COMPANY RECORD · BOULDER, CO
Groundworks Colorado DBA Complete Basement Systems — permit history in Boulder, CO
Groundworks Colorado DBA Complete Basement Systems appears on 140 Boulder permit records from 2015 through 2026, most often general construction (91.4% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 128 | 91.4% |
| Electrical | 12 | 8.6% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 2 |
| 2016 | 14 |
| 2017 | 13 |
| 2018 | 7 |
| 2019 | 11 |
| 2020 | 9 |
| 2021 | 17 |
| 2022 | 20 |
| 2023 | 13 |
| 2024 | 17 |
| 2025 | 7 |
| 2026 | 10 |
Busiest year on record: 2022, with 20 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1936 BLUFF ST | 2026-08-03 |
| 2550 VASSAR DR | 2026-07-06 |
| 810 37TH ST | 2026-06-12 |
| 2825 ELM AVE | 2026-05-22 |
| 620 IRIS AVE | 2026-05-15 |
| 370 S 45TH ST | 2026-05-14 |
| 3605 CONIFER CT | 2026-05-11 |
| 5300 CYPRESS DR | 2026-04-16 |
| 1224 MARIPOSA AVE | 2026-03-12 |
| 1225 EAST RIDGE AVE | 2026-02-04 |
| 4691 INGRAM CT | 2025-12-15 |
| 1270 AIKINS WAY | 2025-11-25 |
| 2120 GODDARD PL | 2025-08-28 |
| 4202 MONROE DR C | 2025-08-28 |
129 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $540 to $104,193, median $10,928. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
140 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLD-SFD2026-00428 | 2026-08-03 | General construction | 1936 BLUFF ST | Install (9) helical piers around the SW foundation to help mitigate further vertical movement of this area. | $33,299 |
| BLD-SFD2026-00345 | 2026-07-06 | General construction | 2550 VASSAR DR | Install (4) helical piers under the SE foundation, as shown on the attached plans, to help mitigate future vertical movement of that area. Work Area: hole for pier (3'x 3' = 9' x | $9,500 |
| BLD-SFD2026-00272 | 2026-06-12 | General construction | 810 37TH ST | Foundation repair for single family detached dwelling - Scope includes install (4) new Intellijack monoposts and cast-in-place concrete footers under the crawlspace main beam, as s | $12,204 |
| BLD-SFD2026-00279 | 2026-05-22 | General construction | 2825 ELM AVE | Install (6) helical piers under the NE corner of the crawlspace foundation to help mitigate future vertical movement of that area for single family detached dwelling Work Area: h | $18,706 |
| BLD-SFD2026-00266 | 2026-05-15 | General construction | 620 IRIS AVE | Install (4) helical piers under the NW crawlspace foundation to help mitigate future vertical movement of that area. Work Area: Pier holes (2'x 2' = 4' x Qty.4) = 16' square fe | $17,330 |
| BLD-SFD2026-00254 | 2026-05-14 | General construction | 370 S 45TH ST | Install (10) push piers around the north (left) side of the crawlspace foundation to help mitigate future vertical movement of that area. Work Area: Pier holes (2'x 2' = 4' x Qt | $24,007 |
| BLD-SFD2026-00227 | 2026-05-11 | General construction | 3605 CONIFER CT | Install (4) push piers under the NW corner of the garage foundation to help mitigate future vertical movement of that area. Work Area: Pier holes (2'x 2' = 4' x Qty.4) = 16' sq | $10,136 |
| BLD-SFD2026-00178 | 2026-04-16 | General construction | 5300 CYPRESS DR | Install (6) helical piers under the the east corner of the crawlspace foundation to help mitigate future vertical movement of that area. Work Area: helical pier holes (2'x 2' = | $15,932 |
| BLD-SFD2026-00120 | 2026-03-12 | General construction | 1224 MARIPOSA AVE | Install (3) helical piers under the south center (rear) foundation (as shown on the attached plans) to help mitigate future vertical movement of these areas. Work Area: helical p | $9,302 |
| BLD-SFD2026-00052 | 2026-02-04 | General construction | 1225 EAST RIDGE AVE | Install (7) push piers around the garage foundation and (4) push piers around the SE basement foundation to help mitigate future vertical movement of these areas. Work Area: push | $27,990 |
| BLD-SFD2025-00542 | 2025-12-15 | General construction | 4691 INGRAM CT | ***VOID-180 Days no activity*** Install (11) helical piers under the north side of basement foundation to help mitigate future vertical movement of that area. Work Area: helical | $31,092 |
| BLD-SFD2025-00516 | 2025-11-25 | General construction | 1270 AIKINS WAY | Install (7) wall anchors on the rear (south) basement foundation wall to help mitigate future lateral movement of that area. Work Area: wall anchors (16' per anchor x Qty.7) = | $11,046 |
| BLD-SFD2025-00336 | 2025-08-28 | General construction | 2120 GODDARD PL | Install (6) carbon fiber straps vertically on the NW basement foundation wall to help mitigate future lateral movement of that area. Work Area: Carbon Fiber straps (0.4' x 8' = | $5,488 |
| BLD-SFD2025-00330 | 2025-08-28 | General construction | 4202 MONROE DR C | Install two (2) IntelliJack monopost with CIP Concrete footings under the existing main load beam in crawl space, as shown on the attached sketch, to stabilize/level the floor fram | $3,092 |
| BLD-SFD2025-00289 | 2025-08-04 | General construction | 1577 NORTH ST | Install (4) helical piers under the NW inside foundation wall to help mitigate future vertical movement of that area.. Work Area: pier holes (2' x 2' = 4' x Qty.7 holes) = 16' | $11,965 |
| BLD-SFD2025-00286 | 2025-07-28 | General construction | 5354 MUIRFIELD CT | Install (7) wall anchors on the east foundation wall to help mitigate future lateral movement of that area. Work Area: wall anchor holes (2' x 3' = 6' x Qty.7 holes) = 42' squa | $8,153 |
| BLD-SFD2025-00191 | 2025-05-29 | General construction | 3195 E EUCLID AVE | Install (9) push piers around the east crawlspace foundation to help mitigate future vertical movement of that area. Work Area: push pier holes (2' x 2' = 9' x Qty.4 holes) = | $19,811 |
| BLD-SFD2024-00525 | 2024-12-18 | General construction | 780 33RD ST | Install (4) push piers under the NE corner of the crawlspace foundation to help mitigate future vertical movement of these areas. Work Area: push pier holes (2'x 2' = 4' x Qty.4 | $8,583 |
| BLD-SFD2024-00496 | 2024-12-10 | General construction | 345 30TH ST | Install (6) helical piers under the west crawlspace foundation and (6) helical piers under the north crawlspace foundation to help mitigate future vertical movement of these areas. | $29,949 |
| BLD-SFD2024-00464 | 2024-11-27 | General construction | 1321 5TH ST | Install (5) helical piers to stabilize the garage foundation. Replace shims with intellijack monopost supported by (1) helical pier and new concrete pier cap. Work Area: push pier | $19,699 |
| BLD-SFD2024-00420 | 2024-10-29 | General construction | 460 S 45TH ST | Install (2) push piers under the SE garage foundation and (6) push piers under the NW crawlspace / basement foundation to help mitigate future vertical movement in these areas. Wo | $18,355 |
| BLD-SFD2024-00424 | 2024-10-29 | General construction | 925 34TH ST | Install (4) push piers under the SW foundation to help mitigate future vertical movement in these areas. Install carbon fiber strips on the SW corner of the foundation wall to stab | $13,372 |
| BLD-SFD2024-00390 | 2024-10-10 | General construction | 2520 PANORAMA AVE | ***VOID-180 Days no activity*** Install (22) new helical piers under the foundation walls as shown in the attached plans set to help mitigate future vertical movement in these area | $60,912 |
| BLD-SFD2024-00374 | 2024-09-26 | General construction | 783 13TH ST | ***10/28/24 *** Withdrawn found that the bedrock is too shallow to install piers Install six (6) helical piers on the south crawlspace foundation to help mitigate vertical movemen | $15,465 |
| BLD-SFD2024-00352 | 2024-09-10 | General construction | 3845 CLOVERLEAF DR | Install six (6) push piers on the SE basment foundation to help mitigate vertical movement. Work Area: push pier holes (3'x 3' = 9' x Qty.6 holes) = 54' square feet. | $13,997 |
| BLD-SFD2024-00347 | 2024-09-10 | General construction | 3538 22ND ST | Install two (2) IntelliJack monoposts on existing beam in crawlspace to provide additional support to existing framing system | $2,203 |
| BLD-SFD2024-00308 | 2024-08-13 | General construction | 4530 OSAGE DR | Install (11) push piers under the south basement foundation to help mitigate vertical movement. | $30,498 |
| BLD-SFA2024-00018 | 2024-07-23 | General construction | 1932 PEARL ST B | Install four (4) helical piers under the NE foundation to help mitigate vertical movement. Work Area: (Condo) Slab on grade shallow foundation footer (2'x 2' = 4' x Qty.4 holes) = | $10,310 |
| BLD-SFD2024-00214 | 2024-06-11 | General construction | 2378 DENNISON LN | Install ten (10) push piers around the east crawlspace foundation to help mitigate vertical movement. Install supplemental S4 beam with 3 intellijack monopost supports mid span in | $28,422 |
| BLD-SFD2024-00210 | 2024-06-04 | General construction | 3395 E AURORA AVE | Install seven (7) helical piers on the SW corner of the crawlspace foundation to help mitigate vertical movement. Work Area: Pier install in the crawlspace with shallow footer (2' | $15,408 |
| BLD-SFD2024-00166 | 2024-05-22 | General construction | 1616 NORTH ST | Install five (5) push piers on the south crawlspace foundation to help mitigate vertical movement. Work Area: push pier install in the crawlspace, shallow footer (2'x 2' = 4' x Qt | $11,362 |
| BLD-SFD2024-00070 | 2024-03-18 | General construction | 1420 RIVERSIDE AVE | Install three (3) Grip-Tite RDS-2875 helical piers to provide stability to the foundation of the rear addition structure. Work Area: helical pier install (3'x 3' = 9' x Qty.3 hole | $10,810 |
| BLD-SFD2024-00036 | 2024-02-20 | General construction | 2550 VASSAR DR | Install (2) new helical piers to support the existing deck caissons to help mitigate the future vertical movement of the deck posts in these areas. Install (8) new push piers along | $26,724 |
| BLD-NRE2023-00207 | 2024-01-19 | General construction | 6650 GUNPARK DR | Install (24) new helical piers with pier caps and adjustable steel mono posts along the beam lines in the crawlspace to help mitigate vertical movement in these areas. Install (3) | $104,193 |
| BLD-SFD2023-00459 | 2023-12-27 | General construction | 7341 POSTON WAY | Remove the existing (2) monoposts and install (2) new steel adjustable monoposts and (2) new helical piers1 foot away from the existing monopost locations under the main beam line | $17,780 |
| BLD-SFD2023-00444 | 2023-12-18 | General construction | 2705 TABLE MESA CT | Install (10) new helical piers under the following foundation walls to help mitigate future vertical movement | $21,394 |
| BLD-SFD2023-00413 | 2023-11-21 | General construction | 1350 RIVERSIDE AVE | ***VOIDED DUE TO INACTIVITY OVER 180 DAYS*** Installation of four (4) Grip-Tite Helical Piers along the southwest corner foundation walls to stabilize foundation movement. | $9,635 |
| BLD-SFD2023-00395 | 2023-11-20 | General construction | 1224 MARIPOSA AVE | Install seven (7) Grip-Tite Helical Piers along the northern and eastern foundation walls of the residence to stabilize foundation movement. Work Area: depth for piers 5' (hole 4' | $16,880 |
| BLD-SFA2023-00050 | 2023-11-08 | General construction | 1611 SPRUCE ST | Install (16) helical piers under the following foundation walls to help mitigate future vertical movement in these areas: o (6) piers under the north wall o (5) piers under the eas | $66,800 |
| BLD-SFD2023-00394 | 2023-11-07 | General construction | 925 34TH ST | Install (5) new push piers under the foundation walls of the southwest corner of the house to help mitigate vertical movement in this area. Install (6) new wall anchors on the east | $18,697 |
| BLD-SFD2023-00316 | 2023-09-11 | General construction | 4720 CHEYENNE CT | Install (4) push piers along the north foundation wall to help mitigate future vertical movement in this area. Work Area: push piers (2'x 2' area) x (Qty. 4) = 16' square feet tot | $15,013 |
| BLD-SFD2023-00199 | 2023-07-14 | General construction | 757 8TH ST | Install (12) new push piers along the northern half of the foundation walls to help mitigate vertical movement in this area. Work Area: push piers, footer at frost depth (3'x 3' h | $27,482 |
| BLD-SFD2023-00194 | 2023-07-12 | General construction | 1001 BASELINE RD | Install (18) new helical piers along the northern half of the foundation walls to help mitigate vertical movement in this area. Work Area: helical piers frost depth (3'x 3' hole) | $41,603 |
| BLD-SFA2023-00016 | 2023-06-09 | General construction | 1460 QUINCE AVE S103 | Install (1) helical pier under the right upper deck post foundation (the only deck post) to help mitigate future vertical movement for this area. Work Area: helical pier (2'x 2' ho | $3,410 |
| BLD-SFD2023-00084 | 2023-04-03 | General construction | 1140 HANCOCK DR | Install (6) push piers under the crawlspace foundation walls to help mitigate future vertical movement in these areas. Install (6) wall braces along the north basement foundation w | $21,960 |
| BLD-SFD2023-00070 | 2023-03-15 | General construction | 3600 BROADWAY | Stabilize the east basement foundation walls by installing (5) wall braces to help mitigate lateral movement of that area. Work Area: no excavation for wall braces (8' long x 6") | $9,784 |
| BLD-SFD2023-00012 | 2023-01-13 | General construction | 4645 TALBOT DR | Stabilize the east side foundation by installing (9) push piers to help mitigate vertical movement of that area. Work Area: excavation for push piers (3' x 3') x (Qty. 9) = 81' sq | $26,888 |
| BLD-SFD2022-00541 | 2022-12-12 | General construction | 4380 DREW CIR | Install (3) new steel mono posts with new concrete pad footings under the mudroom subfloor at the front of the house to support the floor and help mitigate future vertical movement | $8,638 |
| BLD-SFD2022-00557 | 2022-12-12 | General construction | 780 HARTFORD DR | Install (9) push piers along the foundation walls to help mitigate future vertical movement: Work area: excavation for push piers (3'x3')x(Qty. 9) =81' square feet | $21,050 |
| BLD-SFD2022-00521 | 2022-12-01 | General construction | 1224 MARIPOSA AVE | Stabilize the SE foundation by installing (6) helical piers to help mitigate vertical movement of that area. Work Area: excavation for helical piers at 3' deep is (3' x 3') x (Qty | $20,301 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →