COMPANY RECORD · CHICAGO, IL
Central Building Preservation — permit history in Chicago, IL
Central Building Preservation appears on 104 Chicago permit records from 2021 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 104 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 20 |
| 2022 | 18 |
| 2023 | 14 |
| 2024 | 18 |
| 2025 | 16 |
| 2026 | 18 |
Busiest year on record: 2021, with 20 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| F.E. Moran Inc | 3 | 2024-03-15 |
| Abco Electrical Construction | 2 | 2021-09-07 |
| Westside Mechanical, Inc | 2 | 2021-09-07 |
| Ashland Plumbing & Heating Co. | 1 | 2026-07-16 |
| Dexter Electric Group LLC | 1 | 2025-09-23 |
| Dw Mechanical Group,Inc. | 1 | 2022-02-24 |
| Elite Heating & Cooling | 1 | 2026-07-16 |
| Emcor Services Team Mech | 1 | 2024-03-15 |
| Heatmasters Mechanical LLC | 1 | 2026-05-04 |
| Kordick Electric Company | 1 | 2024-03-15 |
| Norman Mechanical | 1 | 2026-05-04 |
| Northshore Plumbing & Sewer | 1 | 2025-09-23 |
15 companies are named alongside Central Building Preservation on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 7033 N KEDZIE AVE | 2026-08-21 |
| 728 W JACKSON BLVD | 2026-08-19 |
| 260 E CHESTNUT ST | 2026-08-19 |
| 220 S MICHIGAN AVE | 2026-08-06 |
| 6317 N BROADWAY | 2026-07-23 |
| 2430 N LAKEVIEW AVE | 2026-07-16 |
| 209 E LAKE SHORE DR | 2026-07-08 |
| 8 S MICHIGAN AVE | 2026-07-02 |
| 3400 N LAKE SHORE DR | 2026-05-28 |
| 5555 N SHERIDAN RD | 2026-05-28 |
| 6460 N KENMORE AVE | 2026-05-28 |
| 1335 N ASTOR ST | 2026-05-22 |
| 500 N MICHIGAN AVE | 2026-05-04 |
| 659 W RANDOLPH ST | 2026-04-06 |
80 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $111 to $8,471,039, median $200,425. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
104 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B200508297 | 2026-08-21 | General construction | 7033 N KEDZIE AVE | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 9400 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. CONCRETE MASONRY REPAIR / REPLACEMNT: 570SQ. FT., EXCAVATION = NO. LOCATION: ALL 4 E | $2,086,100 |
| B200480969 | 2026-08-19 | General construction | 728 W JACKSON BLVD | CONCRETE MASONRY REPAIR / REPLACEMNT: 10SQ. FT., EXCAVATION = NO. LOCATION: NORTH, SOUTH AND EAST. | $79,300 |
| B200507498 | 2026-08-19 | General construction | 260 E CHESTNUT ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 150 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. CONCRETE MASONRY REPAIR / REPLACEMNT: 400SQ. FT., EXCAVATION = NO. LOCATION: OPEN AIR | $330,450 |
| B200477523 | 2026-08-06 | General construction | 220 S MICHIGAN AVE | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 700 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. CONCRETE MASONRY REPAIR / REPLACEMNT: 4SQ. FT., EXCAVATION = NO. PARAPET REBUILDING: | $342,575 |
| B200479673 | 2026-07-23 | General construction | 6317 N BROADWAY | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 1 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: WEST ELEVATION, NORTH END. | $15,000 |
| 101082698 | 2026-07-16 | General construction | 2430 N LAKEVIEW AVE | SELF CERT 2019 CBRC WITH STRUCTURAL PEER REVIEW: INTERIOR AND EXTERIOR ALTERATIONS TO EXISTING RESIDENTIAL CONDO UNITS 5N AND 6N. WORK TO INCLUDE DEMO, NEW PARTITIONS, NEW STRUCTUR | $3,080,000 |
| B200477824 | 2026-07-08 | General construction | 209 E LAKE SHORE DR | FOR PERMIT 101079995: ADDITIONAL MASON CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE. | |
| B200472973 | 2026-07-02 | General construction | 8 S MICHIGAN AVE | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 10 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: SOUTH, LEVELS 27 AND 28. | $30,000 |
| B200470503 | 2026-05-28 | General construction | 3400 N LAKE SHORE DR | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 500 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. CONCRETE MASONRY REPAIR / REPLACEMNT: 30SQ. FT., EXCAVATION = NO. LOCATION: ALL ELEVA | $143,985 |
| B200470269 | 2026-05-28 | General construction | 5555 N SHERIDAN RD | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 2000 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. CONCRETE MASONRY REPAIR / REPLACEMNT: 300SQ. FT., EXCAVATION = NO. LOCATION: NORTH, | $4,723,133 |
| B200470645 | 2026-05-28 | General construction | 6460 N KENMORE AVE | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 2000 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. PARAPET REBUILDING: 40 SQ. FT. LOCATION: NORTH ONLY. | $366,170 |
| B200469521 | 2026-05-22 | General construction | 1335 N ASTOR ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 2200 SQ. FT., LINTEL QTY. 30, MAX. LENGTH 8. CONCRETE MASONRY REPAIR / REPLACEMNT: 400SQ. FT., EXCAVATION = NO. PARAPET REBUILDI | $1,319,000 |
| 101073249 | 2026-05-04 | General construction | 500 N MICHIGAN AVE | DDS 2019 CBRC: DDS 2019 CBRC: INTERIOR DEMOLITION ONLY AT EXISTING 24-STORY OFFICE BUILDING. DEMO TO INCLUDE NON-LOAD BEARING PARTITIONS , SLAB OPENINGS AND OBSOLETE MECHANICAL EQU | $2,750,000 |
| B200463044 | 2026-04-06 | General construction | 659 W RANDOLPH ST | CONCRETE MASONRY REPAIR / REPLACEMNT: 10SQ. FT., EXCAVATION = NO. LOCATION: WEST ELEVATION. | $339,215 |
| B200463744 | 2026-03-30 | General construction | 150 W EUGENIE ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 50 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: UNIT 26 CHIMNEY. | $17,000 |
| B200460839 | 2026-03-20 | General construction | 1300 N ASTOR ST | CONCRETE MASONRY REPAIR / REPLACEMNT: 3000SQ. FT., EXCAVATION = YES. LOCATION: EXPOSED CONCRETE COLUMNS ON EXTERIOR. | $1,271,885 |
| B200460808 | 2026-03-05 | General construction | 50 E CHESTNUT ST | CONCRETE MASONRY REPAIR / REPLACEMNT: 250SQ. FT., EXCAVATION = NO. LOCATION: ALL FOUR BUILDING ELEVATIONS. | $1,921,070 |
| B200454578 | 2026-02-06 | General construction | 1006 S MICHIGAN AVE | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 500 SQ. FT., LINTEL QTY. 6, MAX. LENGTH 5. LOCATION: EAST ELEVATION. | $400,000 |
| 101071930 | 2025-09-23 | General construction | 1500 N LAKE SHORE DR | INTERIOR ALTERATIONS TO EXISTING BUILDING UNIT 24A. INTERIOR WORK TO INCLUDE DEMO, NEW PARTITIONS, MECHANICAL, ELECTRICAL AND PLUMBING. EXTERIOR WORK INCLUDES REPLACEMENT OF WINDOW | $2,852,102 |
| B200442187 | 2025-09-18 | General construction | 257 E DELAWARE PL | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 2000 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: EAST ELEVATION AT NORTH END OF BUILDING. | $162,500 |
| B200441129 | 2025-09-18 | General construction | 20 E CEDAR ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 120 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: SOUTH ELEVATION. | $100,000 |
| B200442098 | 2025-09-16 | General construction | 1255 N STATE PKWY | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 50 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. CONCRETE MASONRY REPAIR / REPLACEMNT: 4SQ. FT., EXCAVATION = NO. LOCATION: NORTH AND S | $85,200 |
| B200440160 | 2025-09-02 | General construction | 6364 N SHERIDAN RD | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 1 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: ALL ELEVATIONS. | $840,000 |
| B200435982 | 2025-08-12 | General construction | 3314 N LAKE SHORE DR | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 300 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: EAST BUILDING ELEVATION. | $70,000 |
| B200436956 | 2025-08-08 | General construction | 6157 N SHERIDAN RD | CONCRETE MASONRY REPAIR / REPLACEMNT: 350SQ. FT., EXCAVATION = NO. LOCATION: WEST ELEVATION. | $488,550 |
| B200427868 | 2025-06-10 | General construction | 6833 N KEDZIE AVE | CONCRETE MASONRY REPAIR / REPLACEMNT: 91SQ. FT., EXCAVATION = NO. LOCATION: CONCRETE BALCONY TIERS. | $160,400 |
| B200425510 | 2025-05-27 | General construction | 5555 N SHERIDAN RD | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 1250 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. CONCRETE MASONRY REPAIR / REPLACEMNT: 155SQ. FT., EXCAVATION = NO. LOCATION: SOUTH A | $1,672,505 |
| B200423534 | 2025-05-09 | General construction | 505 N MICHIGAN AVE | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 25 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: SOUTH ELEVATION, 35TH FLOOR. | $183,648 |
| 101058493 | 2025-04-22 | General construction | 2420 S MICHIGAN AVE | SPR 2019 CBC - ADDRESSING OPEN BUILDING VIOLATIONS & REPAIRS TO EXISTING 2-STORY COMMERCIAL BRICK BUILDING (B-OCCUPANCY; TYPE III-A CONSTRUCTION) | $30,000 |
| B200419808 | 2025-04-09 | General construction | 169 W HURON ST | CONCRETE MASONRY REPAIR / REPLACEMNT: 10SQ. FT., EXCAVATION = NO. LOCATION: NORTH, SOUTH, EAST AND WEST. | $415,990 |
| B200419227 | 2025-04-07 | General construction | 140 S DEARBORN ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 50 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: LIGHT COURT. | $812,747 |
| B200415592 | 2025-03-18 | General construction | 1500 N LAKE SHORE DR | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 10000 SQ. FT., LINTEL QTY. 10, MAX. LENGTH 3. LOCATION: NORTH, SOUTH, AND WEST ELEVATIONS. | $904,650 |
| B200417478 | 2025-03-18 | General construction | 150 W EUGENIE ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 470 SQ. FT., LINTEL QTY. 1, MAX. LENGTH 5. LOCATION: TERRACE. | $72,250 |
| B200413329 | 2025-02-20 | General construction | 8 W CHESTNUT ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 2550 SQ. FT., LINTEL QTY. 84, MAX. LENGTH 4. LOCATION: ALL 4 EXTERIOR ELEVATIONS OF BUILDING.. | $2,132,700 |
| B200406393 | 2024-12-03 | General construction | 1611 N BELL AVE | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 150 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: WEST AND SOUTH ELEVATIONS. | $75,970 |
| B200400973 | 2024-10-23 | General construction | 5555 N SHERIDAN RD | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 75 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. CONCRETE MASONRY REPAIR / REPLACEMNT: 50SQ. FT., EXCAVATION = NO. LOCATION: GROUND LEV | $286,240 |
| B200400576 | 2024-10-16 | General construction | 1335 N ASTOR ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 250 SQ. FT., LINTEL QTY. 10, MAX. LENGTH 5. LOCATION: NORTH, SOUTH AND EAST REPAIRS. | $153,950 |
| B200028122 | 2024-09-27 | General construction | 1200 N LAKE SHORE DR | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 200 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. PARAPET REBUILDING: 80 SQ. FT. LOCATION: NORTH ELEVATION OF THE FAÇADE. | $289,325 |
| B200028606 | 2024-09-16 | General construction | 4950 N MARINE DR | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 1150 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. CONCRETE MASONRY REPAIR / REPLACEMNT: 150SQ. FT., EXCAVATION = NO. LOCATION: ALL ELE | $244,300 |
| B200024215 | 2024-08-29 | General construction | 1601 W SCHOOL ST | CONCRETE MASONRY REPAIR / REPLACEMNT: 320SQ. FT., EXCAVATION = NO. LOCATION: PARKING GARAGE BELOW (IN THE BASEMENT). | $347,585 |
| B200024134 | 2024-08-09 | General construction | 7 W MADISON ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 4 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: SOUTHEAST CORNER OF BUILDING. | $29,875 |
| B200023133 | 2024-07-22 | General construction | 260 E CHESTNUT ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 8000 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: ALL FOUR ELEVATIONS OF DETACHED GARAGE STRUCTURE. | $549,910 |
| B200022533 | 2024-07-18 | General construction | 1701 N CRILLY CT | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 1200 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: FIRST FLOOR, WEST ELEVATION OF BUILDING. | $200,425 |
| B200022815 | 2024-07-18 | General construction | 2100 N LINCOLN PARK WEST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 2000 SQ. FT., LINTEL QTY. 15, MAX. LENGTH 6. CONCRETE MASONRY REPAIR / REPLACEMNT: 10SQ. FT., EXCAVATION = NO. LOCATION: NORTH, | $802,720 |
| B200020791 | 2024-07-08 | General construction | 1351 W EVERGREEN AVE | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 50 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. PARAPET REBUILDING: 50 SQ. FT. LOCATION: WEST PARAPET. | $403,160 |
| B200021992 | 2024-07-08 | General construction | 150 N ASHLAND AVE | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 600 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: NORTH WALL. | $105,000 |
| B200016013 | 2024-06-06 | General construction | 25 E WASHINGTON ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 210 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: FAÇADE INSPECTIONS + REPAIRS. | $101,055 |
| B200015064 | 2024-05-07 | General construction | 20 E CEDAR ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 500 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: WEST ELEVATION PRIVATE TERRACE MAINTENANCE. | $65,500 |
| B200011080 | 2024-03-21 | General construction | 908 W ARGYLE ST | TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 2318 SQ. FT., LINTEL QTY. 59, MAX. LENGTH 12. LOCATION: FULL FACADE INSPECTIONS + REPAIRS PER ARCHITECT'S DRAWING | $1,462,435 |
| 101038935 | 2024-03-15 | General construction | 209 E LAKE SHORE DR | SELF-CERT 2019 CBRC: ALTERATIONS TO AN EXISTING RESIDENTIAL UNIT 6E ON THE 6TH FLOOR IN AN EXISTING HIGH RISE MULTI-UNIT RESIDENTIAL BUILDING AS PER PLANS. WORK TO INCLUDE DEMOLITI | $650,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
