COMPANY RECORD · BOULDER, CO
Ev Plug Pros LLC — permit history in Boulder, CO
Ev Plug Pros LLC appears on 66 Boulder permit records from 2023 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 66 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2023 | 12 |
| 2024 | 23 |
| 2025 | 16 |
| 2026 | 15 |
Busiest year on record: 2024, with 23 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every Boulder permit, not only this company's
This page is a snapshot of Ev Plug Pros LLC. The search behind it holds more than 55,922 Boulder permits naming a contractor, since 2015: 20,913 mechanical (HVAC) permits, 14,174 electrical permits, 11,398 building permits, 5,391 fire protection permits, 2,856 plumbing permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit Ev Plug Pros LLC files, or any new electrical permit in Boulder. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Where they worked
| Address in source | Most recent permit |
|---|---|
| 3223 IRON FORGE PL 102 | 2026-10-27 |
| 3517 BROADWAY F | 2026-10-13 |
| 473 JUNIPER AVE | 2026-10-13 |
| 615 HIGHLAND AVE | 2026-09-18 |
| 1505 PEARL ST | 2026-08-20 |
| 5576 PENNSYLVANIA AVE | 2026-07-17 |
| 4040 BIMINI CT | 2026-06-22 |
| 1015 MIAMI WAY | 2026-06-16 |
| 981 UTICA AVE | 2026-06-08 |
| 1889 YARMOUTH AVE | 2026-04-27 |
| 990 WAITE DR | 2026-04-13 |
| 3460 22ND ST | 2026-02-12 |
| 3430 EVERETT DR | 2026-01-27 |
| 6036 LONGBOW CT | 2026-01-13 |
65 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $500 to $50,000, median $900. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Namaste Solar Electric Inc | 6 | 2017–2026 |
| Meyers Heating And A/C | 4 | 2019–2026 |
| Save Home Heat Co Inc | 4 | 2021–2026 |
| Tesla Energy Operations Inc | 4 | 2017–2025 |
| Energy Transition Partners Inc DBA | 4 | 2015–2025 |
| Precision Plumbing & Heating | 4 | 2017–2026 |
| Smart Wave Solar | 2 | 2024–2025 |
| Blue Valley Energy Inc | 2 | 2023–2025 |
Companies that also appear in Boulder permit records at addresses where Ev Plug Pros LLC filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
66 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| ELE2026-01072 | 2026-10-27 | Electrical | 3223 IRON FORGE PL 102 | Install 240V 40A hardwired Tesla EV charger in parking garage in customer's parking spot. | $1,900 |
| ELE2026-01051 | 2026-10-13 | Electrical | 3517 BROADWAY F | Install (QTY-1) 240V 50A hardwired Tesla EV charger with energy management system (EMS). The EMS utilizes the monitor and proprietary software, allowing the EV Charger's electrical | $2,500 |
| ELE2026-01039 | 2026-10-13 | Electrical | 473 JUNIPER AVE | install (QTY-1) 240V 50A hardwired Emporia EV charger with Emporia's energy management system (EMS). The EMS utilizes the Emporia Vue energy monitor and proprietary software, allow | $950 |
| ELE2026-00864 | 2026-09-18 | Electrical | 615 HIGHLAND AVE | Install 240V 30A hardwired Tesla EV charger on outside garage. Landmark Alteration Certificate - HIS2026-00245. | $700 |
| ELE2026-00853 | 2026-08-20 | Electrical | 1505 PEARL ST | EV PLUG PROS, LLC WILL PROVIDE INSTALLATION AND COMMISSIONING OF (QTY-12) TESLA UNIVERSAL WALL CONNECTOR LEVEL 2 ? EV CHARGERS(S) AND (QTY-12) DCC-10 LOCATED AT 1505 PEARL ST APT ( | $50,000 |
| ELE2026-00694 | 2026-07-17 | Electrical | 5576 PENNSYLVANIA AVE | Install 240V 40A hardwired Emporia EV charger in the detached garage. | $2,000 |
| ELE2026-00524 | 2026-06-22 | Electrical | 4040 BIMINI CT | Install 240V 50A hardwired Ford EV charger in the garage. | $1,000 |
| ELE2026-00597 | 2026-06-16 | Electrical | 1015 MIAMI WAY | Install (QTY-1) 240V 50A hardwired Tesla EV charger with energy management system (EMS) inside attached garage of single family dwelling. The EMS utilizes the energy monitor and pr | $900 |
| ELE2026-00499 | 2026-06-08 | Electrical | 981 UTICA AVE | Install 240V 30A hardwired Emporia EV charger outside in lockbox. | $900 |
| ELE2026-00326 | 2026-04-27 | Electrical | 1889 YARMOUTH AVE | Install a 240V 50A 14-50 NEMA outlet in the garage for EV Charger. | $800 |
| ELE2026-00328 | 2026-04-13 | Electrical | 990 WAITE DR | install (QTY-1) 240V 50A hardwired Emporia EV charger with Emporia's energy management system (EMS). The EMS utilizes the Emporia Vue energy monitor and proprietary software, allow | $800 |
| ELE2026-00065 | 2026-02-12 | Electrical | 3460 22ND ST | Install 240V 30A hardwired ChargePoint home flex EV charger outside garage. | $900 |
| ELE2026-00029 | 2026-01-27 | Electrical | 3430 EVERETT DR | 240V 50A hardwired Tesla EV Charger in the garage. | $900 |
| ELE2025-01367 | 2026-01-13 | Electrical | 6036 LONGBOW CT | INSTALLATION OF 6 TESLA UNIVERSAL CHARGERS IN THE P2 PARKING GARAGE and INSTALLATION OF 4 TESLA UNIVERSAL CHARGERS IN THE P1 PARKING GARAGE AT 6036 LONGBOW CT. BOULDER, CO. | $15,000 |
| ELE2025-01370 | 2026-01-13 | Electrical | 6050 LONGBOW CT | INSTALLATION OF 4 TESLA UNIVERSAL CHARGERS IN THE P1 PARKING GARAGE (building 5). INSTALLATION OF 6 TESLA UNIVERSAL CHARGERS IN THE P2 PARKING GARAGE (building 7). | $10,000 |
| ELE2025-01333 | 2025-12-19 | Electrical | 130 S 42ND ST | Install 240V 50A hardwired ChargePoint Home Flex EV charger. | $800 |
| ELE2025-01316 | 2025-12-19 | Electrical | 3018 7TH ST | Install a sub panel and install 240V 50A hardwired ChargePoint Home Flex EV charger in garage. | $1,550 |
| ELE2025-01004 | 2025-10-23 | Electrical | 3165 WESTWOOD CT | 240V 50A hardwired Emporia EV Charger in the garage. | $900 |
| ELE2025-00939 | 2025-10-06 | Electrical | 995 UTICA AVE | Install 240V 50A hardwired ChargePoint Home Flex EV charger in the garage. | $500 |
| ELE2025-00925 | 2025-10-03 | Electrical | 360 HOPI PL | Install a new sub panel and install (QTY-1) 240V 50A hardwired Emporia EV charger with Emporia's energy management system (EMS). The EMS utilizes the Emporia Vue energy monitor and | $1,000 |
| ELE2025-00741 | 2025-09-10 | Electrical | 5165 SANTA CLARA PL C | Install a new sub panel next to outside meter bank and install (QTY-1) 240V 50A hardwired Emporia EV charger with Emporia's energy management system (EMS). The EMS utilizes the Emp | $1,000 |
| ELE2025-00687 | 2025-08-15 | Electrical | 3078 NOBLE CT | 240V 50A hardwired ChargePoint Home Flex EV Charger in the garage. | $950 |
| ELE2025-00415 | 2025-06-06 | Electrical | 3240 WRIGHT AVE | Install 240V 40A hardwired Tesla EV charger in the garage. | $500 |
| ELE2025-00388 | 2025-05-22 | Electrical | 4178 LONGVIEW LN | Install 240V 50A hardwired ChargePoint Home Flex EV charger in the garage. | $500 |
| ELE2025-00321 | 2025-05-05 | Electrical | 1600 QUINCE AVE | Install 240V 50A hardwired Tesla EV charger outside. | $1,400 |
| ELE2025-00236 | 2025-04-22 | Electrical | 5765 ARAPAHOE AVE | ***Voided for inactivity - no inspection within 180 days*** Addition of 50A Circuit for NEMA 6-50 to be routed through, and controlled by an RVE-DCC 12 Load Management Device (EMS | $2,000 |
| ELE2025-00214 | 2025-04-09 | Electrical | 195 S 32ND ST | Install 240V 50A hardwired Tesla wall connector EV charger in the garage. | $1,200 |
| ELE2025-00030 | 2025-02-12 | Electrical | 3231 4TH ST | ***3/31/25 Removed sub panel and 2nd hardwired EV charger, going back to original approved permit application***3/24/25 Install a 240V 40Ahardwired Tesla EV Charger.*** Install a 2 | $1,000 |
| ELE2025-00046 | 2025-02-06 | Electrical | 2685 HEIDELBERG DR | **VOID-Inspections not completed within 180 days** Install 240V 50A hardwired Tesla wall connector EV charger in the garage. | $1,200 |
| ELE2025-00032 | 2025-01-29 | Electrical | 155 S 33RD ST | Install 240V 50A hardwired ChargePoint Home Flex EV charger outside. | $1,000 |
| ELE2024-01050 | 2025-01-23 | Electrical | 4570 SQUIRES CIR | Install (QTY-1) 240V 50A hardwired Emporia EV charger with Emporia's energy management system (EMS). The EMS, utilizes the Emporia Vue energy monitor and proprietary software, allo | $900 |
| ELE2024-00843 | 2024-11-12 | Electrical | 2046 WALNUT ST | *REVISION TO INSTALLATION EQUIPMENT 11/15/24* Install a 240V 50A hardwired EV charger in the garage. | $600 |
| ELE2024-00897 | 2024-10-29 | Electrical | 120 S 33RD ST | Install 240V 50A hardwired Universal Tesla wall connector outside. | $800 |
| ELE2024-00852 | 2024-10-29 | Electrical | 1552 OAK AVE | Install new sub panel and 240V 20A hardwired ChargePoint Home Flex EV charger outside. | $1,000 |
| ELE2024-00841 | 2024-10-29 | Electrical | 2440 PREMIER PL | Install (QTY-1) new 100A buss rated - sub panel, fed with a 240V 50A 2-pole breaker at main service panel. Sub panel will contain (QTY-2) 50A 2-pole breakers that will supply each | $1,800 |
| ELE2024-00869 | 2024-10-29 | Electrical | 4735 LUDLOW ST | Install a 240V 50A hardwired Deltran EV charger in the garage. | $900 |
| ELE2024-00746 | 2024-10-01 | Electrical | 250 S 38TH ST | Install a 240V 50A hardwired ChargePoint Home Flex EV charger in the garage. | $800 |
| ELE2024-00702 | 2024-09-20 | Electrical | 3260 ENDICOTT DR | VOID- 180 Days no activity Install (QTY-1) 240V 50A hardwired Emporia EV charger with Emporia's energy management system (EMS). The EMS, utilizes the Emporia Vue energy monitor and | $750 |
| ELE2024-00713 | 2024-09-20 | Electrical | 4170 HUNT CT | Install (QTY-1) 240V 50A hardwired Emporia EV charger with Emporia's energy management system (EMS). The EMS, utilizes the Emporia Vue energy monitor and proprietary software, allo | $600 |
| ELE2024-00761 | 2024-09-09 | Electrical | 4841 HOPKINS PL | Install a 240V 50A hardwired Universal Tesla Wall connector in the garage. | $800 |
| ELE2024-00650 | 2024-08-28 | Electrical | 45 BUCKNELL CT | Install a 240V 50A hardwired Tesla wall connector EV charger in the garage. | $700 |
| ELE2024-00613 | 2024-08-20 | Electrical | 1308 GRANDVIEW AVE | Install a 240V 50A hardwired ChargePoint Home Flex EV charger outside. | $800 |
| ELE2024-00541 | 2024-07-29 | Electrical | 4455 CADDO PKWY | Install a 240V 50A hardwired Tesla wall connector EV charger in the garage. | $800 |
| ELE2024-00484 | 2024-06-27 | Electrical | 6400 ARAPAHOE RD | FINAL INSTALL/ASSEMBLY/BOLT DOWN AND COMMISSIONING OF (QTY-1) 75KW TRITIUM RTM75 ELECTRIC VEHICLE CHARGER LOCATED AT ECO-CYCLE CHARM 6400 ARAPAHOE RD, BOULDER, CO 80303. ELECTRICAL | $2,500 |
| ELE2024-00483 | 2024-06-20 | Electrical | 5765 ARAPAHOE UNIT B | Install (QTY-1) 208V 30A circuit and (QTY- 2) 120V 20A circuits for shop equipment. | $2,000 |
| ELE2024-00455 | 2024-06-17 | Electrical | 803 ITHACA DR | Install a 240V 50A hardwired ChargePoint Home Flex EV charger in the garage. | $900 |
| ELE2024-00412 | 2024-06-07 | Electrical | 1415 PATTON DR | Install a 240V 50A hardwired ChargePoint Home Flex EV charger in the garage. | $800 |
| ELE2024-00405 | 2024-05-31 | Electrical | 816 ITHACA DR | 200A Service Upgrade and install (QTY-1) 240v 50A hardwired ChargePoint Home Flex EV charger in the garage. | $6,000 |
| ELE2024-00224 | 2024-04-03 | Electrical | 2217 HOLYOKE DR | Install a 240V 50A hardwired Rivian EV charger in the garage. | $650 |
| ELE2024-00179 | 2024-03-15 | Electrical | 3355 EASTMAN AVE | Install a 240V 50A hardwired Tesla Wall Connector EV charger in the garage. | $750 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
