTERATION OF OFFICE EXISTING OFFICE SPACE, INSTALL NEW PARTITIONS, ELECTRICAL FOR LIGHT FIXTURES, AND FLOORS. LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON | $155,000 |
| 101083322 | 2026-05-29 | General construction | 222 N LA SALLE ST | SELF CERT 2019 CBRC INTERIOR ALTERATIONS TO SUITE 1500 FOR MICHAEL BAKER.. WORK INCLUDES MEW PARTITIONS, FINISHES, MILLWORK, MECHANICAL, ELECTRICAL AND PLUMBING, AS PER PLANS. NO S | $842,702 |
| 101083845 | 2026-05-29 | General construction | 1132 W BLACKHAWK ST | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO 1ST FLOOR AND 2ND FLOOR OFFICE SPACE. WORK TO INCLUDE DEMOLITION AND CONSTRUCTION OF NON-LOAD BEARING PARTITIONS, FURNITURE, FINISHES | $767,606 |
| 101078802 | 2026-05-28 | General construction | 2900 N LAKE SHORE DR | SPR 2019 CBC: INTERIOR ALTERATIONS TO EXISTING 3RD FLOOR OF HOSPITAL TO EXPAND THE STERILE STORAGE AND RENOVATE THE DECONTAMINATION AREA AS PER PLANS (OCCUPANY I-2, TYPE IA CONSTR | $4,950,000 |
| B200470021 | 2026-05-26 | General construction | 5207 S HARPER AVE | SCOPE: NONSTRUCTURAL INTERIOR ALTERATION TO EXISTING MECHANICAL, PLUMBING AND ELECTRICAL AT EXISTING LAB.LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), 6TH FLOOR ROOM | $100,000 |
| 101082593 | 2026-05-22 | General construction | 1144 W LOYOLA AVE | ***HOIST PERMIT*** INSTALLATION OF TEMPORARY SINGLE 8000LBS RACK AND PINION CONSTRUCTION HOIST | $92,000 |
| 101081661 | 2026-05-20 | General construction | 801 W NORTH AVE | S/C 2019: INTERIOR ALTERATION TO INSTALL VESTIBULE AREA WITHIN EXISTING APPLE RETAIL STORE AS PER PLANS. NO MEP WORK (OCCUPANCY: M, CONSTRUCTION TYPE: 1A) | $150,000 |
| 101079030 | 2026-05-18 | General construction | 251 E HURON ST | DDS 2019 CBC: INTERIOR ALTERATIONS TO EXISTING LEVELS 14 AND 15 OF THE GALTER PAVILION TO INCLUDE CONVERSION FROM BUSINESS AMBULATORY CARE TO AN INTENSIVE CARE UNIT & A 2 STORY CON | $40,000,000 |
| B200467622 | 2026-05-14 | General construction | 1132 W BLACKHAWK ST | SCOPE: NONSTRUCTURAL INTERIOR ALTERATION TO SECOND FLR FOR NEW OPEN OFFICE FLOOR PLAN, INCLUDES NEW PARTITIONS, FINISHES, MECHANICAL AND ELECTRICAL FOR LIGHT FIXTURES.LOCATIONS: 0 | $107,086 |
| B200467164 | 2026-05-14 | General construction | 1132 W BLACKHAWK ST | SCOPE: NONSTRUCTURAL INTERIOR ALTERATION TO SECOND FLR FOR NEW OPEN OFFICE FLOOR PLAN INCLUDES NEW PARTITIONS, FINISHES, MECHANICAL AND ELECTRICAL FOR LIGHT FIXTURES.LOCATIONS: 0 R | $107,086 |
| 101081172 | 2026-05-05 | General construction | 300 E SUPERIOR ST | SELF CERT 2019 CBRC: INTERIOR ALTERATIONS TO 13TH FLOOR OFFICE SPACE. WORK TO INCLUDE DEMO, NEW PARTITIONS, MECHANICAL, ELECTRICAL AND PLUMBING AS PER PLANS. 1A CONSTRUCTION. B-BUS | $1,500,000 |
| 101079995 | 2026-05-04 | General construction | 209 E LAKE SHORE DR | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 14TH FLOOR RESIDENTIAL UNIT AS PER PLANS. UNIT 14E & 14W. WORK TO INCLUDE DEMOLITION AND CONSTRUCTION OF NON-LOAD BEARING PART | $2,900,000 |
| 101081778 | 2026-04-29 | General construction | 222 N LA SALLE ST | SELF-CERT 2019 CBRC: ALTERATIONS OF EXISTING CONFERENCE CENTER INCLUDING DEMOLITION AND REPLACEMENT OF EXISTING PARTITIONS, LIGHTING, AND FINISHES. INTERIORS WORK ONLY. (OCCUPANCY | $1,800,000 |
| 101082242 | 2026-04-27 | General construction | 1132 W BLACKHAWK ST | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO 2ND AND 3RD FLOOR OFFICE SPACE TO INCLUDE NON-STRUCTURAL DEMOLITION OF FURNITURE, PARTITIONS, LIGHT FIXTURES, AND FLOORING. INTERIOR C | $278,431 |
| 101082617 | 2026-04-23 | General construction | 193 N COLUMBUS DR | REINSTATE PERMIT NO 100923440 MUST BEGIN WORK AND OR REQUEST INSPECTION NO LATER THAN ***OCTOBER 2026*** ON PERMIT NO 100923440 | $0 |
| 101079109 | 2026-04-22 | General construction | 1958 N FREMONT ST | DDS. 2019 CBC. REVISION TO PERMIT #101055403. REAR YARD CANOPY EXTENSION ONLY AT SINGLE-FAMILY RESIDENCE (III-B, THREE STORY,MASONRY AND WOOD FRAME).CONSULTANT REVIEWER: PRIMERA EN | $30,000 |
| B200465297 | 2026-04-22 | General construction | 159 E WALTON PL | SCOPE: NONSTRUCTURAL INTERIOR ALTERATION INCLUDING ELECTRICAL AND PLUMBING (NO MECHANICAL WORK). LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), UNIT 20B. | $1,170,000 |
| 101080037 | 2026-04-10 | General construction | 19 S LA SALLE ST | HOIST PERMIT FOR AVR850S SINGLE CAR HOIST | $100,000 |
| 101081216 | 2026-04-09 | General construction | 5207 S HARPER AVE | SC / 2019 CBC: REVISION TO PERMIT 101074867 FOR NEW NON-LOAD BEARING PARTITION AND DOOR ON THE 12TH FLOOR OF AN EXISTING BUILDING, AS PER PLANS. (OCCUPANCY GROUP: B / TYPE 1A CONST | $33,000,000 |
| B200465171 | 2026-04-08 | General construction | 1385 N NORTH BRANCH ST | SCOPE: NONSTRUCTURAL INTERIOR ALTERATION FOR REMOVAL OF NON-LOAD BEARING PARTITION TO EXISTING OFFICE FOR OPEN OFFICE FLOOR PLAN, PATCH AND REPAIR FLOORS AND ADD ELECTRICAL FOR WOR | $280,665 |
| 101080405 | 2026-03-30 | General construction | 900 N NORTH BRANCH ST | SELF-CERT 2019 CBRC: ALTERATIONS TO 5TH AND 6TH FLOOR OFFICE SPACE IN AN 8 STORY FULLY SPRINKLERED BUILDING INCLUDING PARTIAL INTERIOR DEMOLITION OF 5TH FLOOR. NEW PARTITION LAYOUT | $4,500,000 |
| 101079907 | 2026-03-20 | General construction | 6551 N SHERIDAN RD | FREESTANDING POTAIN MD485B TOWER CRANE FOUNDATION | $100,000 |
| 101079700 | 2026-03-20 | General construction | 400 N ABERDEEN ST | SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS FOR NEW OFFICE SPACE AND NON-HAZARDOUS LABORTORY SPACE ON THE 1ST FLOOR. NEW CONSTRUCTION OF NON-LOADBEARING PARTITIONS, DOORS, CEILING, L | $1,000,000 |
| B200461627 | 2026-03-11 | General construction | 801 W NORTH AVE | IN-KIND REPLACEMENT OF EXTERIOR WINDOWS AND DOORS IN EXISTING OPENINGS. REPLACEMENT WINDOWS: 0; REPLACEMENT SKYLIGHTS: 0; REPLACEMENT DOORS: 2. AFFECTS: 0 RESIDENTIAL UNIT(S), 1 NO | $750,000 |
| 101077063 | 2026-03-06 | General construction | 513 S DAMEN AVE | SPR 2019 CBRC: REPAIR AND REUSE OF EXTERIOR PANELS ON 22-STORY RESIDENTIAL BUILDING (OCCUPANCY A-3, B, R-2, S-2; CONSTRUCTION TYPE : 1A) | $800,000 |
| 101080494 | 2026-03-05 | General construction | 355 E WACKER DR | REINSTATE PERMIT NO 100744730 MUST BEGIN INSTALLATION | $0 |
| 101079251 | 2026-02-18 | General construction | 355 E ERIE ST | SELF CERT 2019 CBC: REVISION TO PERMIT PERMIT #: 101068090 TO REVISE ELEVATOR LOBBY EGRESS CHANGE SLIDING DOOR TO OVERHEAD GATE, AND A SEPARATE MAN DOOR WITH DELAYED EGRESS. REIV | $15,050,000 |
| 101074646 | 2026-02-13 | General construction | 2538 S WABASH AVE | DDS / 2019 CBRC: 2-STORY BUILDING ADDITION TO AN EXISTING 2-STORY BUILDING FOR NEW DATA CENTER, TO INCLUDE AT-GRADE PARKING LOT (29 PARKING SPACES) AND ASSOCIATED SITE WORK AS PER | $18,000,000 |
| 101079367 | 2026-02-06 | General construction | 200 N GREEN ST | REINSTATE PERMIT NO 101051744 MUST CONTINUE CONSTRUCTION AND OR REQUEST INSPECTIONS NO LATER THAN MAY 2026 | $0 |
| 101073042 | 2026-01-30 | General construction | 1144 W LOYOLA AVE | DDS 2019 CBC: NEW CONSTRUCTION, FOUNDATION TO LEVEL 1 FRAMING, CAISSONS TO 100' BELOW GRADE, ERS TO 150' BELOW GRADE, UNDERGROUND PLUMBING, LANDSCAPE AND CIVIL SITE WORK AS PER PLA | $11,200,000 |
| 101074867 | 2026-01-28 | General construction | 5207 S HARPER AVE | SC / 2019 CBC: INITIAL TENANT BUILDOUT ON THE 11TH, 12TH, AND 13TH FLOOR OF AN EXISTING OFFICE BUILDING FOR A BUSINESS USE NON-HAZARDOUS LABORATORY SPACE WITH SERVER ROOM LESS THAN | $33,000,000 |
| 101077782 | 2026-01-21 | General construction | 180 E PEARSON ST | SELF-CERT CHICAGO 2019 CBRC. INTERIOR DEMOLITION OF EXISTING RESIDENTIAL UNIT 6403-6404, INCLUDING ELECTRICAL, MECHANICAL AND PLUMBING. NO STRUCTURAL WORK ASSOCIATED. | $69,693 |
| 101077656 | 2026-01-13 | General construction | 5207 S HARPER AVE | SC / 2019 CBC: INITIAL BUILDOUT ON THE 4TH FLOOR OF AN EXISTING OFFICE BUILDING FOR A BREAK ROOM TO INCLUDE NON-LOAD BEARING PARTITIONS, LIGHTING, VENTILATION, AND PLUMBING WORK AS | $70,000 |
| 101078078 | 2026-01-07 | General construction | 933 E 56TH ST | SELF CERT 2019 CBRC: REVISION TO PERMIT #101071350 TO EXPAND ROOM #021 DUE TO EQUIPMENT. (1A CONSTRUCTION. B-BUSINESS USE) | $220,427 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →