COMPANY RECORD · BOULDER, CO
Deneuve Construction — permit history in Boulder, CO
Deneuve Construction appears on 109 Boulder permit records from 2015 through 2026, most often general construction (49.5% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 54 | 49.5% |
| Plumbing | 17 | 15.6% |
| Electrical | 14 | 12.8% |
| Mechanical / HVAC | 14 | 12.8% |
| Demolition | 9 | 8.3% |
| Fire protection | 1 | 0.92% |
6 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 20 |
| 2016 | 17 |
| 2017 | 28 |
| 2018 | 17 |
| 2019 | 3 |
| 2020 | 13 |
| 2021 | 4 |
| 2022 | 1 |
| 2024 | 2 |
| 2025 | 2 |
| 2026 | 2 |
Busiest year on record: 2017, with 28 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1525 SPRUCE ST | 2026-07-10 |
| 3125 34TH ST | 2026-06-16 |
| 2950 HAWTHORN AVE | 2024-03-29 |
| 2960 HAWTHORN AVE | 2024-03-29 |
| 891 12TH ST | 2022-03-21 |
| 1955 3RD ST 5 | 2021-04-08 |
| 1955 3RD ST 1 | 2020-12-04 |
| 1955 3RD ST 7 | 2020-11-24 |
| 1955 3RD ST 2 | 2020-11-24 |
| 1955 3RD ST 3 | 2020-11-24 |
| 1955 3RD ST 9 | 2020-11-24 |
| 1955 3RD ST | 2020-11-23 |
| 4025 NEVIS ST | 2020-11-17 |
| 2118 PEARL ST | 2019-10-03 |
40 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $15,323,534, median $82,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
109 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLD-MFD2026-00049 | 2026-07-10 | General construction | 1525 SPRUCE ST | Patch and repair damage to non-structural exterior wall at exist R-2 multifamily building (14000 SF). Minor repair to exist electrical systems in wall. Damage does not affect exist | $35,000 |
| DEM2026-00001 | 2026-06-16 | Demolition | 3125 34TH ST | Demolition of existing 615 sf wood framed outbuilding to make way for new permanently affordable apartments. | $0 |
| BLD-MFD2024-00099 | 2025-05-06 | General construction | 1525 SPRUCE ST | **7/1/25 REVISION to change the water heaters from electric to gas. New Plumbing Plans uploaded for review** Renovation of approx. 14,000 SF of existing office building into 6 res | $5,300,000 |
| DEM2024-00088 | 2025-03-06 | Demolition | 1525 SPRUCE ST | Interior non-structural deconstruction of exist office suites and lobby, 3 floors, 12,530 SF total. To include removal of plumbing fixtures. Processed as a full structure demolitio | $0 |
| BLD-MFD2023-00075 | 2024-03-29 | General construction | 2950 HAWTHORN AVE | Building 5 of the Diagonal Plaza redevelopment. It will contain 50 units of permanently affordable housing developed by Boulder Housing Partners. The building is 54,465 total SF, | $15,323,534 |
| BLD-MFD2023-00076 | 2024-03-29 | General construction | 2960 HAWTHORN AVE | Building 6 of the Diagonal Plaza redevelopment. It will contain 23 units of permanently affordable housing developed by Boulder Housing Partners. The building is a 3 story walk-u | $5,880,833 |
| BLD-MFD2021-00047 | 2022-03-21 | General construction | 891 12TH ST | Reconfigure and reconstruct the interior layout of the building to create sixteen (16) separate and self-contained residential units. New electrical service, 1000 AMPs. Related to | $7,869,841 |
| BLD-SFA2020-00010 | 2021-04-08 | General construction | 1955 3RD ST 5 | Units 5/6: Construction of (2) attached units. Each unit to have 3 bedrooms, 4.5 baths, a finished basement, a rooftop deck, (1) 1-car attached garage, (1) 1-car attached carport, | $2,386,218 |
| ELE2020-00342 | 2021-04-08 | Electrical | 1955 3RD ST 5 | Units 5/6: Construction of (2) attached units. Each unit to have 3 bedrooms, 4.5 baths, a finished basement, a rooftop deck, (1) 1-car attached garage, (1) 1-car attached carport, | $132,520 |
| PLB2020-00183 | 2021-04-08 | Plumbing | 1955 3RD ST 5 | Units 5/6: Construction of (2) attached units. Each unit to have 3 bedrooms, 4.5 baths, a finished basement, a rooftop deck, (1) 1-car attached garage, (1) 1-car attached carport, | $91,050 |
| MEC2020-00396 | 2021-04-08 | Mechanical / HVAC | 1955 3RD ST 5 | Units 5/6: Construction of (2) attached units. Each unit to have 3 bedrooms, 4.5 baths, a finished basement, a rooftop deck, (1) 1-car attached garage, (1) 1-car attached carport, | $77,090 |
| BLD-SFD2020-00111 | 2020-12-04 | General construction | 1955 3RD ST 1 | Unit 1: New construction of a two story single family detached dwelling with a full basement, an elevator, a rooftop deck, second story decks, an attached garage, and attached car | $1,193,103 |
| BLD-SFA2020-00008 | 2020-11-24 | General construction | 1955 3RD ST 7 | UNITS 7 & 8: New construction of 2-story duplex with finished basement, second floor patio and rooftop deck, attached garage and attached carport. Each unit will have 3 bedrooms an | $2,386,218 |
| BLD-SFD2020-00112 | 2020-11-24 | General construction | 1955 3RD ST 2 | Unit 2: New construction of a two story single family detached dwelling with a full basement, an elevator, a rooftop deck, second story decks, an attached garage, and attached car | $1,193,103 |
| MEC2020-00397 | 2020-11-24 | Mechanical / HVAC | 1955 3RD ST 3 | Units 3/4: Construction of (2) attached units. Each unit to have 3 bedrooms, 4.5 baths, a finished basement, a rooftop deck, (1) 1-car attached garage, (1) 1-car attached carport, | $77,090 |
| ELE2020-00343 | 2020-11-24 | Electrical | 1955 3RD ST 3 | Units 3/4: Construction of (2) attached units. Each unit to have 3 bedrooms, 4.5 baths, a finished basement, a rooftop deck, (1) 1-car attached garage, (1) 1-car attached carport, | $132,520 |
| BLD-SFA2020-00011 | 2020-11-24 | General construction | 1955 3RD ST 3 | Units 3/4: Construction of (2) attached units. Each unit to have 3 bedrooms, 4.5 baths, a finished basement, a rooftop deck, (1) 1-car attached garage, (1) 1-car attached carport, | $2,386,218 |
| BLD-SFA2020-00007 | 2020-11-24 | General construction | 1955 3RD ST 9 | UNITS 9 & 10: New construction of 2-story duplex with finished basement, second floor patio and rooftop deck, attached garage and attached carport. Each unit will have 3 bedrooms a | $2,386,218 |
| PLB2020-00184 | 2020-11-24 | Plumbing | 1955 3RD ST 3 | Units 3/4: Construction of (2) attached units. Each unit to have 3 bedrooms, 4.5 baths, a finished basement, a rooftop deck, (1) 1-car attached garage, (1) 1-car attached carport, | $91,050 |
| BLD-ACC2020-00047 | 2020-11-23 | General construction | 1955 3RD ST | *Construction of new single story pool equipment building. Accessory to dwelling units on property. Approved under TEC2019-00016. | $12,310 |
| BLD-ACC2020-00044 | 2020-11-23 | General construction | 1955 3RD ST | *Construction of new 52'x15' swimming pool with built in spa in SW corner of property. Approved under TEC2019-00016. | $186,818 |
| BLD-ACC2020-00167 | 2020-11-17 | General construction | 4025 NEVIS ST | *Construction of a 268 sf deck. | $19,500 |
| DEM2020-00030 | 2020-11-13 | Demolition | 1955 3RD ST | *Voided for inactivity - no inspections within 180 days* *Full structure demolition of a concrete block and brick commercial building, originally constructed in 1953 and shed (sou | $0 |
| DEM2020-00031 | 2020-11-13 | Demolition | 1955 3RD ST | *Voided for inactivity - no inspections within 180 days* *Full demolition of a distribution warehouse commercial building originally constructed in 1956. | $0 |
| PMT2018-00787 | 2019-10-03 | General construction | 2118 PEARL ST | Building C: New eleven-car detached garage associated with two townhomes buildings (Building A and Building B - eleven units total). Garage plans on the same plan set as Building | $346,400 |
| BLD-MFD2018-00086 | 2019-07-29 | General construction | 1440 PINE ST | Interior tenant finish for the "Grab-N-Go" commercial kitchen, service/sales area, and bathroom supporting the affordable housing project for Attention Homes. | $150,000 |
| BLD-NRE2018-00209 | 2019-04-18 | General construction | 1911 11TH ST | Initial tenant finish of 4th floor tenant space, Suite 400 (Rubicon Technology Partners), with associated MEPs. Core and shell for building under PMT2018-00395. | $257,888 |
| PMT2018-00777 | 2018-11-27 | General construction | 2118 PEARL ST | Building B: Six three-story townhomes with rooftop decks built over crawlspaces. Associated with the permit for a detached eleven car garage on the same set of plans. Refer to T | $2,531,800 |
| BLD-NRE2018-00123 | 2018-11-27 | General construction | 1911 11TH ST | Interior, non-structural tenant finish on the second floor to install (2) toilet rooms and a janitor closet/shower room. | $100,000 |
| BLD-MFD2018-00084 | 2018-11-13 | General construction | 4990 MOORHEAD AVE | Permit for the repair of one exterior balcony deck (unit 203) on a multi-family building. Scope will include the replacement of the ceiling finish in the corresponding unit below | $52,573 |
| BLD-MFD2018-00085 | 2018-11-13 | General construction | 4990 MOORHEAD AVE | Permit for the repair of three exterior balcony decks (unit 302, 306 and 308) on a multi-family building. Scope will include the replacement of the ceiling finish in the correspon | $38,738 |
| BLD-NRE2018-00140 | 2018-09-04 | General construction | 1537 PEARL ST | Replacement of windows on the 2nd floor, north facade of 1537 Pearl Street. Landmark Alteration Certificate approved, record #HIS2018-00231. | $14,055 |
| BLD-MFD2018-00058 | 2018-08-07 | General construction | 4990 MOORHEAD AVE | Permit for the repair of one exterior balcony deck (unit 203) on a multi-family building. Scope will include the replacement of the ceiling finish in the corresponding unit below | $52,573 |
| BLD-MFD2018-00055 | 2018-07-24 | General construction | 4990 MOORHEAD AVE | Permit for the repair of two exterior balcony decks (Units 202 and 204) on a multi-family building. Scope will include the replacement of the ceiling finish in the corresponding u | $52,573 |
| DEM2018-00042 | 2018-07-16 | Demolition | 2126 PEARL ST | Full structure demolition of a commercial building built in 1948, approximately 3,972 sf. Scope includes removal of asphalt and flatwork. | $0 |
| PMT2018-00939 | 2018-06-12 | General construction | 3050 BROADWAY | Flood proofing the first floor lobby of existing office building, in association with project scope covered under floodplain development permit, PMT2017-03972. Scope includes reloc | $22,275 |
| PMT2018-00395 | 2018-04-30 | General construction | 1911 11TH ST | Exterior restoration and remodel of existing 4-story commercial building. Exterior scope includes reconstruction consistent with approvals of HIS2017-00021, LUR2017-00021, and TEC2 | $1,501,048 |
| BLD-MFD2018-00003 | 2018-04-25 | General construction | 4990 MOORHEAD AVE | Permit for the repair of two exterior balcony decks (Units 206 and 208) on a multi-family building. Scope will include the replacement of the ceiling finish in the corresponding u | $16,000 |
| PMT2017-05347 | 2018-03-15 | General construction | 840 PEARL ST CU#1 | Interior tenant remodel for a banking institution to build out loan offices, conference rooms, open offices, and to relocate bathrooms. Suite to be demised into two tenant spaces | $635,834 |
| PMT2018-00468 | 2018-03-05 | General construction | 4990 MOORHEAD AV | Unit 205 - Repairs to an existing balcony structure that has been water damaged. The structural repairs address deteriorated engineered wood composite cantilevered balcony support | $10,000 |
| PMT2018-00632-DEM | 2018-02-16 | Demolition | 840 PEARL ST CU#1 | Interior, non-structural demolition associated with PMT2017-05347. Scope includes removal of plumbing fixtures, non-load bearing walls, drywall, limited MEP demo and finishes. | $0 |
| PMT2018-00579-MEC | 2018-02-13 | Mechanical / HVAC | 1023 WALNUT ST 400 | Installation of (1) new, 150k BTU, 60 inch dia. outdoor, gas fire pit on the roof top area for Corita Restaurant. Historic approval per HIS2018-00027. | $6,630 |
| PMT2017-05090 | 2018-02-12 | General construction | 1440 PINE ST | Shoring permit for sub-grade parking structure associated with PMT2017-03881. Not to encroach within right-of-way or easements. *Scope updated 11/27/2017 to include temporary shori | $298,324 |
| PMT2018-00448-DEM | 2018-02-05 | Demolition | 1911 11TH ST | *Voided for not providing the requested revision-resubmit information within 180 days.*Interior non-structural demolition only for floors 2 through 4, to initiate return to "grey b | $0 |
| PMT2017-03881-ELE | 2017-12-28 | Electrical | 1440 PINE ST | New construction. (3) stories above grade and (1) level of underground parking. 40 units of permanent supportive/affordable housing for homeless youth, administrative office spac | $790,000 |
| PMT2017-03881-MEC | 2017-12-28 | Mechanical / HVAC | 1440 PINE ST | New construction. (3) stories above grade and (1) level of underground parking. 40 units of permanent supportive/affordable housing for homeless youth, administrative office spac | $530,000 |
| PMT2017-03881-PLB | 2017-12-28 | Plumbing | 1440 PINE ST | New construction. (3) stories above grade and (1) level of underground parking. 40 units of permanent supportive/affordable housing for homeless youth, administrative office spac | $562,000 |
| PMT2017-03881-FIR | 2017-12-28 | Fire protection | 1440 PINE ST | New construction. (3) stories above grade and (1) level of underground parking. 40 units of permanent supportive/affordable housing for homeless youth, administrative office spac | $0 |
| PMT2017-01431 | 2017-10-10 | General construction | 1023 WALNUT ST 400 | Tenant Finish for a full service penthouse restaurant of 3, 068 sf of interior space including commercial kitchen area, dining room, bar area, and restroom facilities. Includes ass | $875,000 |
| PMT2017-02207-MEC | 2017-09-13 | Mechanical / HVAC | 1955 28TH ST | Relocation of cart corral from inside Hazel's, to the bike storage location in the front of the store. Relocation will include enclosing approximately 195 sf (.54% of previously ap | $1,300 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
