COMPANY RECORD · MIAMI-DADE COUNTY, FL

Bunddlex LLC Dba:Equity Solar — permit history in Miami-Dade County, FL

Bunddlex LLC Dba:Equity Solar appears on 29 Miami-Dade County permit records from 2024 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical29100%

Activity by year

YearPermits issued
20241
202520
20268

Busiest year on record: 2025, with 20 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
12360 SW 96 ST2026-08-27
1410 SW 126 PL2026-08-18
99 NW 145 ST2026-03-23
19675 SW 214 ST2026-02-02
10705 SW 44 ST2026-01-21
16200 SW 100 CT2026-01-12
8528 SW 121 ST2025-12-17
440 NE 116 ST2025-12-11
14644 SW 63 TER2025-10-15
15429 SW 62 ST2025-09-03
3350 SW 105 AVE2025-08-14
12615 SW 256 TER2025-08-01
4620 SW 133 AVE2025-07-07
228 NE 117 ST A2025-06-03

19 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $9,249 to $170,349, median $19,401. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

29 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
20260678452026-08-27Electrical12360 SW 96 STSOLAR SYSTEM$29,290
20260664842026-08-20Electrical12360 SW 96 STSOLAR SYSTEM$29,290
20260657142026-08-18Electrical1410 SW 126 PLSOLAR PANELS$35,120
20260339942026-03-23Electrical99 NW 145 STSOLAR PANELS$14,889
20260235512026-02-02Electrical19675 SW 214 STSOLAR PV SYSTEM$27,793
20260211312026-01-21Electrical10705 SW 44 STSOLAR SYSTEM$25,312
20260194792026-01-12Electrical16200 SW 100 CTSOLAR PV ROOF MOUNT$17,830
20260192172026-01-09ElectricalPV SOLAR SYSTEM$19,401
20260158392025-12-17Electrical8528 SW 121 STROOFTOP SOLAR SYSTM$29,283
20260146162025-12-11Electrical440 NE 116 STSOLAR YSTEM$14,393
20260091182025-11-13ElectricalPV SOLAR SYSTEM$19,401
20260031032025-10-15Electrical14644 SW 63 TERROOFTOP SOLAR$14,067
20250694562025-09-03Electrical15429 SW 62 STSOLAR SYSTEM ELEC$21,043
20250691922025-09-02Electrical15429 SW 62 STSOLAR SYSTEM$21,043
20250654692025-08-14Electrical3350 SW 105 AVEROOF KW SOLAR SYSTM$9,249
20250651272025-08-13Electrical3350 SW 105 AVEROOF KW SOLAR SYSTM$9,249
20250626042025-08-01Electrical12615 SW 256 TERROOF PV SOLAR SYSTM$14,799
20250563662025-07-07Electrical4620 SW 133 AVESOLAR SYSTEM$14,371
20250561832025-07-07Electrical4620 SW 133 AVESOLAR SYSTEM$14,371
20250488892025-06-03Electrical228 NE 117 ST ASOLAR SYSTEM$14,979
20250487212025-06-02Electrical228 NE 117 ST ASOLAR SYSTEM$14,979
20250475512025-05-28Electrical17405 SW 168 STSOLAR SYSTEM$17,574
20250474252025-05-27Electrical17405 SW 168 STSOLAR SYSTEM$17,574
20250420982025-05-01Electrical13428 SW 108 STREET CIR NSOLAR SYSTEM$11,099
20250408972025-04-28Electrical7950 SW 22 STROOFTOP SOLAR SYSTM$23,406
20250318362025-03-18Electrical3111 SW 117 AVESOLAR PANEL$170,349
20250232822025-02-05Electrical3111 SW 117 AVESOLAR PANEL$170,349
20250176182025-01-07Electrical12141 SW 102 AVEROOFTOP SOLAR PV$164,021
20250168632024-12-31Electrical12141 SW 102 AVEROOFTOP SOLAR PV$164,021

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Miami-Dade County permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →