COMPANY RECORD · CHICAGO, IL
Monson Nicholas, Inc. — permit history in Chicago, IL
Monson Nicholas, Inc. appears on 95 Chicago permit records from 2009 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 148 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2009 | 10 |
| 2010 | 6 |
| 2011 | 3 |
| 2012 | 4 |
| 2013 | 9 |
| 2014 | 12 |
| 2015 | 9 |
| 2016 | 12 |
| 2017 | 8 |
| 2018 | 10 |
| 2019 | 12 |
| 2020 | 2 |
| 2021 | 18 |
| 2022 | 10 |
| 2023 | 8 |
| 2024 | 7 |
| 2025 | 5 |
| 2026 | 3 |
Busiest year on record: 2021, with 18 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every Chicago permit, not only this company's
This page is a snapshot of Monson Nicholas, Inc.. The search behind it holds more than 664,804 Chicago permits naming a contractor, since 2009: 427,556 electrical permits, 332,944 building permits, 134,935 plumbing permits, 103,067 mechanical (HVAC) permits, 28,213 signage permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit Monson Nicholas, Inc. files, or any new building permit in Chicago. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Mechanical, Inc | 6 | 2019-11-18 |
| Mechanical Inc DBA Helm Mechan | 4 | 2022-08-24 |
| Ashburn Power & Light, Inc. | 2 | 2016-12-02 |
| T.P. Adamson, Huron Mech Ind | 2 | 2009-11-12 |
| Gurtz Electric Company | 1 | 2015-10-07 |
| Hill Mechanical Group | 1 | 2015-10-07 |
| Texa Engineering | 1 | 2011-03-31 |
7 companies are named alongside Monson Nicholas, Inc. on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 990 N LAKE SHORE DR | 2026-07-02 |
| 1134 W GRANVILLE AVE | 2026-03-27 |
| 1530 N DEARBORN PKWY | 2026-03-05 |
| 3200 N JEAN BAPTISTE POINTE DUSABLE LAKE SHORE DR | 2025-12-22 |
| 600 W DIVERSEY PKWY | 2025-10-08 |
| 450 W BRIAR PL | 2025-08-22 |
| 8410 W BRYN MAWR AVE | 2025-04-22 |
| 2900 N JEAN BAPTISTE POINTE DUSABLE LAKE SHORE DR | 2025-03-26 |
| 300 E SUPERIOR ST | 2024-05-30 |
| 5901 N SHERIDAN RD | 2024-05-08 |
| 550 N KINGSBURY ST | 2024-04-24 |
| 525 W HAWTHORNE PL | 2024-04-09 |
| 4827 N SHERIDAN RD | 2024-03-25 |
| 123 S GREEN ST | 2023-07-21 |
79 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $4,200,000, median $332,683. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Dunning Electrical Services In | 10 | 2009–2025 |
| W.J. Mcguire Company | 8 | 2009–2025 |
| Seminary Electrical Contractors Inc | 8 | 2009–2026 |
| Ls Contracting Group, Inc. | 7 | 2014–2026 |
| Urban Elevator Service, LLC | 7 | 2009–2025 |
| Owner Acting As Own Plumber | 7 | 2009–2021 |
| Continental Electrical Constru | 6 | 2009–2026 |
| Holton Brother's Inc. | 6 | 2010–2026 |
Companies that also appear in Chicago permit records at addresses where Monson Nicholas, Inc. filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
95 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B200476863 | 2026-07-02 | General construction | 990 N LAKE SHORE DR | CONCRETE MASONRY REPAIR / REPLACEMNT: 885SQ. FT., EXCAVATION = . LOCATION: POOL DECK. | $743,000 |
| B200463451 | 2026-03-27 | General construction | 1134 W GRANVILLE AVE | CONCRETE MASONRY REPAIR / REPLACEMNT: 1775SQ. FT., EXCAVATION = . LOCATION: PARKING GARAGE AND FIFTH FLOOR. | $737,652 |
| B200461062 | 2026-03-05 | General construction | 1530 N DEARBORN PKWY | CONCRETE MASONRY REPAIR / REPLACEMNT: 100SQ. FT., EXCAVATION = . LOCATION: OUT DOOR PATIO WATERPROOFING REPAIRS. | $122,000 |
| B200454318 | 2025-12-22 | General construction | 3200 N JEAN BAPTISTE POINTE DUSABLE LAKE SHORE DR | CONCRETE MASONRY REPAIR / REPLACEMNT: 100SQ. FT., EXCAVATION = . LOCATION: BASEMENT HALLWAY MEMBRANE AND CONCRETE REPAIRS. | $108,000 |
| B200437322 | 2025-10-08 | General construction | 600 W DIVERSEY PKWY | CONCRETE MASONRY REPAIR / REPLACEMNT: 1170SQ. FT., EXCAVATION = . LOCATION: PARKING GARAGE. | $389,125 |
| B200438591 | 2025-08-22 | General construction | 450 W BRIAR PL | CONCRETE MASONRY REPAIR / REPLACEMNT: 500SQ. FT., EXCAVATION = . LOCATION: FRONT STEPS. | $203,281 |
| B200421511 | 2025-04-22 | General construction | 8410 W BRYN MAWR AVE | CONCRETE MASONRY REPAIR / REPLACEMNT: 1739SQ. FT., EXCAVATION = NO. LOCATION: PARKING GARAGE. | $260,930 |
| B200417702 | 2025-03-26 | General construction | 2900 N JEAN BAPTISTE POINTE DUSABLE LAKE SHORE DR | CONCRETE MASONRY REPAIR / REPLACEMNT: 4500SQ. FT., EXCAVATION = . LOCATION: PARKING DECKS AND FACADE. | $4,200,000 |
| B200018565 | 2024-05-30 | General construction | 300 E SUPERIOR ST | CONCRETE MASONRY REPAIR / REPLACEMNT: 600SQ. FT., EXCAVATION = NO. LOCATION: LOADING DOCK AREA. | $79,467 |
| B200015120 | 2024-05-08 | General construction | 5901 N SHERIDAN RD | CONCRETE MASONRY REPAIR / REPLACEMNT: 360SQ. FT., EXCAVATION = NO. LOCATION: PATIO ON BACK SIDE OF BUILDING. | $330,983 |
| 101027919 | 2024-04-24 | General construction | 550 N KINGSBURY ST | SPR 2019 CBC - IMPROVE EGRESS FROM EXISTING FIRST FLOOR PARKING GARAGE BY INSTALLING NEW SWING GATE AND EXIT PATH TO KINGSBURY. IMPROVE EGRESS FROM BASEMENT PARKING BY INSTALLING N | $125,000 |
| 101027919 | 2024-04-24 | General construction | 550 N KINGSBURY ST | SPR 2019 CBC - IMPROVE EGRESS FROM EXISTING FIRST FLOOR PARKING GARAGE BY INSTALLING NEW SWING GATE AND EXIT PATH TO KINGSBURY. IMPROVE EGRESS FROM BASEMENT PARKING BY INSTALLING N | $125,000 |
| B200013374 | 2024-04-09 | General construction | 525 W HAWTHORNE PL | CONCRETE MASONRY REPAIR / REPLACEMNT: 950SQ. FT., EXCAVATION = NO. LOCATION: 2ND STORRY TERRACE. | $334,383 |
| B200009798 | 2024-03-25 | General construction | 4827 N SHERIDAN RD | CONCRETE MASONRY REPAIR / REPLACEMNT: 1165SQ. FT., EXCAVATION = NO. LOCATION: PARKING STRUCUTRE. | $152,616 |
| B200006504 | 2024-01-26 | General construction | 450 W BRIAR PL | CONCRETE MASONRY REPAIR / REPLACEMNT: 4800SQ. FT., EXCAVATION = NO. LOCATION: PARKING GARAGE. | $727,175 |
| 101025225 | 2023-07-27 | General construction | 525 W HAWTHORNE PL | TOPSIDE, UNDERSIDE, VERTICAL BEAM CONCRETE REPAIRS, WATERPROOFING MEMBRANE REPLACEMENT | $209,449 |
| 101025225 | 2023-07-27 | General construction | 525 W HAWTHORNE PL | TOPSIDE, UNDERSIDE, VERTICAL BEAM CONCRETE REPAIRS, WATERPROOFING MEMBRANE REPLACEMENT | $209,449 |
| 101024910 | 2023-07-21 | General construction | 123 S GREEN ST | RAMP SEALANT REPAIRS | $15,529 |
| 101024910 | 2023-07-21 | General construction | 123 S GREEN ST | RAMP SEALANT REPAIRS | $15,529 |
| 101008340 | 2023-03-09 | General construction | 636 W WAVELAND AVE | MEMBRANE AND SEALANT REPAIRS. | $69,987 |
| 101008340 | 2023-03-09 | General construction | 636 W WAVELAND AVE | MEMBRANE AND SEALANT REPAIRS. | $69,987 |
| 101002668 | 2023-01-19 | General construction | 3200 N LAKE SHORE DR | 3100 SQ FT CONCRETE REPAIRS, 27,300 SQ FT MEMBRANE REPAIRS, ROUT AND SEAL 7000 L FT | $550,634 |
| 101002668 | 2023-01-19 | General construction | 3200 N LAKE SHORE DR | 3100 SQ FT CONCRETE REPAIRS, 27,300 SQ FT MEMBRANE REPAIRS, ROUT AND SEAL 7000 L FT | $550,634 |
| 100985965 | 2022-08-25 | General construction | 1142 S MICHIGAN AVE | MASONARY REPAIRS FOR LINTELS. | $26,873 |
| 100985787 | 2022-08-24 | General construction | 124 W POLK ST | 45 SQ FT CONCRETE REPAIR WITH INSTALLATION OF FLOOR DRAIN IN COMPACTOR ROOM, AND INSTALL 3INCH DRAIN AND ALL ASSOCIATED PIPING FOR LOCATION OF UNDERGROUND ENTRY | $99,272 |
| 100985787 | 2022-08-24 | General construction | 124 W POLK ST | 45 SQ FT CONCRETE REPAIR WITH INSTALLATION OF FLOOR DRAIN IN COMPACTOR ROOM, AND INSTALL 3INCH DRAIN AND ALL ASSOCIATED PIPING FOR LOCATION OF UNDERGROUND ENTRY | $99,272 |
| 100982735 | 2022-08-02 | General construction | 4623 N CHESTER AVE | 851 SQ FT CONCRETE REPAIRS | $125,088 |
| 100982735 | 2022-08-02 | General construction | 4623 N CHESTER AVE | 851 SQ FT CONCRETE REPAIRS | $125,088 |
| 100975603 | 2022-06-10 | General construction | 10 S DEARBORN ST | PLANTERS REMOVE AND REPLACING THE WATERPROOFING. | $396,864 |
| 100975603 | 2022-06-10 | General construction | 10 S DEARBORN ST | PLANTERS REMOVE AND REPLACING THE WATERPROOFING. | $396,864 |
| 100973845 | 2022-06-03 | General construction | 5415 N SHERIDAN RD | REMOVE/REPLACE 2800 SQ FT PLEXI GLASS IN POOL SUNROO (NO OTHER WORK) | $236,400 |
| 100955879 | 2022-01-20 | General construction | 1660 N LA SALLE DR | TOPSIDE AND UNDERSIDE PARTIAL DEPTH SLAB REPAIRS, TRAFFIC COATING, ROUT AND SEAL CRACKS, REMOVE/ REPLACE PARAPET COPING JOINTS, REPLACE CRACKED/SPALLED BRICKS AND CMU AT GARAGE EX | $1,877,783 |
| 100955879 | 2022-01-20 | General construction | 1660 N LA SALLE DR | TOPSIDE AND UNDERSIDE PARTIAL DEPTH SLAB REPAIRS, TRAFFIC COATING, ROUT AND SEAL CRACKS, REMOVE/ REPLACE PARAPET COPING JOINTS, REPLACE CRACKED/SPALLED BRICKS AND CMU AT GARAGE EX | $1,877,783 |
| 100946407 | 2021-11-02 | General construction | 444 W FULLERTON PKWY | 2019 CBC: PLAZA STAIR REPAIRS IN AN EXISTING 20-STORY RESIDENTIAL TOWER AS PER PLANS. | $102,300 |
| 100945923 | 2021-10-29 | General construction | 360 E SOUTH WATER ST | WATERPROOFING PLANTERS BED AND REMOVAL/REPLACEMENT OF PLANTER WALL ON PRIVATE PROPERTY | $358,095 |
| 100945923 | 2021-10-29 | General construction | 360 E SOUTH WATER ST | WATERPROOFING PLANTERS BED AND REMOVAL/REPLACEMENT OF PLANTER WALL ON PRIVATE PROPERTY | $358,095 |
| 100934087 | 2021-08-04 | General construction | 707 W WAVELAND AVE | PARTIAL DEPTH AND OVERHEAD REPAIRS RE-COATING OF THE MEMBRANE. | $204,669 |
| 100930929 | 2021-07-14 | General construction | 8420 W BRYN MAWR AVE | PARTIAL DEPT AND OVERHEAD REPAIRS. DOUBLE T CAULKING OF JOINTS AND REMOVAL AND REPLACEMENT OF WATERPROOFING MEMEBRANE. | $916,763 |
| 100930929 | 2021-07-14 | General construction | 8420 W BRYN MAWR AVE | PARTIAL DEPT AND OVERHEAD REPAIRS. DOUBLE T CAULKING OF JOINTS AND REMOVAL AND REPLACEMENT OF WATERPROOFING MEMEBRANE. | $916,763 |
| 100925738 | 2021-06-11 | General construction | 165 N CANAL ST | 45,750 SQ FT CONCRETE REPAIRS AND TRAFFIC MEMBRANE RECOATING | $314,350 |
| 100925738 | 2021-06-11 | General construction | 165 N CANAL ST | 45,750 SQ FT CONCRETE REPAIRS AND TRAFFIC MEMBRANE RECOATING | $314,350 |
| 100916412 | 2021-05-19 | General construction | 3270 N LAKE SHORE DR | 2019 CBRC STANDARD PLAN: CONCRETE REPAIRS AND MAINTENANCE TO 2 STORY PARKING GARAGE AS PER PLAN, NO CHANGE IN USE R2 S2, CONSTRUCTION TYPE 1B.**CERTIFIED CORRECTIONS SUBJECT TO FIE | $806,000 |
| 100916412 | 2021-05-19 | General construction | 3270 N LAKE SHORE DR | 2019 CBRC STANDARD PLAN: CONCRETE REPAIRS AND MAINTENANCE TO 2 STORY PARKING GARAGE AS PER PLAN, NO CHANGE IN USE R2 S2, CONSTRUCTION TYPE 1B.**CERTIFIED CORRECTIONS SUBJECT TO FIE | $806,000 |
| 100915400 | 2021-04-05 | General construction | 3001 S MICHIGAN AVE | PARTIAL CONCRETE DEPTH REPAIRS AND OVERHEAD REPAIRS; REMOVAL AND REPLACING OF DECK COATING, DRAIN REPAIRS | $635,405 |
| 100915400 | 2021-04-05 | General construction | 3001 S MICHIGAN AVE | PARTIAL CONCRETE DEPTH REPAIRS AND OVERHEAD REPAIRS; REMOVAL AND REPLACING OF DECK COATING, DRAIN REPAIRS | $635,405 |
| 100913634 | 2021-03-25 | General construction | 360 E SOUTH WATER ST | CAULKING AND TRAFFIC MEMBRANE AND EXPANSION JOINT REPAIRS OVERHEAD CONCRETE REPAIRS | $840,353 |
| 100913634 | 2021-03-25 | General construction | 360 E SOUTH WATER ST | CAULKING AND TRAFFIC MEMBRANE AND EXPANSION JOINT REPAIRS OVERHEAD CONCRETE REPAIRS | $840,353 |
| 100914239 | 2021-03-24 | General construction | 3920 N LAKE SHORE DR | EXTERIOR WALL, PARTIAL AND UNDERSIDE REPAIRS AT BASEMENTT STORAGE ROOM; APPROX 300 SW FT - NO STRUCTURAL WORK - SEPARATE ELECTRICAL PERMIT REQ'D; DOOR REPLACEMENT | $180,759 |
| 100914239 | 2021-03-24 | General construction | 3920 N LAKE SHORE DR | EXTERIOR WALL, PARTIAL AND UNDERSIDE REPAIRS AT BASEMENTT STORAGE ROOM; APPROX 300 SW FT - NO STRUCTURAL WORK - SEPARATE ELECTRICAL PERMIT REQ'D; DOOR REPLACEMENT | $180,759 |
| 100911741 | 2021-03-08 | General construction | 2605 S INDIANA AVE | PARTIAL DETPH REPAIRS AND OVERHEAD REPAIRS,(APPROX 8750 SQ FT)REMOVAL AND REPLACING OF DECK COATING.DRAIN REPAIRS WILL ALSO BE DONE | $1,208,713 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
