COMPANY RECORD · MIAMI-DADE COUNTY, FL

Empire Solar Power Energy Inc — permit history in Miami-Dade County, FL

Empire Solar Power Energy Inc appears on 35 Miami-Dade County permit records from 2024 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical35100%

Activity by year

YearPermits issued
20244
202519
202612

Busiest year on record: 2025, with 19 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
11530 SW 138 ST2026-08-06
18860 SW 354 TER2026-07-27
46 NE 164 ST2026-07-17
1220 NE 206 ST2026-07-13
15235 SW 152 CT2026-05-18
2115 NW 129 ST2026-05-13
9816 SW 146 PL2026-04-30
20862 SW 121 AVE2026-03-31
11530 SW 140 TER2026-03-09
20956 SW 123 AVE2026-02-09
9730 NW 19 AVE2026-02-02
320 SW 125 AVE2026-01-15
15263 SW 102 PL2025-12-30
3621 SW 132 AVE2025-12-29

34 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $2,000 to $150,000, median $49,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

35 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
20260633972026-08-06Electrical11530 SW 138 STSOLAR PANEL$49,000
20260609602026-07-27Electrical18860 SW 354 TERROOF TOP SOLAR$40,000
20260590432026-07-17Electrical46 NE 164 STROOF TOP SOLAR$40,000
20260577822026-07-13Electrical1220 NE 206 STROOF MT SOLAR PANEL$50,000
20260462692026-05-18Electrical15235 SW 152 CTSOLAR SYSTEM$80,000
20260452522026-05-13Electrical2115 NW 129 STROOFTOP SOLAR PV$51,000
20260427982026-04-30Electrical9816 SW 146 PLSOLAR PV$48,000
20260359302026-03-31Electrical20862 SW 121 AVEROOF SOLAR$50,000
20260307402026-03-09Electrical11530 SW 140 TERSOLAR PANEL$42,000
20260250882026-02-09Electrical20956 SW 123 AVEPV SYSTEM$60,000
20260235742026-02-02Electrical9730 NW 19 AVESOLAR$57,000
20260204892026-01-15Electrical320 SW 125 AVEPV SYSTEM$150,000
20260176812025-12-30Electrical15263 SW 102 PLSOLAR PV$51,000
20260174502025-12-29Electrical3621 SW 132 AVESOLAR PANEL$93,000
20260151432025-12-15Electrical22950 SW 172 CTSOLAR SYSTEM$41,000
20260141882025-12-10Electrical1310 NW 113 TERSOLAR PANEL$52,000
20260114822025-11-24Electrical11745 SW 232 LNROOF MT SOLAR PANEL$10,000
20260106402025-11-19Electrical13957 SW 8 TERSOLAR SYSTEM$55,000
20260070822025-11-03Electrical10210 SW 30 STPV SOLAR INSTALL$33,018
20260055892025-10-27Electrical3000 SW 102 AVESOLAR PANEL$45,000
20260048402025-10-22Electrical25 NW 127 AVESOLAR PANEL ROOF$77,000
20250738872025-09-23Electrical19755 SW 304 STROOF SOLAR SYSTEM$25,000
20250705992025-09-09Electrical3001 SW 102 PLROOF TOP SOLAR$76,000
20250658522025-08-15Electrical14122 SW 80 STROOF TOP SOLAR$60,000
20250641072025-08-08Electrical670 NE 191 TERSOLAR SYSTEM$42,000
20250550842025-06-30Electrical12105 SW 181 STSOLAR PV$30,000
20250415562025-04-30Electrical891 NE 193 TERSOLAR PANELS$8,000
20250317052025-03-18Electrical18335 SW 136 CTPV SYSTEM$50,000
20250248482025-02-12Electrical4855 NW 191 STROOF TOP SOLAR INST$130,000
20250206532025-01-23Electrical13032 SW 141 STPV SOLAR SYSTEM$2,000
20250194442025-01-16Electrical420 NE 12 STROOF TOP SOLAR$3,000
20250114942024-11-26Electrical12105 SW 183 STSOLAR PANELS$15,000
20250103912024-11-20Electrical420 NE 12 STROOF TOP SOLAR$3,000
20250031372024-10-17Electrical9410 SW 12 STRFTOP SOLAR$41,000
20240709562024-09-03Electrical20301 SW 117 AVEROOF SOLAR SYSTEM$55,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Miami-Dade County permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →