COMPANY RECORD · BOULDER, CO
Murray & Stafford, Inc — permit history in Boulder, CO
Murray & Stafford, Inc appears on 32 Boulder permit records from 2016 through 2026, most often general construction (65.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 21 | 65.6% |
| Plumbing | 3 | 9.4% |
| Mechanical / HVAC | 3 | 9.4% |
| Electrical | 3 | 9.4% |
| Demolition | 2 | 6.2% |
5 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2016 | 4 |
| 2017 | 8 |
| 2019 | 1 |
| 2021 | 2 |
| 2022 | 1 |
| 2023 | 3 |
| 2024 | 4 |
| 2025 | 8 |
| 2026 | 1 |
Busiest year on record: 2017, with 8 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 6044 LONGBOW CT | 2026-01-16 |
| 4999 PEARL EAST CIR | 2025-09-02 |
| 6027 LONGBOW CT | 2025-05-06 |
| 6042 LONGBOW CT | 2024-11-26 |
| 5920 LONGBOW DR | 2023-05-01 |
5 distinct addresses on record. Declared value on record runs from $0 to $2,058,838, median $253,200. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
32 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLD-NRE2025-00046 | 2026-01-16 | General construction | 6044 LONGBOW CT | Remodel of existing gowning area and laundry. Creation of clean room entry into manufacturing area. No change or use, no change of occupancy | $350,000 |
| BLD-NRE2025-00092 | 2025-10-31 | General construction | 6044 LONGBOW CT | **Revision to correct plans for project: See Note** Remodel of existing gowning area and laundry. Creation of clean room entry into manufacturing area. No change in use, no chang | $264,000 |
| BLD-NRE2025-00096 | 2025-09-02 | General construction | 4999 PEARL EAST CIR | The scope of work includes the following: ? The existing north-facing flood resistant storefront door will be removed and replaced with a new roll-up door to enable forklift ac | $180,000 |
| BLD-NRE2025-00028 | 2025-05-06 | General construction | 6027 LONGBOW CT | Remodel of existing office and gowning areas. Update to restrooms for ADA compliance. No change of use, no change of occupancy | $650,000 |
| BLD-NRE2024-00169 | 2025-04-14 | General construction | 4999 PEARL EAST CIR | Interior remodel of Level 2 to include demolition of existing offices and conference rooms. Scope includes 5,937 SF build back of office space, conference rooms, and break room. Un | $1,344,040 |
| DEM2025-00017 | 2025-04-07 | Demolition | 4999 PEARL EAST CIR | Interior remodel of Level 2 to include demolition of existing offices and conference rooms. Scope includes 5,937 SF build back of office space, conference rooms, and break room. U | $0 |
| DEM2025-00018 | 2025-04-01 | Demolition | 6027 LONGBOW CT | ***VOID 180 Days No Activity*** Remove 20' of wall. Remove 600 square feet of ceiling grid/tile and carpet. Associated with BLD-NRE2025-00028. | $0 |
| BLD-NRE2024-00075 | 2025-03-21 | General construction | 6044 LONGBOW CT | Re-installing a dock door at an infill, installing a concrete pad for cardboard compactor | $69,326 |
| BLD-NRE2024-00123 | 2025-03-12 | General construction | 6027 LONGBOW CT | Install concrete housekeeping pad and metal screen wall | $93,802 |
| BLD-NRE2024-00081 | 2024-11-26 | General construction | 6042 LONGBOW CT | Remodel of existing restrooms for ANSI compliance and addition of shower facilities. ***REVISION 1/23/25***Shift shower pan to accommodate unanticipated column footings and buildin | $500,000 |
| BLD-NRE2024-00067 | 2024-09-23 | General construction | 6042 LONGBOW CT | **VOID-Inspections not completed within 180 days** Modifications to buildings mechanical and electrical systems. No change of use, no change of occupancy | $1,385,189 |
| BLD-NRE2024-00052 | 2024-06-12 | General construction | 6044 LONGBOW CT | *Voided for inactivity - no inspections for 180 days* Installing a split system HVAC for new computer servers | $126,782 |
| BLD-NRE2023-00157 | 2024-01-17 | General construction | 6042 LONGBOW CT | Erecting a fire rated demising wall to separate the building ***2/9/24 changed for shaft wall alongside clean room wall*** | $179,242 |
| BLD-NRE2023-00103 | 2023-09-13 | General construction | 6044 LONGBOW CT | Bldg 3 Phase 2: Reconfiguration of interior warehouse space to be made into offices and adjacent machine shop | $783,452 |
| BLD-NRE2023-00084 | 2023-08-02 | General construction | 6044 LONGBOW CT | Bldg 3 Phase 1: Reconfiguration of offices and production space in previously demised building. Remodel of restrooms to bring them into ADA compliance. Addition of breakroom. No | $975,360 |
| BLD-NRE2023-00027 | 2023-05-01 | General construction | 5920 LONGBOW DR | Remodel the first floor of Building 2, including removal of kitchen/cafeteria and the remodel of restrooms to meet ADA compliance. | $1,381,424 |
| BLD-NRE2022-00073 | 2022-07-26 | General construction | 5920 LONGBOW DR | Construct a 80' x 40' x 4' concrete pit to allow for new testing chamber to be installed | $822,449 |
| BLD-NRE2021-00173 | 2021-12-23 | General construction | 5920 LONGBOW DR | Demo and rebuild west restrooms to meet ADA compliance in Unit 3. | $154,450 |
| BLD-NRE2021-00112 | 2021-08-25 | General construction | 5920 LONGBOW DR | Reconfigure existing clean room for a reduction of 2,199 SF. Expand engineering offices to add 786 SF; Create Laundry room to add 148 SF; Expand Packaging to add 2,351 SF. Clean | $669,124 |
| BLD-NRE2019-00090 | 2019-07-09 | General construction | 5920 LONGBOW DR | Interior repair/remodel for a portion of the 1st floor at Building #5 with water damage on the Medtronic Campus. Included in the scope is the updating of the existing men's restro | $930,889 |
| PMT2017-01158 | 2017-05-01 | General construction | 5920 LONGBOW DR | Interior tenant remodel for the first floor "Area C" of technical office/lab area for Medtronic. Scope includes full MEP's and addition of two sinks. Scope also includes landscape | $779,527 |
| PMT2017-01158-PLB | 2017-05-01 | Plumbing | 5920 LONGBOW DR | Interior tenant remodel for the first floor "Area C" of technical office/lab area for Medtronic. Scope includes full MEP's and addition of two sinks. Scope also includes landscape | $76,523 |
| PMT2017-01158-MEC | 2017-05-01 | Mechanical / HVAC | 5920 LONGBOW DR | Interior tenant remodel for the first floor "Area C" of technical office/lab area for Medtronic. Scope includes full MEP's and addition of two sinks. Scope also includes landscape | $159,307 |
| PMT2017-01158-ELE | 2017-05-01 | Electrical | 5920 LONGBOW DR | Interior tenant remodel for the first floor "Area C" of technical office/lab area for Medtronic. Scope includes full MEP's and addition of two sinks. Scope also includes landscape | $242,400 |
| PMT2017-01160 | 2017-04-27 | General construction | 5920 LONGBOW DR | Interior tenant remodel for the second floor "Area B" of technical office/lab area and storage areas for Medtronic. Scope includes full MEP's and addition of two sinks. | $914,708 |
| PMT2017-01160-MEC | 2017-04-27 | Mechanical / HVAC | 5920 LONGBOW DR | Interior tenant remodel for the second floor "Area B" of technical office/lab area and storage areas for Medtronic. Scope includes full MEP's and addition of two sinks. | $234,887 |
| PMT2017-01160-PLB | 2017-04-27 | Plumbing | 5920 LONGBOW DR | Interior tenant remodel for the second floor "Area B" of technical office/lab area and storage areas for Medtronic. Scope includes full MEP's and addition of two sinks. | $102,223 |
| PMT2017-01160-ELE | 2017-04-27 | Electrical | 5920 LONGBOW DR | Interior tenant remodel for the second floor "Area B" of technical office/lab area and storage areas for Medtronic. Scope includes full MEP's and addition of two sinks. | $242,200 |
| PMT2016-03127-PLB | 2016-08-22 | Plumbing | 5920 LONGBOW DR | Addition of a 1234 sqft. mechanical building to an existing manufacturing facility for new chillers. | $86,102 |
| PMT2016-03127-MEC | 2016-08-22 | Mechanical / HVAC | 5920 LONGBOW DR | Addition of a 1234 sqft. mechanical building to an existing manufacturing facility for new chillers. | $1,358,116 |
| PMT2016-03127-ELE | 2016-08-22 | Electrical | 5920 LONGBOW DR | Addition of a 1234 sqft. mechanical building to an existing manufacturing facility for new chillers. | $154,550 |
| PMT2016-03127 | 2016-08-22 | General construction | 5920 LONGBOW DR | Addition of a 1234 sqft. mechanical building to an existing manufacturing facility for new chillers. | $2,058,838 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →