Dariusz Szydlowski's Electric — permit history in Chicago, IL
Dariusz Szydlowski's Electric appears on 382 Chicago permit records from 2006 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 382 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2006 | 23 |
| 2007 | 21 |
| 2008 | 28 |
| 2009 | 26 |
| 2010 | 16 |
| 2011 | 14 |
| 2012 | 13 |
| 2013 | 27 |
| 2014 | 54 |
| 2015 | 39 |
| 2016 | 25 |
| 2017 | 17 |
| 2018 | 12 |
| 2019 | 12 |
| 2020 | 11 |
| 2021 | 13 |
| 2022 | 12 |
| 2023 | 11 |
| 2024 | 7 |
| 2026 | 1 |
Busiest year on record: 2014, with 54 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| A.L.L. Builders, LLC | 28 | 2016-01-15 |
| Polo Masonry Builders, Inc. | 28 | 2016-01-15 |
| Pro Mc Construction, Inc. | 26 | 2016-01-15 |
| Artistic Construction, LLC | 13 | 2017-04-03 |
| Artifex, Incorporated | 8 | 2014-10-06 |
| Po Construction & Design Co. | 7 | 2020-07-06 |
| Anyway Concrette Inc. | 6 | 2017-01-26 |
| Jan And Magy Construction Inc. | 5 | 2009-03-25 |
| Richard And Sons | 5 | 2012-07-02 |
| Z & V Home Improvement, Inc. | 3 | 2015-06-30 |
| Jerry Construction Inc. | 3 | 2016-01-27 |
| Iso Cover Construction, Inc. | 2 | 2020-07-06 |
58 companies are named alongside Dariusz Szydlowski's Electric on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1425 W ROSCOE ST | 2026-08-13 |
| 600 W KINZIE ST | 2024-06-09 |
| 3838 N HOYNE AVE | 2020-07-06 |
| 4824 N MONT CLARE AVE | 2017-05-24 |
| 1303 W GLENLAKE AVE | 2017-05-16 |
| 1553 N BELL AVE | 2017-04-03 |
| 1143 E 46TH ST | 2017-03-15 |
| 2232 N SEMINARY AVE | 2017-01-26 |
| 2744 N MOZART ST | 2016-10-28 |
| 5159 S AUSTIN AVE | 2016-09-21 |
| 1810 W HURON ST | 2016-09-13 |
| 2032 N FREMONT ST | 2016-09-11 |
| 1442 N WIELAND ST | 2016-09-11 |
| 3641 N PONTIAC AVE | 2016-06-22 |
187 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $100 to $1,950,000, median $5,650. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
382 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B200480374 | 2026-08-13 | Electrical | 1425 W ROSCOE ST | LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 10 . LIGHTING OUTLETS: 5. SPECIFIC LOCATION: 1ST FLOOR BATH AND KITCHEN. | $3,500 |
| B101049994 | 2024-06-09 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN A CHOCOLATE FACTORY. | $2,000 |
| B101050802 | 2024-06-09 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON THE ELECTRICAL EQUIPMENT IN A CHOCOLATE FACTORY. | $3,000 |
| B101045548 | 2024-04-30 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. | $4,000 |
| B101041629 | 2024-02-13 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. - UPDATE SCADA SYSTEMS WITH ADDITIONAL FIELD DEVICES. - REPLACEMENT OF THE TEMPERING UNIT FOR THE MOLDING LINE 1. | $5,000 |
| B101043486 | 2024-02-13 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON THE ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. - REWIRE CONTROLS FOR OIL STORAGE TANKS 101-109. | $6,000 |
| B101037575 | 2024-01-09 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY. - UPDATE CONTROLS FOR 3RD FLOOR STORAGE TANKS. - UPDATE CONTROLS FOR PASTE DEP. BATCHES CONTROLS. | $6,000 |
| B101039639 | 2024-01-09 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. - UPDATE CONTROLS SYSTEM FOR PUMPING AND STORAGE TANKS. | $6,000 |
| B101026778 | 2023-11-02 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY PLANT; - UPDATE PLANT OT COMMUNICATION SYSTEM FOR MANUFACTURING PROCESSES. | $8,000 |
| B101030412 | 2023-11-02 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. - INSTALL A REPLACEMENT CONTROL PANEL FOR BUTTER ADDITIONS TANKS FOR THE PASTE DEP.- WIRE NEW LEVEL SENSORS FOR STOR | $5,000 |
| B101035418 | 2023-11-02 | Electrical | 600 W KINZIE ST | SCHEDULED PMS OF ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. - UPDATE SCADA CONTROLS FOR TANKS TNK300-TNK390. | $6,000 |
| B101019232 | 2023-08-07 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. - UPDATE CONTROLS FOR STORAGE TANKS TNK125-TNK125. - REWIRE CONTROLS FOR LEVEL SENSORS ON OIL TANKS TNK101-TNK109. | $5,000 |
| B101022821 | 2023-08-07 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE THE CHOCOLATE FACTORY. - THERMAL SCAN OF MAIN DISTRIBUTIONS ON 4 SERVICES. - REWIRE CONTROLS FOR MOLDING RM. FEED LINES. - REWIRE OIL A | $6,000 |
| B101011326 | 2023-06-05 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN A CHOCOLATE FACTORY. - WIRE LEVEL SENSORS FOR MOLDING FEED LINES. - UPDATE STORAGE TANKS TNK111-TNK118 TO THE NEW CONTROL SYSTEM. - WIRE LI | $12,000 |
| B101015452 | 2023-06-05 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY PLANT; - WIRE NEW LEVEL SENSORS FOR NI SILOS 1-4; - UPDATE CONTROLS FOR STORAGE TANKS 120-123; - REWIRE HEAT TRACE | $5,000 |
| B101005116 | 2023-06-05 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY. | $3,000 |
| B101007505 | 2023-06-05 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE PLANT. - REWIRE FIRE SUPPRESSION SYSTEM VALVES AND ACTUATORS FOR ROASTERS. - WIRE STEEL BELT INTERLOCKS ON REFINING. - REWIRE | $5,000 |
| B100998766 | 2023-02-09 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY. - REPLACE OLD TEMPERING TUBES WIRING FOR MOLDING LINES 2 AND 3. | $3,000 |
| B101001468 | 2023-02-09 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT IN THE CHOCOLATE FACTORY. - WIRE REPLACEMENT MOLD TEMPER UNITS FOR LINES 2 AND 3. - INSTALL AND WIRE NEW HEAT TRACE CIRCUITS FOR MOLDING LINES | $6,000 |
| B100987534 | 2022-12-07 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY. - WIRE NEW HEAT TRACE CIRCUIT CONTROLLER AND HEAT TRACE CIRCUITS IN THE LS AREA. - ROASTING POWER AND CONTROLS TES | $5,000 |
| B100995077 | 2022-12-07 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY. - REPAIRS ON WIRING FOR ROASTER A POWER AND CONTROLS. - WIRE ADDITIONAL HEAT TRACE CIRCUITS FOR THE LS AREA. | $3,000 |
| B100983619 | 2022-12-07 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE MANUFACTURING FACILITY; - REWIRE CIRCUITS FOR LIGHTS AND RECEPTACLES IN THE ROASTING DEPARTMENT. REPAIRS AND REPLACEMENT OF P | $15,000 |
| B100990979 | 2022-12-07 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE MANUFACTURING PLANT. WIRE REPLACEMENT TEMPER UNITS FOR MOLDING L2 AND L3. WIRE HEAT TRACE PANEL FOR TANK FARM HEATING CKTS. | $5,000 |
| B100979201 | 2022-12-07 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY. - REPLACE LIGHT FIXTURES IN THE FRONT LOBBY. - RELOCATE VISUAL MONITORS FOR THE SECURITY OFFICE. | $4,000 |
| B100971119 | 2022-07-07 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE MANUFACTURING PLANT; - WIRE REPLACEMENT METAL DETECTORS FOR PRODUCTION LINES. | $4,500 |
| B100974841 | 2022-07-07 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY; - WIRE REPLACEMENT HVAC UNIT 3A FOR WAREHOUSE; MOLDING LINE 3 SPILL PREVENTION UPDATE. | $5,500 |
| B100965411 | 2022-05-10 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY; - UPDATE CONTROLS ON DROP LINE 3; UPDATE CONTROLS ON BAUERMEISTER SYSTEM. | $3,500 |
| B100957725 | 2022-04-04 | Electrical | 600 W KINZIE ST | SCHEDULED PM ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY. | $5,000 |
| B100954680 | 2022-04-04 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY PLANT. | $3,500 |
| B100961250 | 2022-04-04 | Electrical | 600 W KINZIE ST | SCHEDULED PM ON THE ELECTRICAL SYSTEMS INSIDE CHOCOLATE FACTORY PLANT. - REPLACE AND REWIRE ILLUMINATION FIXTURES IN THE WASH AREA. | $3,500 |
| B100951105 | 2022-01-08 | Electrical | 600 W KINZIE ST | PLANNED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY PLANT; WIRE FANS ON STEAM HEATERS IN THE SHIPPING DOCK BAY AREA. | $5,500 |
| B100939038 | 2021-12-06 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY; - REPAIR FINDINGS FROM THE THERMAL SCAN ON EQUIPMENT; TANKS TK-122, TK-123 CONTROLS UPDATE. | $6,500 |
| B100934025 | 2021-12-06 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY; - UPDATE SUMP PUMPS SYSTEM FOR BASEMENT; UPDATE FOR DROP CP3-50: AVS, PUMPS, CONTROLS. | $6,500 |
| B100948057 | 2021-12-06 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE MANUFACTURING FACILITY; - WORK ON OUTSIDE LIGHTING TO REPLACE/REWIRE OLD FIXTURES WITH LEDS. | $5,000 |
| B100943237 | 2021-12-06 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT; - REWIRE CONTROLS FOR TNK-363, TNK-364, TNK-365; - UPDATE ILLUMINATION ON THE HUBBARD ST. SIDE OF THE BUILDING. | $6,500 |
| B100930027 | 2021-07-20 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE MANUFACTURING PLANT. | $3,500 |
| B100925396 | 2021-07-19 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY; - WIRE SPILL PREVENTION FOR MOLDING LINES 2 AND 3; - PUMPING SYSTEM UPDATE. | $5,000 |
| B100898227 | 2021-07-19 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY PLANT. - REPLACE EXISTING LIGHT FIXTURES WITH LEDS AT BEANS ROUTE TO VIADUCT. - WIRE POWER AND CONTROLS FOR LIQUOR BL | $8,500 |
| B100916940 | 2021-07-19 | Electrical | 600 W KINZIE ST | -SCHEDULED PMS ON ELECTRICAL EQUIPMENT; - REWIRE BASEMENT SUMP PUMPS. | $6,000 |
| B100911692 | 2021-07-19 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY PLANT; - WIRE NEW GUARDS FOR PRESSES 1 AND 2. | $5,500 |
| B100901908 | 2021-07-19 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY PLANT; - UPDATE OUTSIDE ILLUMINATION AT BEANS UNLOADING AND TRUCKS ROUTES. | $6,000 |
| B100904768 | 2021-07-19 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY PLANT; - WIRE MELTING UNIT FOR LIQUOR BLOCKS. | $3,500 |
| B100908022 | 2021-07-19 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY; - WIRE NEW MELTING TANK FOR LIQUOR BLOCKS. | $5,500 |
| B100921233 | 2021-07-19 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY; - WIRE AND INSTALL A NEW CONTROL PANEL FOR OLD BOILER ROOM SUMP PUMPS. | $5,000 |
| B100894762 | 2020-10-13 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY; - REPLACE BACKUP BATTERIES ON EMERGENCY FIXTURES, ANNUAL PMS; - WIRE NEW POWER SOURCE TO THE PLANT PUMPING SYSTEM | $6,000 |
| B100890225 | 2020-09-22 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY PLANT; - UPDATE CONTROLS FOR PUMPING SYSTEM. | $5,500 |
| B100886249 | 2020-08-11 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE A CHOCOLATE FACTORY PLANT. | $5,500 |
| B100880776 | 2020-07-21 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY. - UPDATE CONTROL PANEL #CP1-35 FOR THE PUMPING SYSTEM CONTROL SYSTEM. | $5,500 |
| 100873793 | 2020-07-06 | Electrical | 3838 N HOYNE AVE | COMBINING 2 DWELLING UNITS IN MULTI FAMILY DWELLING TO CREATE SINGLE FAMILY DWELLING WITH ONE STORY ADDITION. FULL RENOVATION OF EXISTING DWELLING. EXISTING GARAGE TO REMAIN. | $575,950 |
| B100877004 | 2020-06-11 | Electrical | 600 W KINZIE ST | SCHEDULED PMS ON ELECTRICAL EQUIPMENT INSIDE CHOCOLATE FACTORY; - REPLACE AND REWIRE EXHAUST FANS FLOORS 1,2,3 AND 4, WIRE TEMPERATURE CONTROLS FOR TANKS TK340-TK342. | $6,500 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →