COMPANY RECORD · BOULDER, CO
Sacred Spaces Design Build — permit history in Boulder, CO
Sacred Spaces Design Build appears on 41 Boulder permit records from 2017 through 2026, most often general construction (78% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 32 | 78% |
| Electrical | 4 | 9.8% |
| Mechanical / HVAC | 2 | 4.9% |
| Plumbing | 2 | 4.9% |
| Demolition | 1 | 2.4% |
5 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2017 | 8 |
| 2018 | 3 |
| 2019 | 4 |
| 2020 | 3 |
| 2021 | 3 |
| 2022 | 5 |
| 2023 | 3 |
| 2024 | 4 |
| 2025 | 4 |
| 2026 | 4 |
Busiest year on record: 2017, with 8 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 590 UNION AVE | 2026-06-15 |
| 1645 GILLASPIE DR | 2026-04-24 |
| 760 INCA PKWY | 2026-02-13 |
| 4882 KELLOGG CIR | 2026-01-14 |
| 592 UNION AVE | 2025-12-17 |
| 2214 HOLYOKE DR | 2025-11-12 |
| 1513 48TH ST | 2025-09-16 |
| 3625 ENDICOTT DR | 2025-05-14 |
| 1033 KALMIA AVE | 2024-06-03 |
| 395 32ND ST | 2024-04-26 |
| 3071 REDSTONE LN F3 | 2024-01-29 |
| 701 IRIS AVE | 2024-01-02 |
| 1245 ALPINE AVE | 2023-12-27 |
| 440 S 43RD ST | 2023-05-22 |
31 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $190,000, median $15,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
41 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| ELE2026-00437 | 2026-06-15 | Electrical | 590 UNION AVE | Swap electrical panel only | $2,500 |
| BLD-SFD2026-00073 | 2026-04-24 | General construction | 1645 GILLASPIE DR | Add roof to create a WUI compliant, 225sf covered porch in front of house. | $25,000 |
| BLD-SFA2025-00068 | 2026-02-13 | General construction | 760 INCA PKWY | Minor remodel to lower level of home with the intention to create a 3rd conforming bedroom with closet. The overall space is 225 sf, the proposed bedroom to be 170sf, with the rema | $10,460 |
| BLD-SFD2025-00145 | 2026-01-14 | General construction | 4882 KELLOGG CIR | Single story addition to the south aspect with great room and roof deck above | $130,000 |
| BLD-SFA2025-00053 | 2025-12-17 | General construction | 592 UNION AVE | *4/20/26 Revision to upgrade electrical service and add two circuits for future back deck heaters and water heater flu relocation* Water damage related repairs to two bathrooms and | $47,725 |
| BLD-SFD2025-00199 | 2025-11-12 | General construction | 2214 HOLYOKE DR | A 220 sf single story addition to the west aspect of the great room/kitchen to enhance mountain views, create more space in the kitchen, remove load bearing post, and properly insu | $180,000 |
| BLD-SFA2025-00038 | 2025-09-16 | General construction | 1513 48TH ST | Kitchen remodel involving the relocation of cabinets and appliances. Renovation alteration area is 150sf | $27,500 |
| BLD-SFD2025-00052 | 2025-05-14 | General construction | 3625 ENDICOTT DR | Adding 108 sf mudroom. Renovating 718 sf of main space to include kitchen, dining, and living room areas | $190,000 |
| BLD-SFD2024-00163 | 2024-06-03 | General construction | 1033 KALMIA AVE | Removal of existing south facing 85sf deck and construction of a 260sf deck to accommodate more outdoor seating/dining. | $15,000 |
| BLD-SFD2023-00321 | 2024-04-26 | General construction | 395 32ND ST | Required by short-term rental to remove the oven/stove in master bedroom suite kitchen (77sf) and convert this area to a wet bar to retain my short-term rental license. | $6,394 |
| BLD-SFA2023-00054 | 2024-01-29 | General construction | 3071 REDSTONE LN F3 | /Remodel of 55sf full bathroom. Existing tub/shower combo to become a shower stall. Toilet and vanity move a bit to accommodate new shower location as shown on plans ***7/10/24** | $11,500 |
| BLD-SFD2023-00426 | 2024-01-02 | General construction | 701 IRIS AVE | *Voided for inactivity - requirements not met.* Remodel 131 SF kitchen. Appliances to move per plans, refinish floors. Electrical to code, new hood vent. | $13,000 |
| BLD-NRE2023-00184 | 2023-12-27 | General construction | 1245 ALPINE AVE | Non-structural repair Noodles and Co store front after car accident. Slade glass to replace glazing to code per plans. See plans for details | $10,000 |
| BLD-SFD2023-00311 | 2023-10-13 | General construction | 1645 GILLASPIE DR | Finish 625sf basement. Includes framing one 143sf bedroom, adding 64sf bathroom, and moving laundry to existing mechanical room. The rest of the space will act as a rec room and b | $57,000 |
| BLD-SFD2022-00514 | 2023-05-22 | General construction | 440 S 43RD ST | Kitchen remodel of 110 sf, garage conversion of 170 sf, remove existing wall at garage to create an open floor plan that will require an exposed glulam beam to carry. Adding a cove | $85,000 |
| BLD-ACC2022-00067 | 2022-12-27 | General construction | 3005 15TH ST | DEMO EXISTING 410 SF DETACHED ACCESSORY BUILDING AND REPLACE WITH NEW 1,242 SF DETACHED ACCESSORY BUILDING CONTAINING SINGLE-CAR GARAGE (235 SF), ACCESSORY DWELLING UNIT (444 SF) A | $125,947 |
| BLD-SFD2022-00357 | 2022-12-06 | General construction | 3820 ELMHURST PL | Bathroom scope is 55 sf - upper level bathroom remodel. First floor scope is 625 sf - remodel of main level including kitchen, dining & living room. Combined work area is 680 sf ou | $50,429 |
| ELE2022-01271 | 2022-09-14 | Electrical | 2277 HOLYOKE DR | Replace media room monorail with four (4) 4" direct mount led lights. Add quad plugs at wall behind stereo cabinet. | $1,500 |
| DEM2022-00063 | 2022-07-18 | Demolition | 3005 15TH ST | DEMO EXISTING 410 SF DETACHED ACCESSORY BUILDING (UNCONDITIONED GARAGE) ON SINGLE FAMILY RESIDENTIAL LOT. HIS2022-00134. | $0 |
| BLD-SFD2021-00587 | 2022-04-15 | General construction | 3885 CHIPPEWA DR | Addition of two attached pergola structures. East pergola = 567 sf. West pergola = 260 sf. Removal of an existing window to be replaced with a door. Addition of two new skylights t | $19,951 |
| BLD-SFD2021-00139 | 2021-06-15 | General construction | 380 LIPAN WAY | Remodel of garden level guest bath and laundry rooms, and upper level master bath in tri-level single family home. Garden level drains to vanity, shower, and washer to be relocate | $45,000 |
| BLD-SFD2021-00060 | 2021-03-12 | General construction | 2277 HOLYOKE DR | Master bath remodel of 145 sf, plumbing for tub and tub drain to move slightly, shower valve replaced, addition of a stacked washer/dryer in existing linen closet, new tile through | $29,683 |
| BLD-SFD2020-00113 | 2021-02-11 | General construction | 3545 23RD ST | *Voided for inactivity - no inspections within 180 days* Basement remodel for a single family detached dwelling. Scope includes remodel of previously finished spaces along with t | $70,000 |
| BLD-ACC2020-00058 | 2020-10-20 | General construction | 3700 BASELINE RD | * Installation of 8'x40' shipping container to be used for storage. Will be supported on four caissons. | $15,613 |
| BLD-NRE2020-00053 | 2020-05-22 | General construction | 3450 PENROSE PL | * Remodel of an existing professional office tenant space. Scope includes removing the interior partition walls of an existing file storage room to create a third office space and | $12,500 |
| BLD-SFD2020-00114 | 2020-03-09 | General construction | 385 32ND ST | Remodel of an existing laundry room and powder room to create a 3/4 bath and relocate laundry. | $13,336 |
| BLD-SFD2019-00348 | 2019-10-10 | General construction | 2030 DARTMOUTH AVE | Conversion of an existing wetbar into a kitchen located in the basement per ADU approval (AUR2019-00056). Expanding driveway for access to additional parking space. No mechanical s | $7,063 |
| BLD-SFD2019-00479 | 2019-10-01 | General construction | 65 S 34TH ST | Kitchen and bath remodel of a single family dwelling, approximately 160 sf total work area. Includes associated MEP. See engineer's letter for structural modifications.**10/17/19 - | $34,750 |
| BLD-SFD2019-00179 | 2019-04-29 | General construction | 1225 EASTRIDGE AVE | Interior basement remodel to include (2) bedrooms, (1) laundry, (1) full bath, (1) 3/4 bath and a living area. | $60,620 |
| BLD-MFD2019-00002 | 2019-01-08 | General construction | 3755 BIRCHWOOD DR 45 | Interior remodel for a multifamily unit. Scope includes a minor remodel of the kitchen, additional lighting, and upgrade to smoke detectors. All work to on the second story of the | $15,000 |
| BLD-SFD2018-00160 | 2018-07-03 | General construction | 2030 DARTMOUTH AVE | Kitchen remodel to relocate range, oven, kitchen sink, replace finishes and reconfigure kitchen island. Scope also includes structural modification to remove a portion of a wall be | $25,000 |
| BLD-SFD2018-00028 | 2018-06-25 | General construction | 605 S 43RD ST | Addition and remodel, 60 SF addition and 240 SF remodel. . . . . . . . | $159,700 |
| BLD-MFD2018-00030 | 2018-06-08 | General construction | 208 PEARL ST L | UNIT L-Remodel of multi-family condo unit to unenclose an 18 sf balcony (enclosed without permits. Reference ENF2018-00123) and add non-load bearing partition walls to create a new | $7,000 |
| PMT2017-01771-MEC | 2017-04-28 | Mechanical / HVAC | 4770 SHOUP PL | Remodel of previously flood damaged (2013) basement in a single family detached basement. Sheetrock had been fully removed due to mold considerations. Scope of remodel to include t | $9,000 |
| PMT2017-01771 | 2017-04-28 | General construction | 4770 SHOUP PL | Remodel of previously flood damaged (2013) basement in a single family detached basement. Sheetrock had been fully removed due to mold considerations. Scope of remodel to include t | $33,792 |
| PMT2017-01771-ELE | 2017-04-28 | Electrical | 4770 SHOUP PL | Remodel of previously flood damaged (2013) basement in a single family detached basement. Sheetrock had been fully removed due to mold considerations. Scope of remodel to include t | $4,000 |
| PMT2017-01771-PLB | 2017-04-28 | Plumbing | 4770 SHOUP PL | Remodel of previously flood damaged (2013) basement in a single family detached basement. Sheetrock had been fully removed due to mold considerations. Scope of remodel to include t | $2,000 |
| PMT2017-00087-PLB | 2017-01-11 | Plumbing | 830 RACQUET LN | INTERIOR REMODEL of a single family residence. Scope of work includes work on two levels of the home: on the main level the existing wood-burning fireplace is to be removed and a u | $900 |
| PMT2017-00087 | 2017-01-11 | General construction | 830 RACQUET LN | INTERIOR REMODEL of a single family residence. Scope of work includes work on two levels of the home: on the main level the existing wood-burning fireplace is to be removed and a u | $8,449 |
| PMT2017-00087-ELE | 2017-01-11 | Electrical | 830 RACQUET LN | INTERIOR REMODEL of a single family residence. Scope of work includes work on two levels of the home: on the main level the existing wood-burning fireplace is to be removed and a u | $400 |
| PMT2017-00087-MEC | 2017-01-11 | Mechanical / HVAC | 830 RACQUET LN | INTERIOR REMODEL of a single family residence. Scope of work includes work on two levels of the home: on the main level the existing wood-burning fireplace is to be removed and a u | $400 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
