COMPANY RECORD · BOULDER, CO

Jeff Bishop Electric Inc — permit history in Boulder, CO

Jeff Bishop Electric Inc appears on 69 Boulder permit records from 2015 through 2026, most often electrical (97.1% of the record).

Permit categories

CategoryPermitsShare
Electrical6797.1%
Mechanical / HVAC11.4%
General construction11.4%

3 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20152
20166
20176
20188
201910
20204
20214
20229
20236
20242
20257
20265

Busiest year on record: 2019, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
2805 SUNDOWN LN 2012026-06-17
5755 CENTRAL AVE2026-05-19
638 PLEASANT ST2026-04-16
5393 AZTEC DR2026-03-04
1520 BASELINE RD2026-01-07
1100 10TH ST2025-12-23
1000 MAXWELL AVE2025-11-07
2990 SHADOW CREEK DR 3042025-10-31
260 SPRUCE ST2025-10-17
920 10TH ST2025-04-07
1240 LEHIGH ST2025-01-03
5325 KEWANEE DR2024-06-18
1830 22ND ST 12024-01-19
4630 RICARA DR2023-12-26

65 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $101,539, median $3,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

69 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
ELE2026-006752026-06-17Electrical2805 SUNDOWN LN 201Replace the existing FPE panel.$2,170
ELE2026-004642026-05-19Electrical5755 CENTRAL AVEInstall a 75KVA transformer and sub panel.$16,000
ELE2026-003972026-04-16Electrical638 PLEASANT STtemporary power needed for deconstruction of all buildings on site *Associated with DEM2026-00039*$0
ELE2026-002202026-03-04Electrical5393 AZTEC DRInstall a new 200amp electrical service.$5,100
ELE2026-000112026-01-07Electrical1520 BASELINE RD1. Replace the existing 100amp overhead electrical service with a new 200amp service. Install 200amp lever bypass as per Xcel. 2. Install 200amp main breaker as per NEC2023 code. $7,150
ELE2025-013562025-12-23Electrical1100 10TH STEmergency Electric service change. Tree fell from wind and damaged / disconnected electric panel$4,000
ELE2025-009972025-11-18Electrical5755 CENTRAL AVEinstall 60amp circuit to compressor.$4,000
ELE2025-011832025-11-07Electrical1000 MAXWELL AVEInstall downlights in the stairway wire to existing photocell system.$8,300
ELE2025-011842025-10-31Electrical2990 SHADOW CREEK DR 304replace the existing Sylvania electric panel with a new 125amp 24 space indoor panel and new breakers and combo breakers as per Boulder City code.$3,900
MEC2025-017512025-10-17Mechanical / HVAC260 SPRUCE STinstall/ replace 4 zone 36k btu Lennox Cold Climate Mini Split system into the two 2nd level bedrooms and 3rd level loft and 1 in the main floor living room **All new plastic glue$23,168
ELE2025-002542025-04-07Electrical920 10TH STInstall new 100amp electrical service, replace old meter as per Xcel Energy. Replace the overhead mast, upgrade grounding as per code.$4,150
ELE2024-009312025-01-03Electrical1240 LEHIGH ST**VOID-Inspections not completed within 180 days**install 240 volt 30amp circuit for new hot water heater$850
ELE2024-004982024-06-18Electrical5325 KEWANEE DR***Voided for inactivity - no inspection within 180 days*** Electric service upgrade 100amp to 200amp$1,500
ELE2024-000522024-01-19Electrical1830 22ND ST 1*Voided for inactivity - no inspections for 180 days.* Add two 120volt 20amp circuits to bathroom.$1,500
ELE2023-012412023-12-26Electrical4630 RICARA DR*Voided for inactivity - no inspections within 180 days* 1. Install 2 ?? PVC pipe from pole to the new meter location, for the new Xcel underground wire. 2. Install 240volt 50a$6,800
ELE2023-009422023-09-12Electrical3375 CHISHOLM TRL A103Replace the existing receptacles and light switches. Pigtail aluminum wire to copper with purple wire nuts. Replace FPE panel and breakers.$4,100
ELE2023-005312023-05-24Electrical2340 PANORAMA AVEVOID-180 Days no activity 1. Re move all plugs and switches for Boulder City inspector. 2. Install new arc/GFCI combo circuit breakers. 3. Install floor heat thermostats. 4. Instal$7,000
ELE2023-004132023-04-21Electrical1500 PATTON DR*Voided for inactivity - no inspections within 180 days* install 240volt 20amp circuit for split system.$1,400
ELE2023-001812023-03-03Electrical2436 MAPLETON AVERun a 100amp 120/240volt circuit to garage for EV charger$3,200
ELE2023-001402023-02-22Electrical3700 BASELINE RDInstall two 240volt 30amp circuits to a/c disconnects.$2,000
ELE2022-013292022-09-27Electrical3748 DAVIDSON PLinstall a new 200amp meter and circuit breakers as per boulder city code$5,680
ELE2022-011492022-08-12Electrical755 34TH ST1. Install a new 200amp overhead electric meter and panel, 2 new ground rods, new water pipe ground and breaker as per Boulder City code. 2. Wire the 2-ton A/C 240volts 20amp $6,400
ELE2022-010582022-07-26Electrical2035 BROADWAYAdd electric circuits for new bar equipment$5,000
ELE2022-009002022-06-14Electrical3720 IRIS AVE A*Voided for inactivity - requirements not met.* Install a 240volt 50amp circuit to the hot tub. Install a new hot tub GFCI disconnect.$1,400
BLD-SFD2022-002342022-06-06General construction1090 LINCOLN PLRepair to drywall/plaster, flooring, trim, doors and paint from water loss. Replacement of fixtures in the bathrooms.$101,539
ELE2022-006192022-04-27Electrical1110 10TH STReplace the existing 100amp overhead service with a 200amp overhead electrical service. Relocate the existing panel outside.$8,900
ELE2022-005632022-04-13Electrical3650 PAONIA ST#1.Install 120 volt weather proof GFCI outlet for outside fire place. #2. Install switched 120 volt weather proof GFCI outlet for low volt land scape transformer Wire to existing $1,500
ELE2022-001912022-02-15Electrical1301 CANYON BLVD 304VOID- 180 days no activity Install 19 new 4" LED recessed can lights. Remove existing fan/light and ceiling light in the office. Install 5 new dimmer light switches.$6,000
ELE2022-000042022-01-04Electrical1511 GROVE STReplace electrical meter and mast that was damaged by a fallen tree.$2,000
ELE2021-015112021-09-22Electrical3301 ARAPAHOE AVE 419*Voided for inactivity - no inspections within 180 days* Install new light over dining room table.$300
ELE2021-013962021-08-27Electrical1090 TOEDTLI DR1. Replace the existing 100amp overhead electrical service with a new 200amp overhead electrical service. 2. Replace the existing meter can with a new 200amp lever bypass meter can$7,500
ELE2020-005282021-05-11Electrical1705 19TH ST***VOIDED DUE TO INACTIVITY OVER 180 DAYS*** *Emergency repair due to storm damage. Replace damaged meter can and riser.$1,100
ELE2021-007122021-05-11Electrical628 MAXWELL AVEService change 200 amps.$4,000
ELE2020-014492020-10-14Electrical3080 ASH AVE*Replace the existing overhead electrical service with a new exterior lever bypass meter and 125amp main breaker panel in the existing exterior location. Replace the existing panel$3,660
ELE2020-004112020-04-09Electrical2632 PINE ST*Replace the existing overhead electrical service and meter with a new 200amp exterior service with two meters and two 100amp disconnects. Install new electrical panels in each un$11,600
ELE2020-003812020-03-17Electrical1345 GRANDVIEW AVE*Install a new 240volt 50amp GFCI protected circuit to the stacked washer and dryer in the second floor bathroom.$1,070
ELE2020-002812020-02-27Electrical5290 ARAPAHOE AVE*Replace an existing duplex receptacle in a single gang box with a new double duplex receptacle in a 2-gang box.$300
ELE2019-015152019-10-04Electrical1245 DREXEL ST*Replace the 100amp overhead electrical service with a new 200amp meter and 200amp electrical panel. Upgrade grounding.$5,580
ELE2019-010522019-08-12Electrical1107 10TH STWater damage from frozen pipes (tenants left heat off over Christmas) repair for a two-story 4 bedroom house built in 1905. Water started in second floor damage, water went all th$5,000
ELE2019-010092019-07-31Electrical2086 HARDSCRABBLE DR*Replace the existing FPE panel with a new 200amp lever bypass meter can and 200amp panel. Upgrade grounding.$5,120
ELE2019-009352019-07-29Electrical1116 13TH STAdding new exterior lighting fixture in conformance with the University Hill Commercial Alley Enhancement Plan$300
ELE2019-004852019-05-02Electrical3105 E EUCLID AVE*1. Install 200amp panel and lever bypass meter can. 2. Install circuit for car charger. 3. Install circuit for heat pump. 4. Install circuit for sump pump. 5. Install circuit $8,650
ELE2019-001272019-02-19Electrical4885 EISENHOWER DRReplace electrical meter can.$1,000
ELE2019-001692019-02-19Electrical1642 4TH STInstall a new 200amp overhead electrical service with two new panels and two new lever bypass meter cans.$9,600
ELE2018-013032019-02-06Electrical5290 ARAPAHOE AVE* Reconnecting new illuminated Wall Sign onto front elevation of building to existing electrical. Sign permitted under SGN2018-00134.$200
ELE2019-000812019-01-23Electrical2420 9TH ST 11UNIT 4-Reconfiguration of existing outlets, installation of one new outlet, and replacement of Federal Pacific sub panel. Cabinets, floor, and counter tops will also be replaced (n$4,825
ELE2019-000102019-01-04Electrical2485 JUNIPER AVEDamaged meter-can replacement.$1,420
ELE2018-011012018-11-09Electrical470 ERIE DR* Kitchen Remodel, including: replacement of counter tops and cabinets, and electrical upgrades. (online submittal)$3,000
ELE2018-004762018-07-02Electrical470 ERIE DRElectrical permit to rewire an existing bath and laundry closet.$1,000
ELE2018-003592018-06-12Electrical804 CHAUTAUQUA PARKLandmark Alteration Certificate issued for installation of a new (replacement) 150 amp electrical service with weatherhead mast and a new lever bypass meter panel all-in-one in the$0

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →