COMPANY RECORD · CHICAGO, IL
M. Fishman & Company — permit history in Chicago, IL
M. Fishman & Company appears on 64 Chicago permit records from 2006 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 64 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2006 | 1 |
| 2007 | 8 |
| 2008 | 4 |
| 2009 | 10 |
| 2010 | 3 |
| 2011 | 1 |
| 2012 | 3 |
| 2013 | 5 |
| 2014 | 3 |
| 2015 | 4 |
| 2016 | 5 |
| 2017 | 4 |
| 2018 | 5 |
| 2019 | 2 |
| 2020 | 1 |
| 2021 | 2 |
| 2022 | 1 |
| 2024 | 1 |
| 2026 | 1 |
Busiest year on record: 2009, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| R&C Plumbing Ltd | 19 | 2026-08-26 |
| Bdp Construction Inc | 8 | 2014-02-07 |
| Pl10572-Jp Construction Enterp | 5 | 2008-11-07 |
| Nech Electric Services Inc. | 4 | 2011-01-31 |
| S.D. Electric | 4 | 2016-09-04 |
| Jp Construction Enterprises In | 4 | 2009-08-24 |
| Cld Construction Inc | 3 | 2008-11-07 |
| Or Construction Inc | 3 | 2012-12-27 |
| Val's Heating/Cooling Co | 2 | 2010-12-03 |
| Val's HVAC | 2 | 2008-07-30 |
| Ga & Ga Mechanical | 2 | 2021-01-14 |
| Malek Heating & Cooling | 1 | 2013-01-03 |
23 companies are named alongside M. Fishman & Company on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 2602 N ST LOUIS AVE | 2026-08-26 |
| 2625 N KEDZIE AVE | 2024-02-02 |
| 2418 N SAWYER AVE | 2022-05-16 |
| 3401 W FULLERTON AVE | 2021-01-17 |
| 3409 W FULLERTON AVE | 2021-01-14 |
| 2650 N MILWAUKEE AVE | 2020-10-13 |
| 2708 N SAWYER AVE | 2019-10-16 |
| 2639 N SPAULDING AVE | 2019-03-28 |
| 2731 N MILWAUKEE AVE | 2018-11-28 |
| 2894 N MILWAUKEE AVE | 2018-05-15 |
| 2896 N MILWAUKEE AVE | 2018-05-15 |
| 2814 N TROY ST | 2018-02-13 |
| 2733 N MILWAUKEE AVE | 2017-08-11 |
| 2706 N SAWYER AVE | 2017-04-10 |
47 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $600,000, median $25,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
64 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B200508847 | 2026-08-26 | General construction | 2602 N ST LOUIS AVE | REPAIR OR IN-KIND REPLACEMENT OF 72 PLUMBING FIXTURES AS DESCRIBED IN PERMIT APPLICATION. INCLUDES REPAIR OR REPLACMENT OF PLUMBING PIPING. INCLUDES REPAIR OR REPLACEMENT OF PLUM | $112,000 |
| B200006343 | 2024-02-02 | General construction | 2625 N KEDZIE AVE | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 500 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. PARAPET REBUILDING: 250 SQ. FT. LOCATION: MASONRY REPAIR WORK. | $1,800 |
| 100971188 | 2022-05-16 | General construction | 2418 N SAWYER AVE | FIRE DAMAGED REPAIRS IN UNIT#2W, REPAIR/REPLACE DRYWALL AS NECESSARY, REPLACE KITCHEN AND BATHROOM CABINETS, REFINISH HARDWOOD FLOORING,P LUMBING FIXTURES SAE (NO STRUCTURAL WORK O | $43,000 |
| 100906014 | 2021-01-17 | General construction | 3401 W FULLERTON AVE | REPAIR & REPLACE BATHROOM FLOOR, WALL TILE, KITCHEN CABINETS, DOORS, HARDWARE, SAND EXISTING WOOD FLOORS, PLASTER, AND PAINT 3 APARTMENTS. PLUMBING FIXTURES(TOILET, SINK AND SHOWER | $63,500 |
| 100902857 | 2021-01-14 | General construction | 3409 W FULLERTON AVE | SC -2019 CBRC- WORK IS FOR INTERIOR RENOVATION TO ONE (1) APARTMENT UNIT (UNIT 3A) OVER COMMERCIAL SPACE IN A THREE STORY BUILDING. NO FIRST FLOOR OR EXTERIOR SCOPE. CURRENT USE R- | $60,000 |
| 100895430 | 2020-10-13 | General construction | 2650 N MILWAUKEE AVE | WORK IN (1) GROUND LEVEL COMMERCIAL SPACE ONLY: REPLACE DRYWALL & NON FIRE RATED INTERIOR DOORS (WITH HARDWARE & TRIM). PAINT. TILE. REPLACE BATHROOM PLUMBING FIXTURES AND ASSOCIAT | $12,500 |
| 100846359 | 2019-10-16 | General construction | 2708 N SAWYER AVE | REPLACE DRYWALL, DOORS AND HARDWARE, REPLACE PLUMBING FIXTURES IN 2 COMMERICAL UNITS SAME LOCATION., PAINT, INSTALL VINYL FLOORING . | $8,500 |
| 100810804 | 2019-03-28 | General construction | 2639 N SPAULDING AVE | REPAIR OR REPLACE PLUMBING SUPPLY LINES ,DRAIN LINES, SAND & REFINISH FRONT ENTRY DOORS, REPAIR PLASTER, PAINT 5 STAIRWELLS, INSTALL NEW CERAMIC TILE IN 5 ENTRY LOBBYS AND CARPET A | $16,500 |
| 100794960 | 2018-11-28 | General construction | 2731 N MILWAUKEE AVE | ERECT NEW PARTIAL HEIGHT WALLS, AND INSTALL DOORS, INSTALL NEW AND REPAIR AND REPLACE DRYWALL, REPLACE DOORS AND HARDWARE, REPLACE WALL SINK | $11,500 |
| 100791272 | 2018-11-01 | General construction | 2639 N SPAULDING AVE | REPLACE FLOOR AND WALL TILE, REPLACE KITCHEN CABINETS, REPAIR PLASTER, REFINISH FLOORS AND REPLACE PLUMBING FIXTURES IN ALL 31 UNITS. PERMITS COVERS THE ADDRESS OF 2639-45 N. SPAUL | $0 |
| 100762099 | 2018-05-15 | General construction | 2894 N MILWAUKEE AVE | MASONRY REPAIRS AND TUCKPOINTING, INCLUDING GARAGE PARAPET WALL. REPLACE WINDOWS,PLASTER,CERAMIC TILES,FLOORING,KITCHEN CABINETS, 3 PLUMBING FIXTURES W/VALVES, ALL WORK SAE | $67,500 |
| 100762096 | 2018-05-15 | General construction | 2896 N MILWAUKEE AVE | MASONRY REPAIRS AND TUCKPOINTING, INCLUDING GARAGE PARAPET WALL. REPLACE WINDOWS,PLASTER,CERAMIC TILES,FLOORING,KITCHEN CABINETS, 3 PLUMBING FIXTURES W/VALVES, ALL WORK SAE | $67,500 |
| 100747225 | 2018-02-13 | General construction | 2814 N TROY ST | REPAIR AND REPLACE DRYWALL , KITCHEN CABINETS , CERMIC TILES ,REPLACEMENT OF PLUMBING FIXTURES ONLY IN ALL 6 UNITS (18) REPLACE ALL SHOWER VALVES, WINDOWS , DEFECTIVE GUTTERS , DOW | $34,000 |
| 100720329 | 2017-08-11 | General construction | 2733 N MILWAUKEE AVE | WORK IN 1 COMMERCIAL UNIT ON THE FIRST FLOOR AT 2733 N MILWAUKEE. REPLACE DOORS AND HARDWARE. INSTALL NEW LAMINATE FLOORING, PAINT, REPLACE 2 PLUMBING FIXTURES. ALL WORK SAME AS EX | $11,500 |
| 100720333 | 2017-08-11 | General construction | 2731 N MILWAUKEE AVE | WORK IN 1 COMMERCIAL UNIT ON THE FIRST FLOOR AT 2731 N MILWAUKEE. REPLACE DOORS AND HARDWARE. INSTALL NEW LAMINATE FLOORING, PAINT, REPLACE 2 PLUMBING FIXTURES. ALL WORK SAME AS EX | $11,500 |
| 100699683 | 2017-04-10 | General construction | 2706 N SAWYER AVE | REPLACE DRYWALL, DOORS. INSTALL NEW LAMINATE FLOORING. REPLACE PLUMBING FIXTURES 2 BATHROOMS. ALL WORK SAME AS EXISTING. | $1,500 |
| 100699699 | 2017-04-10 | General construction | 2741 N SPAULDING AVE | REPLACE DRYWALL, DOOR. INSTALL NEW LAMINATE FLOORING. REPLACE PLUMBING FIXTURES 2 BATHROOMS. ALL WORK SAME AS EXISTING. | $1,500 |
| 100680096 | 2016-11-17 | General construction | 3430 W DIVERSEY AVE | WORK ON 2ND. FLOOR OFFICE ONLY: REPLACE DRYWALL. ELECTRICAL PERMIT #100679609 ISSUED 11/15/2016. REPLACE PLUMBING FIXTURES. INSTALL OFFICE & DISPLAY CABINETRY. INSTALL NEW LAMINATE | $24,000 |
| 100664257 | 2016-09-04 | General construction | 2516 N KEDZIE BLVD | REPAIRS OF PARAPET WALLS, EAST ELEVATION WINDOW SILL, BALCONY COLUMNS I BEAMS AND MASONRY PIERS AS PER PLANS. | $75,000 |
| 100664515 | 2016-08-12 | General construction | 2787 N MILWAUKEE AVE | REPAIR DRYWALL INSTALL ACOUSTICAL TILE CEILING, INSTALL OFFICE AND DISPLAY CABINETRY, NEW HARDWARE, CARPET AND VINYL TILE.NO STRUCTURAL WORK SUBJECT TO FIELD INSPECTIONS. | $22,000 |
| 100650720 | 2016-05-18 | General construction | 2715 N MILWAUKEE AVE | REPAIR/REPLACE DRYWALL AS NEEDED IS UNITS 2731, 2733 & 2741. WORK IN THREE UNITS ONLY. | $0 |
| 100622269 | 2016-01-27 | General construction | 2769 N MILWAUKEE AVE | REHABILITATION OF EXISTING FACADE OF EXISTING CLASS F MERCANTILE 4 STORY BUILDING. CONSTRUCTION - CLASS 1A AS PER ARCHITECTURAL PLANS.(NO STRUCTURAL WORK)(CONDITIONAL PERMIT SUBJE | $104,010 |
| 100612845 | 2015-11-17 | General construction | 2740 N KEDZIE AVE | REMOVE AND REPLACE EXISTING EAST MASONRY FACADE WITH NEW MASONRY FACADE. ALSO, REMOVE DAMAGED MEZZANINE WOOD FLOOR FRAMING AND REPLACE WITH NEW WOOD ENGINEERED TRUSSES. MEZZANINE A | $100,000 |
| 100620981 | 2015-10-28 | General construction | 2645 N MILWAUKEE AVE | MASONRY REPAIR. REPLACE 300 BRICKS AND TUCKPOINTING 100 SQFT. REPLACE WINDOW WITH NEW GLASS AND ALUMINIUM STORE FRONT. | $1,500 |
| 100586629 | 2015-09-30 | General construction | 2769 N MILWAUKEE AVE | REHABILITATION OF EXISTING COMMERCIAL SPACES IN EXISTING 4 STORY MASONRY BUILDING AS PER PLANS.**CERTIFIED CORRECTIONS- - SUBJECT TO FIELD INSPECTIONS & AUDIT ** | $250,000 |
| 100610643 | 2015-08-21 | General construction | 1953 N CLYBOURN AVE | WORK IN SUITE R: REPLACE DRYWALL, DOORS & CELING TILE. CABINET. CARPET. TILE ELECTRICAL ON SEPARATE PERMIT- ALL WORK SAME AS EXISTING | $23,000 |
| 100560914 | 2014-11-05 | General construction | 2740 N KEDZIE AVE | REPAIR OF SOUTH EXTERIOR MASONRY WALL AS PER STRUCTURAL REPORT TO CORRECT BUILDING CODE VIOLATIONS | $25,000 |
| 100524953 | 2014-05-12 | General construction | 2740 N KEDZIE AVE | REPAIR OF ROOF TRUSS | $100,000 |
| 100526764 | 2014-02-07 | General construction | 2536 N SAWYER AVE | REPLACE CABINETS, PLUMBING FIXTURES IN 15 UNITS, STAIRWELL DOORS, BATHROOM FLOOR TILE & BATHROOM WALL TILE. REPAIR PLASTER AS NEEDED.- ELECTRICAL PERMIT # 100521819- ALL WORK SAME | $26,000 |
| 100522063 | 2013-12-23 | General construction | 2536 N SAWYER AVE | WORK IN THE FOLLOWING APTS: 103-08, 208-214, 301-05 & 405-410: REPLACE CARPET WITH LAMINATE FLOORING. REPLACE TILE (WALL & FLOOR) & CABINETS. PAINT (NO PLUMBING WORK)- ALL WORK SAM | $26,000 |
| 100518527 | 2013-11-27 | General construction | 2645 N MILWAUKEE AVE | CONVERSION OF EXCITING PANTRIES INTO BEDROOM CLOSETS AND RELOCATE THE DOORS OF (2) EXISTING CLOSETS. WORK TO ALSO INCLUDE REMOVE AND REPLACE PLUMBING FIXTURES, CABINETS, TRIM, PAIN | $25,000 |
| 100518426 | 2013-11-20 | General construction | 2615 N SPAULDING AVE | WORK TO BE DONE IN ALL 31 UNITS: REMOVE\REPLACE KITCHEN & BATHROOM CABINETS, BATHROOM FLOORING & WALL TILE, REFINISH HARDWOOD FLOORS & PAINT. REMOVE\REPLACE PLUMBING FIXTURES. ALL | $83,000 |
| 100497412 | 2013-08-06 | General construction | 3201 W FULLERTON AVE | INTERIOR RENOVATION OF EXISTING ONE STORY COMMERCIAL PHYSICAL FITNESS CENTER BUILDING | $120,000 |
| 100466622 | 2013-01-03 | General construction | 2642 N MILWAUKEE AVE | **SELF CERT PROJECT** - INTERIOR BUILD-OUT OF INTELLIGENTSIA CAFE IN AN EXISTING TENANT SPACE. AREA OF WORK 1275 SQF. (SUBJECT TO AUDIT & FIELD INSPECTION) | $1 |
| 100466961 | 2012-12-27 | General construction | 2946 W ARMITAGE AVE | **CERTIFIED PLAN CORRECTIONS** - NEW ADDITION TO EXISTING RESTAURANT TO ADD ACCESSIBLE TOILET ROOMS PER PLANS. (SUBJECT TO FIELD INSPECTION) | $60,000 |
| 100464372 | 2012-10-26 | General construction | 2642 N MILWAUKEE AVE | MASONRY WORK STORE FRONT REPLACE GLASS & ALUMINIUM TUCKPOINT ALL WORK TO STORE FRONT ONLY | $8,500 |
| 100449191 | 2012-07-13 | General construction | 2952 W ARMITAGE AVE | TUCKPOINT ENTIRE BUILDING (1,200 SQ. FT.) REPLACE DRYWALL ABOUT 100 SHEETS, ELECTRICAL PERMIT # 100448761 ISSUED 7/11/2012, REPLACE INTERIOR DOORS & 8 PLUMBING FIXTURES. NO WINDOW | $20,500 |
| 100353697 | 2011-01-31 | General construction | 3217 W FULLERTON AVE | EXTERIOR AND INTERIOR RENOVATION OF EXISTING MERCANTILE OCCUPANCY TO OFFICE OCCUPANCY PER PLANS | $150,000 |
| 100357467 | 2010-12-03 | General construction | 4025 N DAMEN AVE | INTERIOR AND EXTERIOR ALTERATIONS TO EXISTING 2 STORY FRAME BUILDING WITH COMMERCIAL ON FIRST FLOOR AND ONE RESIDENTIAL UNIT AT SECOND FLOOR PER PLANS. | $100,000 |
| 100363310 | 2010-10-12 | General construction | 2607 N MILWAUKEE AVE | STOREFRONT REPLACEMENT AS PER PLANS | $2,500 |
| 100315787 | 2010-02-04 | General construction | 2607 N MILWAUKEE AVE | STOREFRONT REPLACEMENT (31 PANES) | $40,000 |
| 100321489 | 2009-12-23 | General construction | 4701 N WINTHROP AVE | INTERIOR ALTERATION TO 1ST FLOOR OF EXISTING 3-STORY SINGLE USE DAY CARE FACILITY | $235,000 |
| 100322911 | 2009-12-07 | General construction | 2515 N MILWAUKEE AVE | ALL ELEVATIONS: MASON REPAIR WORK (REPLACE 200 BRICKS AS NEEDED ) RESET BRICKS AND STONE IF NEEDED, TUCK POINTING ALL WORK S.A.E. 500 SQ FT ( NO GRINDING OR STRUCTURAL ) | $8,500 |
| 100296317 | 2009-08-24 | General construction | 1949 W CUYLER AVE | DECONVERT 7DU INTO ORIGINAL6DU, RESTORE BASEMENT TO ORIGINAL USE PER PLANS | $25,000 |
| 100306789 | 2009-08-20 | General construction | 1949 W CUYLER AVE | REPAIR AND REPLACE DRYWALL AS NEEDED (200 SHEETS MAX.). REPLACE KITCHEN CABINETS, REPLACE CERAMIC FLOOR AND WALL TILE. REPLACE (24) PLUMBING FIXTURES PERMIT COVERS FIXTURE REPLACEM | $99,000 |
| 100274023 | 2009-08-06 | General construction | 2319 N KEDZIE BLVD | WINDOWS (REPLACEMENT ONLY): QTY 250 | $50,000 |
| 100300718 | 2009-07-28 | General construction | 3215 W FULLERTON AVE | INTERIOR DEMOLITION OF EXISTING VACANT COMMERCIAL SPACE PER PLANS | $15,000 |
| 100300512 | 2009-07-28 | General construction | 1949 W CUYLER AVE | REPLACE EXISTING 3 STORY REAR OPEN & ENCLOSED FRAME PORCH SYSTEM WITH NEW REAR OPEN STEEL PORCH SYSTEM AS PER PLANS TO CORRECT VIOLATIONS. | $25,000 |
| 100294837 | 2009-06-05 | General construction | 2319 N KEDZIE BLVD | MASONRY REPAIRS, TUCKPOINTING, REPLACE 8 LINTELS UP TO 4' LONG. NO STRUCTRUAL WORK. ALL WORK SAME ALL WORK SAME AS EXISTING. | $8,000 |
| 100282696 | 2009-04-24 | General construction | 2600 N KIMBALL AVE | DECONVERT 51 DU INTO 50 DU. REPLACE EXISTING WATER SUPPLY LINES, INTERIOR REPAIRS PER PLANS. NO HVAC, ELECTRICAL WORK UNDER BUILDING PERMITS #100282960 AND #100279832 | $15,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
