COMPANY RECORD · BOULDER, CO

Crb Builders, LLC — permit history in Boulder, CO

Crb Builders, LLC appears on 27 Boulder permit records from 2015 through 2026, most often general construction (48.1% of the record).

Permit categories

CategoryPermitsShare
General construction1348.1%
Electrical725.9%
Mechanical / HVAC518.5%
Plumbing27.4%

4 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
201516
20165
20172
20181
20263

Busiest year on record: 2015, with 16 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
5797 CENTRAL AVE2026-06-22
2500 CENTRAL AVE2026-06-22
2545 CENTRAL AVE2026-06-22
5550 AIRPORT BLVD2018-11-13
2590 CENTRAL AV2017-08-16
5555 AIRPORT BL2016-06-09

6 distinct addresses on record. Declared value on record runs from $0 to $4,232,895, median $82,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

27 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BLD-NRE2026-000602026-06-22General construction5797 CENTRAL AVEAdd guard rail to plan-East and plan-West walls on main building roof; add guard rail to open parapet walls on dock roof, add staircase to access main building roof from dock roof;$65,000
BLD-NRE2026-000582026-06-22General construction2500 CENTRAL AVEAdd bent sheet metal plate as dropped object prevention between parapet and screen wall on roof around the perimeter of the roof (1000 SF)$20,000
BLD-NRE2026-000592026-06-22General construction2545 CENTRAL AVEReplace roof hatch, roofing, roof framing, and ladder; add skylight screen paneling$40,000
BLD-ACC2018-001282018-11-13General construction5550 AIRPORT BLVDReplace the feeder from the generator building switchboard to the principal building switch board. Some structural site work is performed to support new overhead conduit and new pe$84,000
PMT2017-011372017-08-16General construction2590 CENTRAL AVTenant interior remodel of existing manufacturing space for KBI Biopharma. **1/22/18 - Resubmitted for changes to mechanical and electrical scopes.**$165,909
PMT2017-02142-CTR2017-05-18General construction2590 CENTRAL AVPermit for temporary construction trailer from 5/24/2017 through 8/01/2017 in parking area on south side of technical office building.$0
PMT2016-020012016-06-09General construction5555 AIRPORT BLInstallation of a quarantine stability chamber/walk-in freezer for Agilent Technologies. Scope of work includes associated electrical and mechanical work.$91,000
PMT2016-02001-ELE2016-06-09Electrical5555 AIRPORT BLInstallation of a quarantine stability chamber/walk-in freezer for Agilent Technologies. Scope of work includes associated electrical and mechanical work.$5,000
PMT2016-02001-MEC2016-06-09Mechanical / HVAC5555 AIRPORT BLInstallation of a quarantine stability chamber/walk-in freezer for Agilent Technologies. Scope of work includes associated electrical and mechanical work.$82,000
PMT2016-00353-ELE2016-01-26Electrical5555 AIRPORT BLTemp. construction trailer $0
PMT2016-00353-CTR2016-01-26General construction5555 AIRPORT BLTemp. construction trailer $0
PMT2015-05333-ELE2015-11-30Electrical5555 AIRPORT BLInstallation of a temporary construction trailer in drive at NE corner of parcel for addition to Agilent building.$0
PMT2015-05333-CTR2015-11-30General construction5555 AIRPORT BLInstallation of a temporary construction trailer in drive at NE corner of parcel for addition to Agilent building.$0
PMT2015-03575-ELE2015-11-23Electrical5555 AIRPORT BLAgilent Technologies-Two-story addition consisting of new H-2 production areas and support spaces to an existing facility. The total footprint of the addition will be 1,471 s.f. $361,574
PMT2015-035752015-11-23General construction5555 AIRPORT BLAgilent Technologies-Two-story addition consisting of new H-2 production areas and support spaces to an existing facility. The total footprint of the addition will be 1,471 s.f. $4,232,895
PMT2015-03575-MEC2015-11-23Mechanical / HVAC5555 AIRPORT BLAgilent Technologies-Two-story addition consisting of new H-2 production areas and support spaces to an existing facility. The total footprint of the addition will be 1,471 s.f. $1,083,759
PMT2015-03575-PLB2015-11-23Plumbing5555 AIRPORT BLAgilent Technologies-Two-story addition consisting of new H-2 production areas and support spaces to an existing facility. The total footprint of the addition will be 1,471 s.f. $242,385
PMT2015-044612015-11-12General construction5555 AIRPORT BLInstallation of a new RTU. Scope of work to include modifications to roof structure and associated mechanical and electrical.$63,885
PMT2015-04461-MEC2015-11-12Mechanical / HVAC5555 AIRPORT BLInstallation of a new RTU. Scope of work to include modifications to roof structure and associated mechanical and electrical.$49,998
PMT2015-04461-ELE2015-11-12Electrical5555 AIRPORT BLInstallation of a new RTU. Scope of work to include modifications to roof structure and associated mechanical and electrical.$4,487
PMT2015-04045-ELE2015-11-02Electrical5555 AIRPORT BLInterior remodel to install 2 walk-in stability chambers (freezer & fridge, 196 sq.ft. total). Scope of work includes associated MEs.$6,890
PMT2015-04045-MEC2015-11-02Mechanical / HVAC5555 AIRPORT BLInterior remodel to install 2 walk-in stability chambers (freezer & fridge, 196 sq.ft. total). Scope of work includes associated MEs.$102,500
PMT2015-040452015-11-02General construction5555 AIRPORT BLInterior remodel to install 2 walk-in stability chambers (freezer & fridge, 196 sq.ft. total). Scope of work includes associated MEs.$121,000
PMT2014-05128-MEC2015-01-29Mechanical / HVAC5555 AIRPORT BLAgilent Technologies Phase 4 interior remodel of 7740 sq.ft. Second floor fitout within an existing tilt-up concrete panel and steel structure building shell. No change to the ext$150,000
PMT2014-05128-PLB2015-01-29Plumbing5555 AIRPORT BLAgilent Technologies Phase 4 interior remodel of 7740 sq.ft. Second floor fitout within an existing tilt-up concrete panel and steel structure building shell. No change to the ext$150,000
PMT2014-051282015-01-29General construction5555 AIRPORT BLAgilent Technologies Phase 4 interior remodel of 7740 sq.ft. Second floor fitout within an existing tilt-up concrete panel and steel structure building shell. No change to the ext$591,026
PMT2014-05128-ELE2015-01-29Electrical5555 AIRPORT BLAgilent Technologies Phase 4 interior remodel of 7740 sq.ft. Second floor fitout within an existing tilt-up concrete panel and steel structure building shell. No change to the ext$150,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Boulder permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →