COMPANY RECORD · BOULDER, CO

Sl Murphy Construction LLC — permit history in Boulder, CO

Sl Murphy Construction LLC appears on 43 Boulder permit records from 2015 through 2026, most often general construction (48.8% of the record).

Permit categories

CategoryPermitsShare
General construction2148.8%
Electrical818.6%
Mechanical / HVAC511.6%
Demolition49.3%
Plumbing49.3%
Fire protection12.3%

6 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
201522
20163
20171
20183
20192
20204
20212
20221
20241
20252
20262

Busiest year on record: 2015, with 22 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
505 MARINE ST2026-07-31
432 PINE ST2026-04-06
2260 MEADOW AVE2025-07-21
2940 18TH ST2025-01-08
235 WILLOW GLEN2022-01-21
445 PINE ST2021-11-12
1722 MARIPOSA AVE2020-02-18
1343 BLUEBELL AVE2020-01-02
3680 ASPEN CT2019-01-08
755 7TH ST2018-04-23
3056 7TH ST2018-04-12
0 AURORA AV2017-06-16
2075 OAK AV2016-02-24
2260 MEADOW AV2016-02-16

20 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $1,600,000, median $45,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

43 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BLD-ACC2026-000322026-07-31General construction505 MARINE STThe existing converted garage studio is to be reverted to a garage. The existing frame wall and patio door at the original opening is to be removed and a overhead garage door is to$5,000
BLD-SFD2026-000422026-04-06General construction432 PINE STALTERATION LEVEL 2: REMODEL OF THE EXISTING UPPER LEVEL HALL BATH AND PRIMARY SUITE (BEDROOM, CLOSET, AND BATHROOM) - 195 SF. WINDOW REPLACEMENT WORK AT UPPER LEVEL PRIMARY BEDROO$300,000
BLD-ACC2025-000342025-07-21General construction2260 MEADOW AVENew single-story pool house wood-framed with crawlspace; 957 SF, conditioned. Previously submitted as an addition under BLD-SFD2024-00542.$900,000
BLD-ACC2024-000652025-01-08General construction2940 18TH ST**3/4/25- Relocate Gas line and part of the retaining wall** New construction of an equipment shed of 80 sf which will house pool equipment and will be without heating and coolin$45,000
BLD-SFD2024-002682024-12-19General construction2940 18TH STNew two-story single family home that includes a partial finished basement. Total of 2 bedrooms and 2 1/2 bathrooms. Basement (247 sf) includes a laundry and storage. First floo$1,500,000
BLD-SFD2021-000262022-01-21General construction235 WILLOW GLENRemove and replace a single family dwelling resulting in a new 4,688 SF two story structure with a tuck under/below grade garage of 536 SF and an unfinished basement area of 324 SF$837,378
BLD-SFD2021-003132021-11-12General construction445 PINE STPARTIAL MAIN FLOOR REMODEL OF 927 SF (FAMILY ROOM, KITCHEN, DINING, POWDER BATH), 2ND FLOOR REMODEL OF 230 SF (MASTER BATH AND BOYS BATH), AND BASEMENT REMODEL OF 398 SF (WORKOUT R$290,000
DEM2021-000022021-06-17Demolition235 WILLOW GLENFull structure demolition of a single family detached dwelling and attached garage constructed in 1968.$0
BLD-ACC2019-000932020-02-18General construction1722 MARIPOSA AVEConstruction of a new, 1-story, detached, accessory study/office building with a crawlspace. ADU under AUR2022-00003. ***4/27/2022 - Resubmittal after permit issuance for changes i$103,000
BLD-ACC2019-000922020-02-18General construction1722 MARIPOSA AVEConstruction of a new, 1-car, detached garage. Garage to be wired for electrical. ***Resubmittal after permit issuance 4/19/2022 for revisions to scope including change in interior$52,000
BLD-SFD2019-002542020-02-18General construction1722 MARIPOSA AVEConstruction of a new, 2-story, single family dwelling with an unfinished basement and a front porch. Dwelling to consist of (1) 1/2 bath, (3) 3/4 baths, (3) bedrooms, (1) kitchen,$1,035,000
BLD-SFD2019-005382020-01-02General construction1343 BLUEBELL AVE*Voided for inactivity - no inspections within 180 days* Removal of existing 80 sf deck and replacement with new 172 sf deck on the rear of a single family dwelling. Deck is eleva$7,500
BLD-SFD2018-003232019-06-10General construction432 PINE STRemodel of rear addition to provide covered porch and changes to fenestration. New interior kitchen layout, cabinets and appliances. **Resubmittal 5/7/2019 - change of scope to rem$142,650
BLD-SFD2018-001552019-01-08General construction3680 ASPEN CTRemodel and renovation of an existing ranch house with basement and attached one car garage. Partial demolition, new upper (2nd) level. Resulting project will include 4 bedrooms. $920,000
BLD-SFD2018-001062018-09-18General construction1343 BLUEBELL AVERemodel 700 sq. ft. of existing house, including: kitchen, living room, broom closet, bedroom 1 and 2, bathroom, remove closet, move utility/office wall, second bathroom, and bedro$52,286
BLD-SFD2018-000062018-04-23General construction755 7TH STInterior remodel of a single family residence (2 levels and basement). In basement, scope includes converting 1/2 bath to full bath, on main level: new kitchen remodel/layout, addi$320,000
DEM2018-000052018-04-12Demolition3056 7TH STFull Demolition of a 2,582 sf single-family detached structure. demolition approved through HIS2018-00007.$0
PMT2017-020242017-06-16General construction0 AURORA AVConstruct a batting cage structure at the east field of the Aurora 7 baseball fields. Field is located on the north side of 3995 Aurora Ave.$5,000
PMT2016-00748-ELE2016-02-24Electrical2075 OAK AVElectrical permit to add 1 outlet$150
PMT2016-00204-DEM2016-02-16Demolition2260 MEADOW AVEntire structure demolition of single-family residence.**2/11/16 - Historic approval per HIS2016-00021 submitted and placed in PMT2015-05436 file**$0
PMT2016-00011-ELE2016-01-04Electrical2260 MEADOW AVTemporary Construction Power in preparation for PMT2015-05436$0
PMT2015-02606-MEC2015-11-09Mechanical / HVAC2650 3RD STNew detached garage, with studio and half bath above, associated with new single family dwelling under PMT2015-02605.$7,000
PMT2015-02606-ELE2015-11-09Electrical2650 3RD STNew detached garage, with studio and half bath above, associated with new single family dwelling under PMT2015-02605.$2,000
PMT2015-026062015-11-09General construction2650 3RD STNew detached garage, with studio and half bath above, associated with new single family dwelling under PMT2015-02605.$59,521
PMT2015-02606-PLB2015-11-09Plumbing2650 3RD STNew detached garage, with studio and half bath above, associated with new single family dwelling under PMT2015-02605.$2,000
PMT2015-02605-MEC2015-11-06Mechanical / HVAC2650 3RD STNew two story single family dwelling with basement. Basement level to include a guest suite, play area, half bath, and storage. Main level to include the master suite, open gather$100,000
PMT2015-02605-FIR2015-11-06Fire protection2650 3RD STNew two story single family dwelling with basement. Basement level to include a guest suite, play area, half bath, and storage. Main level to include the master suite, open gather$0
PMT2015-02605-PLB2015-11-06Plumbing2650 3RD STNew two story single family dwelling with basement. Basement level to include a guest suite, play area, half bath, and storage. Main level to include the master suite, open gather$100,000
PMT2015-02605-ELE2015-11-06Electrical2650 3RD STNew two story single family dwelling with basement. Basement level to include a guest suite, play area, half bath, and storage. Main level to include the master suite, open gather$100,000
PMT2015-026052015-11-06General construction2650 3RD STNew two story single family dwelling with basement. Basement level to include a guest suite, play area, half bath, and storage. Main level to include the master suite, open gather$1,300,000
PMT2015-04291-ELE2015-09-29Electrical320 S 38TH STBasement non-structural remodel to eliminate a second kitchen (see CPL2015-00715). Scope of work includes: Full-size fridge removal, upper cabinets removal, replace kitchen sink $200
PMT2015-04291-PLB2015-09-29Plumbing320 S 38TH STBasement non-structural remodel to eliminate a second kitchen (see CPL2015-00715). Scope of work includes: Full-size fridge removal, upper cabinets removal, replace kitchen sink $200
PMT2015-042912015-09-29General construction320 S 38TH STBasement non-structural remodel to eliminate a second kitchen (see CPL2015-00715). Scope of work includes: Full-size fridge removal, upper cabinets removal, replace kitchen sink $10,022
PMT2015-02503-ELE2015-09-28Electrical950 GILBERT STNew single family detached dwelling with basement and attached garage. Basement to include a guest suite, media room, rec room, mechanical room and storage. Main level to include$60,000
PMT2015-025032015-09-28General construction950 GILBERT STNew single family detached dwelling with basement and attached garage. Basement to include a guest suite, media room, rec room, mechanical room and storage. Main level to include$1,600,000
PMT2015-02503-PLB2015-09-28Plumbing950 GILBERT STNew single family detached dwelling with basement and attached garage. Basement to include a guest suite, media room, rec room, mechanical room and storage. Main level to include$60,000
PMT2015-02503-MEC2015-09-28Mechanical / HVAC950 GILBERT STNew single family detached dwelling with basement and attached garage. Basement to include a guest suite, media room, rec room, mechanical room and storage. Main level to include$80,000
PMT2015-02827-DEM2015-07-10Demolition950 GILBERT STFull structure demolition of house constructed in 1970. $0
PMT2015-02829-ELE2015-07-10Electrical950 GILBERT STTemporary Construction Power. Permit to move meter in prepartion for demolition. $0
PMT2015-026352015-06-29General construction1955 GRAPE AVInstallation of three new egress windows and one new egress door. New wells to be located on south, east and north elevations. See structural engineers letter. No MEP. $5,000
PMT2015-02364-MEC2015-06-15Mechanical / HVAC1955 GRAPE AVReplace water heater and low pressure boiler$3,500
PMT2015-02023-MEC2015-05-27Mechanical / HVAC1498 PERIWINKLE DRReplacement of existing gas fireplace insert and flue with new wood burning fireplace and flue in living room of single family dwelling.$0
PMT2015-01307-ELE2015-04-14Electrical855 13TH STNew underground meter feed from new pedestal at alley to existing meter at house.$1,500

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →